Search
Search Results
-
29251. [Image] Settler's guide
This brochure was probably published by the United States Bureau of Reclamation. It was compiled to provide information on the requirements and recommendations regarding homesteading on Tule Lake.Citation Citation
- Title:
- Settler's guide
- Author:
- United States. Bureau of Reclamation
- Year:
- 1948, 2004, 2005
This brochure was probably published by the United States Bureau of Reclamation. It was compiled to provide information on the requirements and recommendations regarding homesteading on Tule Lake.
-
DOCS I 49.107: 89 ( 1.1) 89( 1.1) EVALUATION OF SITE SPECIFIC RESTORATION PROJECTS FOR THE ENTIRE KLAMATH RIVER BASIN. 1989 Klamath Field Review Comments The following comments are based primarily upon ...
Citation Citation
- Title:
- Evaluation of site specific restoration projects for the entire Klamath River basin
- Year:
- 1989, 2005
DOCS I 49.107: 89 ( 1.1) 89( 1.1) EVALUATION OF SITE SPECIFIC RESTORATION PROJECTS FOR THE ENTIRE KLAMATH RIVER BASIN. 1989 Klamath Field Review Comments The following comments are based primarily upon field observations made by Scott Downie and Andy Kier during the summer and autumn of 1989, Some of the review was made accompanied by personnel responsible for the projects and their comments are incorporated as well. In many streams individual project sites are linked and/ or similar in nature. This review generalizes these in its comments and ratings, but notes exceptions where required. Grades A- F were assigned, but like all grades lacking set criteria and good base- line information, they are somewhat subjective. Evaluations were based upon the observed or perceived physical response mf. de by the stream to the project, whether or not the project satisfied the objectives of the proposal, and whether or not the project appeared to have durable structure and function without maintenance or modification. Biological evaluation was impossible except to note observed fish at the time of the review. Cost effectiveness is again somewhat subjective without more front- end information, but based upon personal experience an attempt to measure product for cost entered into grade assignment. GENERAL: 1000, 1001, 1003: The racks on Bogus Crk, Scott R. & Shasta R were all operational Summer 1989. 1002: The Salmon R. weir operations were modified during our review period in response to public input: 1. The trap and weir will be staffed 24 hrs/ day. 2. Weir and trap operations will cease at 73 F. 3. Fishing will not be allowed below weir. 4. An alternate site will be developed ASAP. LOWER KLAMATH SUBBASIN: Ah Pah Creek ( 11006, 07, 08, 09, 10, 18-$ 123,928): A CCC, DFG, & Simpson Timber Co. project to provide improved access for adults into upper Ah Pah Crk., and to control sedimentation from failing banks in the treatment area. In Oct. 1989, the Hewitt Ramp structures were successfully passing coho and steelhead adults and juveni'es through a previous adult barrier section. Large wood and boulder cover elements had been placed in the associated pools. Treated banks were armored with rock filled gabions and planted with alder, willow and conifers. No evidence of sediment production to the stream from these treated slopes was observed. The workmanship and construction are sturdyand of high quality. Grade A. { Since we visited Ah Pah Crk. the day after the RNP bypass failure, the stream was loaded with suspended sediments) 1990 - Review Comments- Bluff Creek ( 11022, 23, 24, 31, 32-$ 212,000): Access provided through lower Bluff Crk's former barrier section is still passing adults and juveniles following the Feb. 1986 flood event. The boulder weirs and boulder clusters near the yearling rearing facility are providing limited spawning improvement, but they do contain pockets of gravel utilized by spawners. Both the weirs and clusters have provided some good quality summer rearing habitats, and also refuge areas during winter flows. Two cluster groups are now buried under large streambank failures. These events could have been exacerbated by the placement of the boulders too close to the now failed right bank. No large wood or brush cover elements were utilized in the structures, although some were available. Personnel explained that the extreme velocities and power at high discharges prevented incorporating these organic components into their instream structures on Bluff Crk, Grade C. Camp Creek ( 11029, 30-$ 125,000): Six boulder weirs were constructed by USFS to trap spawning gravels. Two of the six weirs are now scattered boulder clusters, having been rearranged by the stream. The surviving weirs have provided gravels and are being used by fish. The boulder groups, both designed and incidental, are providing some good quality rearing habitats and some pockets of gravel used for spawning salmonids. 