Search
Search Results
-
1881. [Image] The Endangered Species Act (ESA) in the 109th Congress conflicting values and difficult choices
IB10144 04-22-05 The Endangered Species Act (ESA) in the 109th Congress: Conflicting Values and Difficult Choices SUMMARY The 109th Congress is likely to consider various proposals to amend the ...Citation Citation
- Title:
- The Endangered Species Act (ESA) in the 109th Congress conflicting values and difficult choices
- Author:
- Buck, Eugene H
- Year:
- 2006, 2008, 2005
IB10144 04-22-05 The Endangered Species Act (ESA) in the 109th Congress: Conflicting Values and Difficult Choices SUMMARY The 109th Congress is likely to consider various proposals to amend the Endangered Species Act of 1973 (ESA; P.L. 93-205; 16 U.S.C. ??1531-1543 ). Major issues in recent years have included changing the role of science in decision-making, modifying critical habitat procedures, reducing conflicts with Department of Defense activities, incorporating further protection and incentives for property owners, and increasing protection of listed species, among others. In addition, many have advocated enacting as law some ESA regulations promulgated during the Clinton Administration. The ESA has been one of the more contentious environmental laws. This may stem from its strict substantive provisions, which can affect the use of both federal and non-federal lands and resources. Under the ESA, species of plants and animals (both vertebrate and invertebrate) can be listed as endangered or threatened according to assessments of their risk of extinction. Once a species is listed, powerful legal tools are available to aid its recovery and protect its habitat. The ESA may also be controversial because dwindling species are usually harbingers of broader ecosystem decline: the most common cause of listing species is habitat loss. The authorization for spending under the ESA expired on October 1, 1992. The prohibitions and requirements of the ESA remain in force, even in the absence of an authorization, and funds have been appropriated to implement the administrative provisions of the ESA in each subsequent fiscal year. In the 108th Congress, two bills were reported by the House Committee on Resources, but not enacted, that would have amended the ESA to modify scientific peer review and critical habitat procedures. Interior appropriations measures funded Fish and Wildlife Service programs related to endangered species (P.L. 108-108 provided $265 million for FY2004; P.L. 108-447 provided $262 million for FY2005). P.L. 108-136 (Defense authorization) included an ESA amendment to direct that critical habitat not be designated on military lands under certain conditions when Integrated Natural Resources Management Plans are in effect. P.L. 108-137 (Energy and Water appropriations) prohibited use of FY2004 or earlier funds to reduce water deliveries under existing contracts for ESA compliance for the silvery minnow on the Middle Rio Grande River unless water is obtained from a willing seller or lessor; this prohibition appears to have been made permanent by ?205 of Div. C of P.L. 108-447. P.L. 108-148 (Healthy Forests Act) authorized hazardous fuels reduction projects on BLM and national forest lands, including those containing habitat for listed species; directed establishment of a healthy forests reserve program to promote recovery of listed species; and directed the Secretary of the Interior to provide property rights assurances to landowners enrolled in the healthy forests reserve program. Congressional Research Service ? The Library of Congress CRS
-
1882. [Image] Three great factors in Oregon's development
An article on the agricultural, industrial and economic development of the state of Oregon in the early 20th centuryCitation -
1883. [Image] The Klamath Basin sucker species complex
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.Citation Citation
- Title:
- The Klamath Basin sucker species complex
- Author:
- Oregon Cooperative Wildlife Research Unit
- Year:
- 2000, 2005
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.
-
1884. [Image] Monitoring of Lost River and Shortnose suckers and shoreline spawning areas in Upper Klamath Lake, 1999
Monitoring of Lost River and Shortnose Suckers at Shoreline Spawning Areas in Upper Klamath Lake, 1999 Prepared by: Rip S. Shively1 Mark F. Bautista2 Andre E. Kohler2 1 U. S. Geological Survey, Biological ...Citation Citation
- Title:
- Monitoring of Lost River and Shortnose suckers and shoreline spawning areas in Upper Klamath Lake, 1999
- Author:
- Shively, Rip S.; Bautista, Mark F.; Kohler, Andre E.
