311. [Image] Link River Dam
KP-2186-R2 - Klamath Project. Link River Dam. View of river gate section taken from southwest side of excavated basin. Construction of concrete stilling basin by The California-Oregon Power Company; October ...Citation -
312. [Image] Link River Dam
No. 2 - Klamath Project. Link River Dam. Photo taken southeasterly of new spillway and stilling section as constructed in1952. Elevation at time of photo, 4142.1; February 4, 1953 at 3:30 p.m.; Photo by ...Citation -
313. [Image] Link River Dam
No. 3 - Klamath Project. Link River Dam. Photo taken southeasterly of spill section and stilling basin. 1680 cfs spill at time of photo; February 4, 1953 at 3:30 p.m.; Photo by The California-Oregon Power ...Citation -
314. [Image] Gerber Dam - condition of concrete
KP-2216-R2 - Klamath Project, Gerber Dam. View of left closure slot showing condition of concrete. California Projects; July 14, 1953; Photo by Donald M. WestphalCitation -
315. [Image] Malone Diversion Dam
KP-2217-R2 - Klamath Project, Malone Diversion Dam. View of downstream face of radial gates. Note disintegrated condition of concrete near bottom of retaining wall and separation of concrete in right wing ...Citation -
316. [Image] Clear Lake Dam
KP-2220-R2 - Klamath Project, Clear Lake Dam. Spillway and gatetender's quarters. Metal building at left houses the stop logs for the spillway. California Projects; July 15, 1953; Photo by Donald M. We...Citation -
317. [Image] Clear Lake Dam - outlet gates
KP-2221-R2 - Klamath Project, Clear Lake Dam. Outlet gates are satisfactorily operated with a 42-inch ratchet wrench which was provided in lieu of the recommended 5-foot dia. spoked handwheel. California ...Citation -
318. [Image] Clear Lake Dam - outlet works gate structure
KP-2222-R2 - Klamath Project, Clear Lake Dam. Outlet works gate structure showing condition of the concrete. California Projects; July 15, 1953; Photo by Donald M. WestphalCitation -
319. [Image] Lower Lost River Diversion Dam
KP-2223-R2 - Klamath Project, Lower Lost River Diversion Dam. View of canal bank successfully repaired and stabilized by paving and installation of underdrains under the concrete lining. California Projects; ...Citation -
320. [Image] Lost River Dam
KP-2225-R2 - Klamath Project, Lost River Dam. Downstream view of headworks for Lost River Diversion Channel. California Projects; July 15, 1953; Photo by Donald M. Westphal; Duplicate KP numberCitation