3rade C. Cappell Creek ( 11027-$ 125,000): BIA artificial propagation project. Project has operated for one year. It has released 17,035 CWT Chinook. Typical of the lower river hatchery programs, securing desired numbers of late running chinook broodstocks is very difficult. A lot of money in terms of fry produced, but the facility start- up costs are now over and the annual cost will be much less than the initial investment. Grade C. Hunter Creek ( 11001, 11002, 11013-$ 19,328): A CCC, DFG, and Simpson project to improve Hunter Creek on a basin scale. CCC now have a thorough instream assessment and instream structure plan prepared by Clearwater Biostudies, inc. under contract to them. Instream structure work is now underway by CCC crews. The construction is of excellent quality and design. All upper stream barrier work is now completed. The dry lower reaches of the stream pose a dewatered, complete barrier to all adults running before early November in most years ( T. Payne, 1989). Some concern over future land management's effect on the stream in the event of a major flood occurrence. Grade B. McGarvey Creek ( 11025, 11014, 11003-$ 24,264): Status of the hatch box project is not known. The barrier work is all done and passing fish. Grade C. - Review Comments- Pecwan Creek ( 11021, 11036, 11028-$ 50,000): A total of 21,626 yearling chinook were released from 1982- 84 from this facility* They were from Iron Gate stocks and deemed not suitable for the restocking goals of the project area. Since 1985, the facility's production is not well documented, but 27,000 for the period 1985- 88 is estimated. None of the releases from this site have been CWT. The Pecwan site has been used as a broodstock source for Cappell Creek as well. Grade D. Red Cap Creek ( 11033, 34, 35-$ 70,000): USFS project has produced some impressive results. Failing banks have been armored and vegetated. A series of over thirty boulder weirs and clusters have provided some high quality spawning and rearing habitats. Large wood cover elements have been used somewhat in the project. The project reach is in a stream section of former generally poor habitats and low utilization by salmonids; they were abundant during our visits. There is a yearling pond adjacent to the treatment section. Grade A. Richardson Creek ( 11026-$ 25,200): This project removed a barrier to salmonids and is functional. Seemed expensive. Grade C. Salt Creek ( 11000, 11012-$ 18,944): CCC successfully stabilized failing banks. All barrier work is completed and functional. One of the few upslope erosion control projects in the review has controlled the sediment output from the roadway. There is a lot of product here for the money. Grade A. Surpur Creek ( 11005-$ 3,456): CCC removed barriers at a bargain price. Still functional. Grade A. Tarup Creek ( 11004, 11011, 11015, 16, 17-$ 77,024): CCC has a plan for the creek and instream treatments done under contract by Inter- Fluv Inc. The work outlined in the plan is now completed, and is of very high quality and design for the most part. The work involved barrier modification, instream structures, revegetation upslope as well in the riparian zone, and some upslope erosion control ( one site upslope was quite major, in fact). Tarup, regardless of all these improvements, has a low flow access problem in its delta. Grade B. Pine Creek ( 10019, 20-$- 0-): Not reviewed. Various streams ( 11019- 20-$ 550,000): This is the CCC operation fund for the Lower Klamath program. This ongoing general fund was not deemed suitable for field review or rating. However, our general observation of the CCC/ DFG Lower Klamath program has certainly produced a positive impression of their work and approach. - Review Comments- MIDDLE KLAMATH SUBBASIN: Beaver Creek ( 6000- 05, 6035, 6053, 6065, 6066-$ 124,400): The boulder cluster groups and weirs constructed on Beaver Creek are not well utilized at this time. Silts and sediments nave impacted the quality of the gravel associated with the structures to the extent that some cementing has occurred. Therefore, it is believed that utilization by spawners has also been effected. The structures designed for the provision of rearing habitats have done better, and some of course do both, some neither. Grade C, The rearing facility ( 6035) was closed in 1985, but there is now talk of re- opening it. 1980- 84 releases averaged 