- Year:
- 1999, 2005
Monitoring of Lost River and Shortnose Suckers at Shoreline Spawning Areas in Upper Klamath Lake, 1999 Prepared by: Rip S. Shively1 Mark F. Bautista2 Andre E. Kohler2 1 U. S. Geological Survey, Biological Resources Division Klamath Falls Duty Station 6937 Washburn Way Klamath Falls, OR 97603 2 Johnson Controls World Services Inc. NERC Operation Post Office Box 270308 Fort Collins, CO 80527 Executive Summary In 1999, we sampled Lost River { Deltistes luxatus) and shortnose ( Chasmistes brevirostris) suckers from 5 April to 17 June at five shoreline spawning locations in Upper Klamath Lake ( UKL). Trammel nets were set to encompass identified spawning areas and were fished approximately 1- 1.5 hours before sunset until 3 hours after sunset or until 20 or more fish were captured. A total of 808 Lost River and 19 shortnose suckers were captured from Sucker, Silver Building, Ouxy, and Boulder springs, and Cinder Flats. The majority of Lost River suckers were captured at Cinder Flats ( 35%) and Sucker Springs ( 34%), followed by Ouxy Springs ( 16%), Silver Building Springs ( 12%), and Boulder Springs ( 3%). Males dominated the catch at all sites, but the sex ratios at Cinder Flats and Silver Building Springs were particularly skewed towards males. We recaptured 32 Lost River suckers that had been tagged during previous years sampling efforts. All of these fish, with the exception of two fish tagged at Ball Point in July, were originally tagged during the spawning season at shoreline spawning areas in UKL. This information provides further evidence that distinct stocks of Lost River suckers exist based on spawning location ( i. e., UKL and Williamson River). We also recaptured 23 Lost River suckers that were tagged in 1999 at shoreline spawning areas. Approximately half of these fish were recaptured at different locations than tagged indicating these fish were moving between spawning areas. The size offish captured at shoreline spawning areas decreased as the spawning season progressed, although the decrease in size was not as dramatic as reported in previous years. A limited number of shortnose suckers were captured at shoreline spawning areas in 1999, with a majority sampled after 1 May. Previous data for shortnose suckers at these sites is limited with respect to size, timing of spawning, sex composition, and relative numbers. Continuation of systematic sampling efforts at shoreline spawning areas will provide valuable information on the demographics and life history of Lost River and shortnose suckers utilizing these areas. Acknowledgements We thank Anita Baker, Brooke Bechen, Lani Hickey, and Tonya Wiley for assisting with sampling offish at shoreline spawning areas. Mark Buettner and Brian Peck ( U. S. Bureau of Reclamation) provided support during the early phases of our sampling as well as helpful comments on this report. We also appreciate the cooperation and support of Larry Dunsmoor ( Klamath Tribes) for identifying spawning areas, providing logistical support, and for the thoughtful review of this report. Cassandra Watson and Elizabeth Neuman produced finalized versions of tables and figures within this report and their efforts are greatly appreciated. This research was funded by the U. S. Geological Survey, Biological Resources Division through the Western Reservoirs Initiative. Introduction Severe water quality problems in Upper Klamath Lake ( UKL) have led to critical fisheries concerns for the region. Historically, UKL was eutrophic but has become hypereutrophic ( Goldman and Home 1983) presumably due to land- use practices within the basin ( USFWS 1993). As a result, the algal community has shifted to a monoculture of the blue- green algae Aphanizomemon flos- aquae and massive blooms of this species have been directly related to poor water quality episodes in UKL. The growth and decomposition of dense algal blooms in the lake frequently cause extreme water quality conditions characterized by high pH ( 9- 10.5), widely variable dissolved oxygen ( anoxic to supersaturated), and high ammonia concentrations (> 0.5 mg/ 1 unionized). In addition to water quality problems associated with A. flos- aquae, it is believed the loss of marsh habitat near the lake, timber harvest, removal of riparian vegetation, livestock grazing, and agricultural