  • 311. [Image] Link River Dam
    2985
    KP-2186-R2 - Klamath Project. Link River Dam. View of river gate section taken from southwest side of excavated basin. Construction of concrete stilling basin by The California-Oregon Power Company; October ...
    Citation
  • 312. [Image] Link River Dam
    3025
    No. 2 - Klamath Project. Link River Dam. Photo taken southeasterly of new spillway and stilling section as constructed in1952. Elevation at time of photo, 4142.1; February 4, 1953 at 3:30 p.m.; Photo by ...
    Citation
  • 313. [Image] Link River Dam
    3026
    No. 3 - Klamath Project. Link River Dam. Photo taken southeasterly of spill section and stilling basin. 1680 cfs spill at time of photo; February 4, 1953 at 3:30 p.m.; Photo by The California-Oregon Power ...
    Citation
  • 3076
    KP-2216-R2 - Klamath Project, Gerber Dam. View of left closure slot showing condition of concrete. California Projects; July 14, 1953; Photo by Donald M. Westphal
    Citation
  • 315. [Image] Malone Diversion Dam
    3077
    KP-2217-R2 - Klamath Project, Malone Diversion Dam. View of downstream face of radial gates. Note disintegrated condition of concrete near bottom of retaining wall and separation of concrete in right wing ...
    Citation
  • 316. [Image] Clear Lake Dam
    3080
    KP-2220-R2 - Klamath Project, Clear Lake Dam. Spillway and gatetender's quarters. Metal building at left houses the stop logs for the spillway. California Projects; July 15, 1953; Photo by Donald M. We...
    Citation
  • 3081
    KP-2221-R2 - Klamath Project, Clear Lake Dam. Outlet gates are satisfactorily operated with a 42-inch ratchet wrench which was provided in lieu of the recommended 5-foot dia. spoked handwheel. California ...
    Citation
  • 3082
    KP-2222-R2 - Klamath Project, Clear Lake Dam. Outlet works gate structure showing condition of the concrete. California Projects; July 15, 1953; Photo by Donald M. Westphal
    Citation
  • 3083
    KP-2223-R2 - Klamath Project, Lower Lost River Diversion Dam. View of canal bank successfully repaired and stabilized by paving and installation of underdrains under the concrete lining. California Projects; ...
    Citation
  • 320. [Image] Lost River Dam
    3085
    KP-2225-R2 - Klamath Project, Lost River Dam. Downstream view of headworks for Lost River Diversion Channel. California Projects; July 15, 1953; Photo by Donald M. Westphal; Duplicate KP number
    Citation