29,423 yearling chinook of Iron Gate origin. Grade C. The gravel seeding occurred in 1985 ( 6052) and no evaluation was considered possible in 1989, nor was any proffered by staff. The two screens ( 6065- 66) are functional, but require regular upkeep and periodic thorough maintenance. Grade B. Bluff Creek ( 6036-$- 0-): This is one of the Klamath system's highest production cooperative rearing facilities. It has averaged 66,462 chinook yearlings for the past three years. These fish are of Iron Gate origin. Although adult runs are up in Bluff Creek, there is little baseline data, and until the current brood no CWT's were done on the ponded fish. Grade B. Bogus Creek ( 6046- 47, 6053- 54, 6061-$ 94,750): Bogus Creek is heavily utilized by naturally spawning chinook of Iron Gate Hatchery origin as well as by stocks of its own. The projects designed to provide more and/ or better gravels for these fish have met with apparent success, since in almost all cases the projects are used by the spawners, but so is everything else. What that means in real incremental gains that can be credited to particular habitat treatments is therefore difficult to assess. CWT and DSM evaluation programs are ongoing. Grade C. Camp Creek ( 6037-$- 0-): This rearing facility switched from Iron Gate chinook stocks to natal stocks in 1987. Yearling releases dropped from an average of 27,533 to 14,573 after the change. This can be attributed to the difficulty in trapping adults in an open, high discharge system. Still, the fact that they are now utilizing later running stocks that are adapted to Camp Creek's flow regime and conditions counts for a great deal. The natal brood have been marked with alternating maxillary clips ( right one year, left the next) prior to release and some have been recovered as adults. Grade B+. China Creek ( 6008- 09-$ 9,300): Not reviewed. Report is that the access is good throughout the stream now. No report on the status of the structures. - Review Comments- Clear Creek ( 6010, 6068- 69-$ 66,400): Fish and Game's barrier removal is providing access successfully. Report is that access is good throughout Clear Creek at this time. Grade B. Coon Creek ( 6056-$ 30,000): This ladder passes steelhead, but DFG is not certain about coho. It also requires some light upkeep. Grade B. Cottonwood Creek ( 6049-$ 22,966): Gravel placed on these weirs needs to be re- seeded periodically at the cost of $ 2,000 each time. Grade D. ( 6057-$ 6,000): Not reviewed. ( 6055-$ 5,000): Ladder is on line and working well. Grade B. ( 6058- 60-$ 29,500): These screens are all on line and operational, but require light periodic maintenance which is conducted by the Yreka Screen Shop on a rotating basis. Grade B. ( 6070-$ 1,200): The potholes blasted to trap gravel have trapped sand instead, so the goal of creating spawning habitat was not met. However, fry usage and survival seem to be good in the resultant pools. Not a high cost project. Grade C. ( Total Cottonwood Creek budget: $ 64,666) Di1lon Creek ( 6071-$ 5,000): This functional project opened five miles of good habitat now utilized by steelhead and Chinook. Grade A. Doolittle Creek ( 6011-$ 2,300) : The treated log jam has not reformed and access is still good for steelhead. Grade C. Elk Creek ( 6012- 14-$ 41,000): The boulder weirs and clusters are now all installed and need flows for evaluation of performance. ( 6034, 6045-$ 10,000) : The washout pond has averaged 31,205 released Iron Gate chinook yearlings since 1984. Grade B. ( Total Elk Creek budget: $ 51,000) Grider Creek ( 6015- 16, 6038-$ 18,500): The falls are now passing fish successfully. Grade A. The boulder weirs have been successful in trapping spawning gravel and are being used by chinook. Grade A. The ponds have grown an average of 34,426 Iron Gate chinook yearlings since 1987. Grade B. Horse Creek ( 6062- 64, 6074-$ 35,000): The three screens are installed and operational, but require light maintenance. Yreka Screen Shop provides this on an alternating basis. Grade B. The log jam is no longer an access problem. Grade A. ( Extant diversion dam is a major problem on this creek) Humbug Creek ( 6017- 18-$ 5,300): The boulder weirs are not successful and are physically failing. Grade F. The log weirs have worked well and are providing spawning and rearing habitat. Grade A. In any event, ten miles of good quality habitat are blocked to salmonids by dredge tailings in lower Humbug Creek. - Review Comments- Independence Creek ( 6019-$ 5,000): The stream's mouth is still open and fish access it. Grade B. Indian Creek ( 6006, 6020- 28, 6039- 40, 6067, 6072~$ 200,600): AH modified former barriers are now passing fish. Grade A. The recent instream structures all appear to be performing to design; biological evaluation is underway now. Grade B. The spawning channel is used extensively by steelhead, and to a lesser extent by coho, but not by chinook. It is also a maintenance item ( ie. supplemental gravel). Grade D. The rearing ponds have averaged 74,134 Iron Gate yearlings since 1985. Grade B. Irving Creek ( 6029-$ 9,300): The use of small boulders to construct inadequately sized structures resulted in no net gain from this project. Grade F. Iron Gate Hatchery ( 6033-$-?