practices within the basin has contributed to hypereutrophic conditions. It is likely that these disturbances have altered the UKL ecosystem substantially enough to contribute to the near monoculture of A. flos- aquae. Investigations in 1913 documented the algal community as a diverse mix of blue- green and diatom communities, however, by the 1950' s A. flos- aquae was dominant ( USFWS 1993). The Lost River sucker ( Deltistes luxatus) and shortnose sucker ( Chasmistes brevirostris) are endemic to the Upper Klamath Basin of California and Oregon ( Moyle 1976). Declining population trends for both species were noted as early as the mid- 1960' s, however, the severities of the population declines were not evident until the mid- 1980' s. In 1988 the U. S. Fish and Wildlife Service listed both Lost River and shortnose suckers as endangered. Suspected reasons for their decline included damming of rivers, dredging and draining of marshes, water diversions, hybridization, competition and predation by exotic species, insularization of habitat, and water quality problems associated with timber harvest, removal of riparian vegetation, livestock grazing, and agricultural practices ( USFWS 1993). The U. S. Geological Survey, Biological Resources Division ( BRD) has been conducting field investigations on Lost River and shortnose suckers in UKL since 1994. The majority of these sampling efforts have focused on catching fish in UKL and the Lower Williamson River. Sampling in the Lower Williamson River focused on developing indices of relative abundance of Lost River and shortnose suckers. In 1999, Oregon State University continued sampling in the Lower Williamson River fishing trammel nets from April to August at four standardized locations. In addition to sampling efforts in the Lower Williamson River, BRD crews conducted periodic sampling at several shoreline spawning areas on the east side of UKL. This sampling was beneficial because it provided information on species composition, size, and sex ratios of suckers utilizing these areas. However, temporal changes in abundance may have been missed because consistent sampling never occurred throughout the entire spawning season ( Perkins et al, In preparation). Recently, there has been increased concern on the effects of water level management in UKL on spawning suckers. Information is needed on the timing, relative abundance, and distribution of sucker spawning in UKL to make informed decisions with respect to management of lake elevation. In 1999, we conducted systematic trammel netting surveys at Sucker, Silver Building, Ouxy, and Boulder springs and Cinder Flats along the east shore of UKL. In addition, we sampled periodically at Barkley Springs and Modoc Point to determine if suckers were utilizing these areas for spawning. This report summarizes data collected in 1999 on shoreline spawning populations of Lost River and shortnose suckers with emphasis on timing, species composition, sex ratios, and relative abundance. Methods We conducted systematic trammel netting surveys at five locations along the east shore of UKL ( Figure 1). We began sampling at Cinder Flats, Sucker, Silver Building, and Ouxy springs in early April with Boulder Springs added to the list of sampling sites on 27 April. In addition to these sites, we periodically sampled at Barkley Springs and Modoc Point ( Table 1). We attempted to sample each site twice per week although certain sites were only sampled once per week when catch rates of suckers were low ( i. e., less than 5 fish per evening). Trammel nets were fished for about 4 hours ( approximately 1- 1.5 hours before sunset until 3 hours after dark) or until we captured 20 or more fish. Nets used at individual sites varied in length from 15- 30 m, were 1.8 m tall with two outer panels ( 30cm bar mesh), an inner panel ( 3.8 cm bar mesh), a foam core float line, and a lead core bottom line. Generally, we set 1- 2 nets starting at the shoreline and extending out to encompass the perimeter of the identified spawning area. Nets were checked at approximately 1 hour intervals and captured fish were cut from the inner mesh panel and placed in a mesh cage and processed within 2 hours. Suckers were identified by species and sex, measured to the nearest mm ( fork length), inspected for tags ( both PIT and Floy