Search

You searched for: Start Over Photos Remove constraint Photos

Search Results

  • Abstract -- A watershed assessment was completed in the Clear and Foster Creek watersheds to evaluate existing conditions and make recommendations to protect or enhance watershed natural resources. Clear ...
    Citation
  • Abstract -- These files contain reports, GIS maps, photos, and accompanying metadata and files developed for the McKenzie-Willamette Confluence Study and the McKenzie River Subbasin Assessment of 2000....
    Citation
  • Abstract -- Road storm-proofing (sediment abatement) projects in the Lobster Creek watershed were monitored within 2 years of installation. Narrative descriptions of each project site and selected photos ...
    Citation
  • Abstract -- 64.1 stream miles on 11 South Coast streams were planted with various conifers from 1996 to 2001 to restore degraded riparian habitat. The average stocking/survival rate was 40% overall. Narrative ...
    Citation
  • Abstract -- The summer of 2006 culminated in the successful implementation of three consecutive phases of the End Creek Restoration Project located in the northwest Grande Ronde Valley within the Grande ...
    Citation
  • Abstract -- In early 2004, teh Elk Creek Watershed Council identified an undersized steel culvert that was blocking fish passage to more than a mile of salmonid habitat on private land on Dodge Canyon ...
    Citation
  • 312
    photo (color); Photocopy; "Interviewed by Stephen R. Mark on September 18, 1997; Transcribed by Renee Edwards, August 1998." - T.p.
    Citation
  • 298
    ill., maps, photo.; Includes bibliographical references (leaves 72-74); "RSP CRLA-N-2A."; "January 20, 1974."; Typescript (photocopy).
    Citation
  • 303
    photo; "Interviewed by Stephen R. Mark in March 1994; transcribed by Chris Prout, August 1997." - T.p.;
    Citation
  • 304
    photo (color); "Interviewed by Stephen R. Mark on August 25, 1998; transcribed by Renee Edwards, September 1998." - T.p.
    Citation
  • 309
    photo (color); "Interviewed by F. Owen Hoffman, July 31, 2004; transcribed by F. Owen Hoffman with editing from Stephen R. Mark, December 2005." - T.p.
    Citation
  • 9398
    "27 March 1998."; At head of title: Maines & Associates; Includes index
    Citation
  • 10356
    2 v.: ill., maps, photos (some color); "Volume One: Program" and "Volume Two: Reference." Both volumes: "Prepared for the National Park Service, Denver Service Center." - Cover/Title pages; Volume Two ...
    Citation
  • 1105
    Personnel of the Department of Geology and Geophysics of the University of Utah are conducting research directed toward the design of exploration systems suited to detection, delineation, and evaluation ...
    Citation
  • 229
    ill., forms; Thesis (M.S.)--Oregon State University;
    Citation
  • 232
    photo; "Interviewed by Stephen R. Mark on April 7, 1998; transcribed by Renee Edwards, September 1998." - T.p.;
    Citation
  • 233
    photo; "Interviewed by Stephen R. Mark on February 10, 1989; Transcribed by Chris Prout, August 1997." - T.p.;
    Citation
  • 234
    photo; "Interviewed by Stephen R. Mark on September 27, 1988; Transcribed by Darci Comolski, et al., 1994." - T.p.
    Citation
  • 247
    2 v.: ill., maps, photos (some color); "Volume One: Program" and "Volume Two: Reference." Both volumes: "Prepared for the National Park Service, Denver Service Center." - Cover/Title pages; Volume Two ...
    Citation
  • 260
    ill., maps, photos, plans; Report title; "June, 2003" - T.p.; Includes bibliographic references.
    Citation
  • 269
    ill., maps (some col.); Shipping list no.: 88-25-P; "October 1987."; "NPS D-2180A"--P. [3] of cover
    Citation
  • 273
    photo ; "Interviewed by Stephen R. Mark on January 23, 1992; Transcribed by Chris Prout, July 1997." - T.p.
    Citation
  • 278
    ill., photos; Cover title; "September, 1985."; Includes bibliographical references (p. 50-51)
    Citation
  • 193
    ill.; Report title; "A report to the Superintendent, Crater Lake National Park, March 1982." - T.p.; Includes bibliographical references (p. 11-16)
    Citation
  • 25. [Image] mcdonaldQ12
    19
    Project details the process, methods, systems, components, and techniques used in the completion of a design for a Photo-Bio Reactor control system, and the construction of a Control Demonstration Circuit ...
    Citation
  • 10434
    Photo album of geothermal sites in Japan
    Citation
  • Abstract -- Coos Bay is Oregon's largest estuary with the most active shipping port between San Francisco and the Columbia River. Coos Bay affords robust shellfish harvesting opportunities important to ...
    Citation
  • Abstract -- This project applied standard monitoring methods to measure the results of an in-stream restoration project. The site is at the confluence of the North and South Scappoose Creeks, where the ...
    Citation
  • Abstract -- This document describes a large and complex restoration project, beginning with an executive summary, and moving into site descriptions and background on the problems that instigated the project. ...
    Citation
  • Abstract -- Although tidal wetlands on the Oregon South Coast are limited in extent, they may be particularly valuable for a variety of wetland functions. This assessment combines the Brophy (2007) and ...
    Citation
  • 442
    Cover title; "March 1999."
    Citation
  • 477
    SIGNIFICANT FINDINGS The distribution of SOD2q values (measured sediment oxygen demand values corrected to 20°C [degrees Celsius]) had a median value of 1.6 g/m2/day (grams per square meter per day) in ...
    Citation
  • 488
    A monthly natural flow history was determined for the 1949 to 2000 period at the Keno gage of the Upper Klamath River basin in south-central Oregon. Included within the evaluation is an assessment of natural ...
    Citation
  • 490
    "May 2000"; From cover: Prepared for U.S. Department of Agriculture/Natural Resources Conservation Service, 2316 South 6th Street, Suite C, Klamath Falls, Oregon 97601. In Partnership with The Nature Conservancy, ...
    Citation
  • 499
    "Prepared for Klamath Basin Ecosystem Foundation, and the Upper Williamson River Catchment Group, in cooperation with the Upper Klamath Basin Working Group, and the Klamath Watershed Council."
    Citation
  • 648
    June 9, 1905
    Citation
  • 649
    June 9, 1905; Tule Lake is one of the proposed lakes to be drained and reclaimed under the Klamath River Project
    Citation
  • 650
    June 9, 1905
    Citation
  • 651
    June 9, 1905
    Citation
  • 652
    June 9, 1905
    Citation
  • 653
    June 9, 1905
    Citation
  • 654
    June 10, 1905
    Citation
  • 655
    June 10, 1905
    Citation
  • 656
    June 10, 1905 (the incorrect year, 1805, is printed under the photograph, the correct year, 1905, is written in pencil under it
    Citation
  • 657
    June 10, 1905
    Citation
  • 658
    June 10, 1905
    Citation
  • 659
    June 10, 1905
    Citation
  • 660
    June 11, 1905
    Citation
  • 661
    June 11, 1905
    Citation
  • 665
    An article summarizing the history of the United States Bureau of Reclamation; Photos of C.E. Grunsky, Consulting Engineer, and E.T. Perkins, author of this article, are included ; A map of Reclamation ...
    Citation