-): The hatchery is modifying its operations to better cope with problems associated with temperatures, density, and release timing according to the hatchery manager. Grade C. Badger Flat and Tree of Heaven ( 6050- 51-$ 136,000): These spawning channels have both been unsuccessful due to design flaws. They require constant maintenance which is not possible during usage. Gravel seeding is an ongoing project. Grade F. Little Bogus Creek ( 6048-$ 20,000): These seeded weirs were not reviewed, but they are reported to be intensely utilized by spawners. However, some maintenance is also required. Pearch Creek ( 6041-$- 0-): These ponds are operated by the Orleans Rod and Gun Club and have good public involvement and educational value. About 9,000 steelhead of Salmon River origin are reared here. A lot of enthusiasm and local stocks. Grade A. Red Cap Creek ( 6042-$- 0-): This rearing pond has averaged 37,862 Iron Gate chinook yearlings since 1985 and is operated in a system that has also had significant habitat improvement projects recently completed. A CWT program would help evaluate both of these aspects of the Red Cap Creek endeavor. Grade B. Seiad Creek ( 6030- 31, 6073-$ 5,100): The barrier project has been successful. Grade A. The weir projects were not found and therefore not reviewed. Thompson Creek ( 6032, 6043-$ 5,000): The rearing ponds were closed in 1985. The instream structures were not reviewed. West Branch Creek ( 6007-$ 5,500): The weirs are used by steelhead for spawning, according to local observers; they seem functional. Grade C. - Review Comments- Wilson Creek ( 6007-$- 0-): This private rearing facility was not reviewed. According to locals, it is not in use at this time. SALMON RIVER: Black Bear Creek ( 5000-$ 11,000): This USFS project successfully provided access for steelhead into the creek, and it is currently being utilized. Grade A. Kelly Gulch ( 5002- 03-$ 9,500): This project was not reviewed, but USFS staff reported that the barrier was still not passing all fish attempting to access the system. Their evaluation is underway now. Knownothing Creek ( 5004- 06, 5021-$ 153,114): The removal of the diversion dams and other barriers resulted, in doubling the chinook and coho runs into the creek. Grade A. The weirs ( 5006*) were not completed at the time of the review. Delays were incurred because the rock was overshot resulting in boulders too small for the structures. Grade F. Nordheimer Creek ( 5007, 5008-$ 90,000): The log weirs ( 5007) failed. Grade F. The fishway ( 5008) is successful and passing fish. Grade A. Salmon River ( 5023, 5024-$ 8,000): This selective barrier was modified at a very reasonable cost and has improved access for al1 fish. Grade A. East Fork Salmon River ( 5013-$ 60,000): This project was not reviewed; USFS is evaluating now. South Fork Salmon River ( 5009- 12, 5014- 15, 5022, 5001-$ 176,200): ( 5009) This natal stock bioenhancement facility was located at a site with poor water temperature conditions for intense fish culture. Broodstock acquisition was also very difficult. The facility is now closed ( equipment will be relocated in the watershed, if possible). The project released 36,667 natal chinook smolts in the period from 1985 to 1987. Grade D. The boulder group projects were undergoing evaluation during the review period for biological response. The initial physical evaluation was not conclusive because many of the projects had not been subject to higher flows. Grade C. ( 5022) The " rough passage" area currently allows fish to pass without undue struggle. Grade B. ( 5001) The Blind Horse Creek weirs have not all been successful in providing spawning habitat. Many are trapping silt rather than spawning gravel. Rearing habitats are being provided by most of them, however. Grade D. - Review Comments- Specimen Creek ( 5016-$ 500): Steelhead now pass the treated log jam barrier. Another jam has formed above this site and requires monitoring and possible modification. Grade B. St. Claire Creek ( 