tags), and examined for physical afflictions ( e. g., presence oiLernaea spp. and lamprey scars). If a sucker did not have a PIT tag, one was inserted with a hypodermic needle along the ventral surface 1- 2 cm anterior of the pelvic girdle. The catch per unit effort ( CPUE) of adult Lost River suckers was calculated for individual sampling locations for each evening sampled. Because identified spawning areas varied in size we used different length trammel nets to encompass the spawning areas. We did not attempt to standardize CPUE based on length of trammel nets used at each location. Results We sampled shoreline spawning areas from 5 April - 17 June capturing a total of 808 Lost River suckers and 19 shortnose suckers from 5 sites ( Table 1). Lost River and shortnose suckers were captured at Sucker Springs, Silver Building Springs, Ouxy Springs, and Cinder Flats, while only Lost River suckers were captured at Boulder Springs. No suckers were captured at Barkley Springs and Modoc Point ( Table 1). The majority of Lost River suckers were captured at Cinder Flats ( 35%) and Sucker Springs ( 34%; Figure 2). Males dominated the catch at all sites and were generally smaller ( mean length = 538 mm) than females captured ( mean length = 596 mm). In particular, sex ratios ( males to females) were most skewed at Cinder Flats and Silver Building Springs ( Figure 3). Large females (> 650 mm) were captured at most sites, except Boulder Springs, and the size range offish captured over time remained similar with the exception that a fewer large individuals (> 600 mm) were captured in the late sampling period ( 1 May - 17 June) as compared to the early sampling period ( 6- 30 April; Figure 4; Appendix Figure A). The catch of shortnose suckers was limited at all sites sampled. Most ( 12 of 19) of the shortnose suckers were collected at Sucker Springs, with 1- 3 fish captured at Cinder Flats, Ouxy Springs, and Silver Building Springs ( Table 1). We identified 8 males and 8 females during the sampling period and were unable to determine sex for three individuals. The mean size of shortnose suckers was 360 mm ( range 289- 528 mm) similar to data reported by Perkins et al. ( In preparation) from Sucker, Silver Building, and Ouxy springs. We observed the highest CPUE of Lost River suckers at Cinder Flats ( mean CPUE= 12.7/ h) followed by Sucker Springs ( mean CPUE= 6.0/ h), Silver Building Springs ( mean CPUE = 2.8/ h), and Ouxy Springs ( mean CPUE= 2.4/ h) ( Figure 5). On three occasions at Cinder Flats, 20 or more suckers were captured within an hour or less resulting in the termination of sampling for the evening. CPUE was calculated for sampling dates at Boulder Springs ( mean CPUE= 1.4/ h), although comparisons with other sites is not applicable because this site was not initially included in systematic sampling efforts. We did not calculate CPUE for shortnose suckers. We captured a total of 32 Lost River and 2 shortnose suckers that were tagged during previous years sampling efforts. The majority ( 96%) of these fish was originally tagged at shoreline locations ( Table 2), which is consistent with historical recapture data ( Appendix Table A). Two Lost River suckers were originally tagged at Ball Point in UKL in July, after the spawning season. In addition, most Lost River suckers were recaptured before 1 May, including 15 fish that were collected at Sucker Springs during two sampling occasions in March ( Figure 6). We also recaptured a total of 21 Lost River suckers that were tagged in 1999 at shoreline spawning areas. Approximately half of these fish were recaptured at different areas than where they were tagged, indicating that some suckers are moving between spawning areas within the season ( Table 3). Discussion Our sampling indicated the spawning period for Lost River suckers lasted from mid- March through the beginning of June at shoreline spawning areas in 1999. The catch of Lost River suckers was dominated by males at all sites sampled, particularly at Cinder Flats and Silver Building Springs. Perkins et al., ( In preparation) reported skewed sex ratios at shoreline spawning locations following the fish kills that occurred in UKL from 1995- 1997. However, the ratios we observed were considerably higher than those reported by Perkins et al., ( In preparation). At this time