5017- 20-$ 15,000): Steelhead now pass the modified barrier. The log weirs are holding gravel and in use by spawners. Juvenile cover is good associated with the weirs as well as the cover elements used in the project. The boulder weirs and clusters are also in place and in use. Grade A. SCOTT RIVER: Scott River and tribs. ( 4031- 4334 [ not inclusive]-$ 2, "* 15,810) : These Soil Conservation District projects primarily involved placing rip- rap armor at 304 different sites in the upper Scott system. Not all were reviewed, and although the rock is stable and in place, many were found to lack streamside vegetation that would provide important shade and cover for the stream and aquatic life. Some others were buried in decomposed granite, sand or silt and therefore had little benefit for fish by way of providing complex micro- habitats. The value of these projects would be much greater if some of these items were addressed. Grade C. French Creek ( 4001, 4016- 18-$ 32,100): The sediment check dam initially filled in one storm event. It was excavated but refilled during the next runoff event. A high maintenance approach that treats the symptoms of the watershed's chronic erosion problem. Grade F. The screens are all in place and functional, but are dependent upon periodic light upkeep provided by the Yreka Screen Shop. Grade B. Kelsey Creek ( 4002- 04-$ 147,500): The weirs work well and are used by all species for spawning and rearing. Grade A. The USFS spawning channel has not performed as hoped. Problems have occurred relating to channel liner failure. The average number of pairs using the channel during the period 1985- 88 were: nine chinook, three coho, and twelve steelhead. In 1989 no usage was observed. It is also a very costly installation. Grade D-. Kidder Creek ( 4020- 21-$ 26,000): Both screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Patterson Creek ( 4019-$ 9,000): This screen is in place and functional, but is dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. - Review Comments- Scott River ( 4005- 06, 4012- 15-$ 94,800): Although the gravels were ' cleaned' the sedimentation problem returned the next year, This treatment does not address the problem, but rather the symptoms and would require constant maintenance. Grade F. The boulder groups were not installed after gauging the rapid sedimentation rate. The four screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. East Fork Scott River ( 4010- 11-$ 20,000): These two screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Shakleford Creek ( 4009, 4022- 4030 incl., 4323, 4329-$ 343,720): ( 4009) The bank armor was not surveyed, but is reported to be stabilizing the soft banks. The fishery benefits are not known, ( 4022- 30) These nine screens are in place and functional, but are dependent upon periodic maintenance provided by tne Yreka Screen Shop, Grade B. ( 4323, 4329) The rip- rap bank armor is in place, but needs vegetation and cover elements added to increase fishery values. Grade C. Thomkins Creek ( 4007- 08-$ 6,500): The weirs are installed but are not highly utilized because of the recruited fine sediments now accumulated on them. Grade D. The fishway has provided access and is currently functional. Grade B. SHASTA RIVER: Parks Creek ( 3018-$ 42,000): These four screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Shasta River ( 3000- 04, 3005- 08, 3009- 17-$ 519,000): ( 3000- 04) These weirs have deteriorated over the past few years due to the use of undersized boulders in construction. Only about 10% of the effective structures remain. In 1989 only 32 redds were observed on the weirs. Very expensive ($ 363,000) spawning gravel. Grade D. The four fishways ( 3005- 08-$ 17,000) are all currently passing fish. Grade B. The nine screens ( 3009- 17-$ 139,000) are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. 12 0140402500 UPPER KLAMATH RIVER: Fal1 Creek ( 2000-$- 0-): The Fall Creek hatchery facility is on line and ready to augment Iron Gate's production. The site has very good water quality and can be instrumental in relieving crowding problems at Iron Gate.
-
29253. [Image] Klamath Basin Emergency Operation and Maintenance Refund Act of 2001 : report (to accompany H.R. 2828)
5 p.; Caption title; "November 13, 2001."Citation -
SIGNIFICANT FINDINGS The distribution of SOD2q values (measured sediment oxygen demand values corrected to 20°C [degrees Celsius]) had a median value of 1.6 g/m2/day (grams per square meter per day) in ...
Citation Citation
- Title:
- Sediment oxygen demand in Upper Klamath and Agency Lakes, Oregon, 1999
- Author:
- Wood, Tamara M.