we are unable to determine the reason for the sex ratios observed. It is possible that males remain longer at the spawning areas than females making them more vulnerable to capture. Perkins et al., ( In preparation) observed spawning acts and reported that males remained near the actual site where spawning occurs while females move onto the spawning site only when ready to spawn. We captured 23 Lost River suckers twice in 1999 and all but one of these fish were males. However, it is difficult to determine if this percentage is due to males remaining at these sites longer than females or a reflection of the existing sex ratios. Another possible explanation could be the large numbers of males in the catch are from the 1991- 1993 year classes and females from these year classes have yet to be recruited into the adult population. The majority of males captured ( 81%) were between 475 - 574 mm. Age and growth information from Lost River suckers collected during the 1996- 1997 fish kills indicate these fish would be between 5- 9 years old ( USGS, BRD, 10 unpublished data). Perkins et al., ( In preparation) reported that male Lost River suckers migrating up the Williamson River begin to be recruited into the adult population starting at age 4+, while females did not begin to mature until age 7+ . These data were based on examining length frequency distributions and noting when fish from the 1991 year class, which is presumed to be a strong year class, began showing up in trammel net catches. Fish from the 1991 year class would have been age 8+ in 1999. Buettner and Scoppetone ( 1990) examined opercles from Lost River suckers collected during the 1986 fish kill in UKL and reported that individuals matured between 6- 14 years of age with the peak being 9 years. It is possible that in the next few years more females from the 1991- 93 year classes will be recruited into the adult population spawning at shoreline areas. Our data provides additional evidence that distinct stocks of Lost River suckers may exist based on fidelity to spawning area. Of the 32 suckers we recaptured from previous years sampling efforts, all but two were originally tagged at shoreline spawning locations. The two fish that were not originally tagged at shoreline spawning locations were captured at Ball Point in July and were not presumed to be spawning in this location. Perkins et al. ( In preparation) reported that of 316 Lost River and 11 shortnose suckers recaptured at shoreline spawning areas all were originally tagged at shoreline spawning locations. Continuation of systematic sampling at both shoreline spawning areas and the Williamson and Sprague rivers will continue to provide information on potential separation of spawning populations. The majority of recaptured fish were tagged during the first half of our sampling efforts including 13 fish that were recaptured on 25 March while sampling with Larry Dunsmoor of the Klamath Tribes. Historically, the majority of sampling effort at 11 shoreline spawning locations occurred prior to 1 May, which may explain why most recaptures were collected during the early part of our sampling period. In fiiture years, we plan to continue systematic sampling through June to determine if temporal aspects of spawning remain consistent between years. The size offish captured at shoreline spawning areas decreased as the spawning season progressed, particularly near the end of our sampling period, although the decrease was not as dramatic as reported by Perkins et al., ( In preparation). It is possible that individual timing of Lost River sucker spawning is affected by size. Scoppettone et al., ( 1986) observed that smaller, younger cui- ui ( Chasmistes cujus) at Pyramid Lake spawned at the end of the spawning season. We believe further investigation is needed to determine if differences in spawning timing among individuals is due to size or related to stock differences. A limited number of shortnose suckers were captured in 1999. Sampling continued well into June and was sufficient to detect spawning concentrations of shortnose suckers at these sites. Based on previous sampling conducted at shoreline spawning areas, there appears to be a decreasing trend in the number of shortnose suckers captured at these sites ( Perkins, et al., In preparation). Our sampling efforts at shoreline spawning areas on the east side of UKL represents the first time these areas have been systematically sampled during the spawning season. Continuation of systematic sampling at these areas is important to provide information on species composition, timing and duration of spawning, fidelity to spawning areas, sex ratios, size distribution, and relative abundance. How these 12 population characteristics change over time will also provide important insights into the population stability of Lost River and shortnose suckers in UKL. 13 Literature Cited Buettner, M. And G. Scoppettone. 