- Year:
- 2001, 2005, 2004
SIGNIFICANT FINDINGS The distribution of SOD2q values (measured sediment oxygen demand values corrected to 20°C [degrees Celsius]) had a median value of 1.6 g/m2/day (grams per square meter per day) in the spring and 1.7 g/m2/day in the late summer. These values were well within the range of values in the literature for sites with similar sediment characteristics: primarily silty with at least a moderate amount of organic content. Over most of the lake there appears to be relatively little variation in SOD 14the interquartile range in values was 0.4 g/m2/day in the spring and 0.7 g/m2/day in the late summer. A significant exception was apparent in Ball Bay, where SOD in the late summer was greater than 10.2 g/m2/day. In the absence of primary production, an SOD of this magnitude could deplete the water column of oxygen in a few days. This measurement provided evidence that localized areas of very high SOD occur episodically in the bays, perhaps associated with large algal mats being trapped by the lake circulation patterns. A statistical test for a spring to late summer difference in the median values of SOD confirmed that SOD in the late summer (median value 1.7 g/m2/day) was significantly higher than in the spring (median value 1.2 g/m2/day). The difference was primarily due to seasonal changes in temperature; when SOD values were corrected to 20°C, there was no seasonal difference in the median values. There was no correlation between SOD20 and the sediment characteristics measured in this study: percent fines, organic carbon, and residue lost on ignition.
-
29255. [Image] The Klamath Basin sucker species complex
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.Citation Citation
- Title:
- The Klamath Basin sucker species complex
- Author:
- Oregon Cooperative Wildlife Research Unit
- Year:
- 2000, 2005
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.
-
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.
Citation Citation
- Title:
- Effects of water quality on growth of juvenile shortnose suckers, Chasmistes brevirostris (Catostomidae: Cypriniformes), from Upper Klamath Lake, Oregon
- Author:
- Oregon Cooperative Wildlife Research Unit
- Year:
- 2000, 2005
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.
-
ABSTRACT With the decreasing runs of natural fall chinook salmon* Oncorhmchus tshawytscha.inthe Klamath River basin, concerns were raised regarding the accuracy ma significance 01 me mainstem Klamath River ...
Citation Citation
- Title:
- Mainstem Klamath River fall chinook spawning Redd survey : fiscal year 1995 and 1996
- Author:
- Catalano, Mark
- Year:
- 1997, 2005
ABSTRACT With the decreasing runs of natural fall chinook salmon* Oncorhmchus tshawytscha.inthe Klamath River basin, concerns were raised regarding the accuracy ma significance 01 me mainstem Klamath River .1 chinook spawner estimates. The U.S. Fish and Wildlife Service, Coastal California Fish an - Wildlife Office (CCFWO) was funded through the Klamath River Fish and Wildlife Restoration Act (P. L.99-552) in the Fall of 1993-1996 to address this concern. The 1995 and 1996 survey season marked the third and fourth year that the CCFWO conducted investigations on the upper mainstem Klamath River to derive a reasonable estimate of natural * fall chinook spawners. A total of 339 redds were observed in the 1993 survey. In 1994 and 1995, redd counts increased to a total of 1,702 and 3,240 respectively. During the 1994 and 1995 spawning, seasons, there was evidence that unspawned surplus adult fall chinook salmon released from Iron Gate Hatchery (IGH) successfully spawned in the Klamath River. One hatchery fin clipped adult was observed spawning.30 miles downstream of the hatchery. In 1996, 1,372 redds were observed which wasa decrease of 43% from the previous year. There was complete retention of hatchery origin adults by IGH in 1996, although, the distribution of redds remained the same as previous years. With the new hatchery policy of excess return retention, mainstem escapement can now be considered a reasonable estimate of natural spawning adult chinook salmon. Reddsubstrate composition estimates remained consistent with previous spa- *:g survey data. Based upon 210 redd measurements from 1995-1996, the average redd size L ...e mainstem of the Klamath River was 9.6 nr. The average pit depth, mound depth, and adjacent depth for 1995-1996 was similar to previous survey results. Redds were most common along the wetted channel margins with numerous redds observed in side channels with suitable gravel and water velocities. Unlike 1993 and 1994 some redds were observed by 1995 and 1996 survey crews in rnid-channei areas. Recreational suction dredge mining was present throughout the survey from the confluence of Scott River downstream to the confluence of Indian Creek, although only two redds were observed on recent dredge tailings. Under the existing mining regulations, adverse impacts on redds could occur below the Scon River without protection of spawning areas.