1990. Life history status of catostomids in Upper Klamath Lake, Oregon. U. S. F. W. S. Completion Report. 108 pp. Goldman, C. R. and A. J. Home. 1983. Limnology. McGraw Hill, New York. Moyle, P. B. 1976. Inland fishes of California. University of California Press, Berkeley, CA. Perkins, D. L., G. G. Scoppettone, and M. Buettner. In preparation. Reproductive biology and demographics of endangered Lost River and shortnose suckers in Upper Klamath Lake, Oregon. U. S. Fish and Wildlife Service. 1993. Lost River ( Deltistes luxatus) and shortnose ( Chasmistes brevirostris) sucker recovery plan. Portland, Oregon. 108 pp. 14 Table 1. Summary of the shoreline locations sampled in Upper Klamath Lake and the number of Lost River ( LRS) and shortnose ( SNS) suckers captured in 1999. Sampling Dates Sampled Number of days Number of LRS Number of SNS Location ( range) Sampled Captured Captured Barkley Springs 4/ 5- 4/ 27 4 0 0 11 21 0 19 284 2 4 0 0 20 129 3 19 100 2 Sucker Springs 4/ 5- 6/ 17 20 274 13 Total 808 20 Boulder Springs Cinder Flats Modoc Point Ouxy Springs Silver Bldg. Springs 4/ 27- 4/ 6- 4/ 13- 4/ 6- 4/ 5- 6/ 17 6/ 17 4/ 21 6/ 17 6/ 17 15 Table 2. Summary of the number of Lost River suckers recaptured from previous years sampling efforts at shoreline spawning locations in Upper Klamath Lake, 1999. Site Originally Captured Boulder Springs Cinder Flats Ouxy Springs Silver Bldg. Springs Sucker Springs Ball Point Total Boulder Springs 0 0 0 0 0 0 0 Site Cinder Flats 0 1 0 0 4 2 7 Recaptured Ouxy Springs 0 0 0 1 1 0 2 in 1999 Silver Bldg. Springs 0 0 0 1 0 0 1 Sucker Springs 0 0 1 2 19 0 22 16 Table 3. Summary of the number of Lost River suckers recaptured at shoreline locations in Upper Klamath Lake originally tagged in 1999. Site Originally Captured in 1999 Boulder Springs Cinder Flats Ouxy Springs Silver Bldg. Springs Sucker Springs Total Boulder Springs 0 0 0 0 0 0 Site Cinder Flats 0 3 1 3 1 8 Recaptured Ouxy Springs 0 1 0 0 3 4 in 1999 Silver Bldg. Springs 0 0 1 1 0 2 Sucker Springs 0 2 0 1 6 9 17 1. Sucker Springs 2. Silver Building Springs 3. Ouxy Springs 4. Cinder Flats 5. Boulder Springs Figure 1. Map of Upper Klamath and Agency Lakes showing major tributaries and shoreline spawning areas sampled in 1999. 18 o I 50 45 40 35 30 25 20 15 10 5 0 BOULDER SPRINGS 50 45 40 35 30 25 20 15 10 5 0 D LRS Male • LRS Female * No Fish Jtt * * * * * * OUXY SPRINGS D LRS Male • LRS Female * No Fish 50 45 40 35 30 25 20 15 10 5 0 CINDER FLATS D LRS Unknow n _ r i • LRS Male • i_ r\ o remaie ic No Fish EII1IJ n „ * * * * 50 45 40 35 30 25 20 15 10 5 0 > SILVER BUILDING SPRINGS • LRS Unknow n • LRS Male • LRS Female * No Fish D n n p » * * * * * SUCKER SPRINGS ALL AREAS COMBINED • LRS Unknown D LRS Male • LRS Female • LRS Unknow n • LRS Male • LRS Female / / / / / / Figure 2. Summary of the number and sex of Lost River Suckers ( LRS) captured at shoreline spawning areas in Upper Klamath Lake, 1999 sampling. LRS unknown refers to captured individuals in which sex could not be determined. 19 70% -, 60% 50% 40% - 30% - 20% - 10% 0% CINDER FLATS _ o_ n= 283 9.1 : 1 8C O in io in om CD o i n 70% -, 60% - 50% - 40% - 30% - 20% - 10% - 0% - BOULDER SPRINGS y n 11 7 6 2 n= 21 9.5: 1 • g si n 8 CD omr o in oo § 70% 60% 50% 40% 30% 20% 10% 0% OUXY SPRINGS om CN oi n co o ini o in in SUCKER SPRINGS 70% -, 60% - 50% - 40% - 30% - 20% - 10% - 0% - n= 129 4.1 : 0 • _ o in CD omh omoo n= 273 3.5: 1 U • - - sC O oi n oi nm om o i n 00 70% 60% 50% 40% 30% 20% - 10% 0% SILVER BUILDING SPRINGS 70% 60% - 50% - 40% 30% 20% 10% - 0% 8 CM ALL SITES 8 CO JL 8 8 i n n= 99 8.1 : 1 • H „ - in in in CD h- 00 n= 805 5.3: 1 _ D • Male • Female 8 C N O O O O O O O O O O O i n o m oin i nin oCDi nCDo i n o i nco Fork length Figure 3. Length frequency histogram of male and female Lost River suckers ( LRS) captured at shore-line spawning areas in Upper Klamath Lake, 1999. The total number of LRS captured in 1999 and ratio of males to females are presented in the upper right hand corner of each graph. 