-
29258. [Image] Relation between selected water-quality variables and lake level in Upper Klamath and Agency Lakes, Oregon
Relation Between Selected Water-Quality Constituents and Lake Stage in Upper Klamath and Agency Lakes, Oregon By Tamara M. Wood, Gregory J. Fuhrer, and Jennifer L. Morace SUMMARY Upper Klamath Lake is ...Citation Citation
- Title:
- Relation between selected water-quality variables and lake level in Upper Klamath and Agency Lakes, Oregon
- Author:
- Wood, Tamara M.
- Year:
- 1996, 2005, 2004
Relation Between Selected Water-Quality Constituents and Lake Stage in Upper Klamath and Agency Lakes, Oregon By Tamara M. Wood, Gregory J. Fuhrer, and Jennifer L. Morace SUMMARY Upper Klamath Lake is a large (140 square-mile), shallow (mean depth about 8 ft) lake in south-central Oregon that the historical record indicates has been eutrophic since its discovery by non-Native Americans. In recent decades, however, the lake has had annual occurrences of near-monoculture blooms of the blue-green alga Aphanizomenon flos-aquae. In 1988 two sucker species endemic to the lake, the Lost River sucker (Deltistes luxatus) and the shortnose sucker (Chasmistes brevirostris), were listed as endangered by the U.S. Fish and Wildlife Service, and it has been proposed that the poor water quality conditions associated with extremely long and productive blooms are contributing to the decline of those species. It has also been proposed that the low lake levels made possible by the construction of a dam at the outlet from the lake in 1921 have contributed to worsening water quality through a variety of possible mechanisms (Jacob Kann, Klamath Tribes, written com-mun., 1995). One such mechanism would be an increase in internal phosphorus loading from resuspended sediments (Jacoby and others, 1982), resulting from an increase in bottom shear stresses at lower lake levels (Laenen and LeTourneau, 1996), leading in turn to more intense algal blooms. Another possible mechanism is an earlier triggering of algal blooms. When early spring lake levels are low, greater light intensity at the sediment surface might speed recruitment of algal cells from the sediments. Sediment recruitment has been shown to be an important contributor to water column biomass increases in A. flos aquae (Barbiero and Kann, 1994) and Gloeotrichia echinulata (Barbiero, 1993). An earlier bloom could result in poor water quality conditions occurring earlier in the year, when young-of-the-year fish may be more susceptible to those conditions. Lake level can also influence water quality directly. An increased frequency of sediment resuspension at lower lake levels could increase chemical and biological oxygen demand, resulting in decreased dissolved oxygen concentrations. Sediment oxygen demand also may be enhanced at lower lake levels because it is concentrated over a smaller volume of water. Some compensation for increased oxygen demand at lower lake levels might be provided by increased reaeration, if the water column mixes from top to bottom more frequently. Based on the analysis of data that they have been collecting for several years, the Klamath Tribes recently recommended that the Bureau of Reclamation (Reclamation) modify the operating plan for the dam to make the minimum lake levels for the June-August period more closely resemble pre-dam conditions (Jacob Kann, written commun., 1995). The U.S. Geological Survey (USGS) was asked to analyze the available data for the lake and to assess whether the evidence exists to conclude that year-to-year differences in certain lake water-quality variables are related to year-to-year differences in lake level. The results of the analysis will be used as scientific input in the process of developing an operating plan for the Link River Dam. Datasets Two water-quality datasets were analyzed. The first was a series of hourly records of pH, dissolved oxygen, and water temperature, each of approximately a week's duration. The records were collected at 3 sites over 3 years, 1992 through 1994, with enough consistency to define the seasonal patterns. This dataset provided information about the diel extremes in dissolved oxygen and pH and the seasonal pattern in the diel cycle, but measurements were limited to a depth of 1 m(3.28 ft). The second dataset was a set of depth profiles of pH and dissolved oxygen and concurrent depth-integrated samples for nutrients and chlo-rophyll-a. The profiles were collected at approximately biweekly intervals at nine sites (seven in Upper Klamath and two in Agency Lake) over the 5 years 1990 through 1994. These depth profiles provided information on the depth-dependence of dissolved oxygen and pH, and allowed more extensive year-to-year comparisons than did the hourly records. Because measurements were made at each site only once during the sampling day, however, they did not capture the daily extremes in water quality. Lake level is measured daily by the USGS at three sites around the lake: Rocky Point, Rattlesnake Point, and near the city of Klamath Falls. These daily measurements are then used to compute a spatially weighted average of the lake level that is reported in the USGS annual Water-Data Report for Oregon. The average lake levels were used in this report. Two climatic datasets were used in this report; both were collected at the Klamath Falls airport. Air temperature was recorded as a daily maximum and daily minimum value. Cloud cover was quantized on a daily basis into one of seven levels. Because the focus of this study was primarily to examine possible relations between water quality and lake level, the lake level data provide an important context for the discussions that follow.
-
29259. [Image] Histopathological changes in gills of Lost River suckers (Deltistes luxatus) exposed to elevated ammonia and elevated pH
Lease, Hilary M., Histopathological Changes in Gills of Lost River Suckers (Deltistes luxatus) Exposed to Elevated Ammonia and Elevated pH, M.S., Department of Zoology and Physiology, December, 2000. ...Citation Citation
- Title:
- Histopathological changes in gills of Lost River suckers (Deltistes luxatus) exposed to elevated ammonia and elevated pH
- Author:
- Lease, Hilary Marian
- Year:
- 2000, 2008, 2005
Lease, Hilary M., Histopathological Changes in Gills of Lost River Suckers (Deltistes luxatus) Exposed to Elevated Ammonia and Elevated pH, M.S., Department of Zoology and Physiology, December, 2000. The Lost River sucker {Deltistes luxatus) is a federally listed, endangered fish species endemic to Upper Klamath Lake?a large, shallow hypereutrophic lake in southern Oregon. Sucker population declines in the lake over the past few decades are thought to be partly attributable to extreme water quality conditions, including elevated ammonia concentrations and elevated pH, that occur during summer cyanobacterial blooms. I analyzed structural changes in gills of larval Lost River suckers after they were exposed to elevated pH and elevated ammonia concentrations in chronic toxicity tests conducted in the laboratory. Histopathological changes in sucker lamellae were observed at ammonia concentrations that did not significantly decrease survival, growth, whole-body ion content, or swimming performance. Structural changes that I evaluated included O2 diffusion distance, lamellar thickness, hyperplasic and hypertrophic mucous cells, and infiltration of white blood cells into the lymphatic space. The increases in diffusion distance and lamellar thickness were statistically significant (P < 0.05). These gill changes are indicative of potentially compromised respiratory and ionoregulatory capacity. Because in this species gill structural changes appear to be a more sensitive indicator of stress in eutrophic water quality conditions than are the more traditional sublethal indices, gill histopathology might be useful for monitoring the health of Lost River suckers in Upper Klamath Lake.
-
CONTENTS PAGE I. THE SALMON AND THE FISHERY OF KLAMATH RIVER 2695 Introduction 2697 General Characteristics of Klamath River Salmon 2699 Species Other Than King Salmon 26916 The Spring Migration (Immigration) ...
Citation Citation
- Title:
- Salmon of the Klamath river, California : 1. The salmon and the fishery of Klamath river. 2. A report on the 1930 catch of king salmon in Klamath river
- Author:
- Snyder, John Otterbein
- Year:
- 1931, 2005
CONTENTS PAGE I. THE SALMON AND THE FISHERY OF KLAMATH RIVER 2695 Introduction 2697 General Characteristics of Klamath River Salmon 2699 Species Other Than King Salmon 26916 The Spring Migration (Immigration) 26918 The Summer Migration (Immigration) 26923 Sex Representation in the Migration 26933 Fish Increase in Average Weight and Size as the Season Advances 26939 Angling for Salmon 26943 Seaward Migration (Emigration) 26944 Obstructions in the River 26950 The Age at Maturity of Klamath King Salmon 26952 Marking Experiments 26967 Experiment in 1916 26968 Experiment in 1918 26968 Experiment in 1919 26968 Experiment in 1920 26968 Experiment in 1922 (Sacramento River) 26971 Experiment in 1922 (Klamath River) 26972 Experiment in 1923-1924 269 143 Ocean Tagging 26980 Depletion 26981 Notes Relating to the Salmon Catch of Klamath River 26988 The Ocean Catch 26992 Age Characteristics of the Ocean Catch 269108 Artificial Propagation in Klamath River 269111 Summary 18 269119 II. A REPORT ON THE 1930 CATCH OF KING SALMON IN KLAMATH RIVER 1823