20 E QJ D 160 i 140 120 100 80 60 40 20 0 A) 1999 LR Length Frequency ( 3/ 18/ 99- 4/ 30/ 99) DMale • Female • male = 457 xM = 541.4 i siaev - jo. y female = 60 xF = 611.9 stdev = 77.2 (—| Qy O ^ D 160 140 120 100 80 60 40 20 # 4? B) o - I— # $ # C) # # $ # 1999 LR Length Frequency ( 5/ 1/ 99 - 6/ 8/ 99) DMale • Female male = 219 xM = 531.4 5> lUeV — H 1 , , — i remaie = bB xF = 582 8 stdev = 68.1 • y . _ _ # ^ # # # # # # # ^ 1999 SN Length Frequency ( 4/ 30/ 99 - 5/ 30/ 99) 1 U 14 - 12 - 10 s p. A 2 0 - , Dmale • female y y • l i y n male = 8 xM = 363 stdev - 29.7 fpryiolp — ft xF = 357.1 stdev = 35.5 Forklength ( mm) Figure 4. Length frequency for Lost River ( LRS) and shortnose ( SNS) suckers captured at shoreline spawning areas in Upper Klamath Lake, 1999. Graphs represent A) LRS caught from March 19- April 30, 1999, B) LRS caught from May 1- June 8, 1999, and C) SNS caught from April 30- May 30, 1999 ( all SNS sampling days were combined due to limited SNS numbers). Four LRS with unknown gender were not included in the graph, two were caught before May 1st, and two after May 1st. Three SNS with unknown gender were not included in the graph. 21 BOULDER SPRINGS 20 i 18 16 - I 14 12 10 8 6 4 2 0 O) O) O) 0 ) 0 ) 0 ) 0 ) 0 ) in CM O) $ § I co o L? 5 LO O) O) O) g> g> g> o r^ •<*• n ^ CN CD CD CD 45 40 - 35 30 25 20 15 10 - 5 0 CINDER FLATS 0 ) 0 ) OO - f - r in in 0 ) 0 ) 0 ) C D C D C D 1 sw 20 18 16- 14- 12 - 10 8 6 4 OUXYSPRNGS Jl 0 ) 0 ) 0 ) 0 ) OO 0 ) 0 ) 0 ) C N I O C D O) O) O) O) Q < o z: ? z in CD CD 20- 18 - 16 14 - 12 - 10 - 8 6 4 - 2 - 0 - SILVER BUILDING SPRINGS ii , II p l, « u u •———,—— O) O) O) 0 ) 0 ) 0 ) in CN O) T- CM CM O) O) O) O) O) O) CO O h » - in O) O) O) ill CD CD CD SUCKER SPRINGS ALL SITES Figure 5. Summary of catch per unit effort ( CPUE) of Lost River suckers at shoreline spawning areas in Upper Klamath Lake, 1999. Note change in scale for the Cinder Flats and the All Sites graphs. 22 BOULDER SPRINGS 14 12 10 8 -| 6 4 2 0 n= 0 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) O) CD CN O) CD CO O T - C\| ^ ^ T- CNJ CO CO CO ^" ^" ^" OUXY SPRINGS 1 C D n= 2 14 1 8 4 2^ 0 oo S ^ ^ SUCKER SPRINGS ^ £ j CNJ in in to n= 22 - U-CD CO O j - CM CO 1 C D 14 12 -\ 10 8 -] 6 4 2 - 0 CINDER FLATS n= 7 LJl 0 ) 0 ) 0 ) 0 ) 0 ) T^ Cr^ N ^? ^ T- 14 12 10 - 8 6 4 - 2 0 SILVER BUILDING SPRINGS Tt x- 00 - CN CN in in in n= 1 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) 0 ) O) CD CN O> CD CO ^ CJ ^ ^ ^ CN co co ^ j- "< t ALL SITES O) O) O) O) O) O) in in in n= 32 I 0 0) in in in Figure 6. Summary of the number of Lost River suckers recaptured at shoreline spawning areas, Upper Klamath Lake, 1999. Recaptured fish were originally tagged betweeen 1988- 1998. 23 Appendix Table A. Summary of recapture data for Lost River Suckers in the Upper Klamath Lake Basin from 1985- 1999. Sampling was generally conducted from March- July of each year, although the emphasis in sampling was during the spawning period. Recapture data includes fish that were tagged with Floy and PIT tags. Site Last Recaptured Site Originally Captured Cinder Flats Ouxy Springs Silver Bldg. Springs Sucker Springs Williamson River Sprague River Upper Lake Middle Lake Total Cinder Flats 1 0 0 4 0 0 2 0 7 Ouxy Springs 0 1 1 1 0 0 0 0 3 Silver Bldg. Springs 0 0 1 6 0 0 0 0 7 Sucker Springs 0 0 6 288 4 0 0 0 298 Williamson River 0 0 0 1 6 3 0 0 10 Sprague River 0 0 0 0 1 13 1 0 15 Upper Lake 0 0 0 0 0 0 0 0 0 Middle Lake 0 0 1 0 1 0 0 0 2 Total 1 1 9 300 12 16 3 0 342 Appendix Table B. Summary of recapture data for shortnose suckers in the Upper Klamath Lake Basin from 1985- 1999. Sampling was generally conducted from March- July of each year, although the emphasis in sampling was during the spawning period. Recapture data includes fish that were tagged with Floy and PIT tags. Site Last Recaptured Site Originally Captured Ouxy Springs Silver Bldg. Springs Sucker Springs Williamson River Sprague River Lower Lake Middle Lake Total Ouxy Springs 1 0 0 0 0 0 0 1 Silver Bldg. Springs 0 0 0 0 0 0 0 0 Sucker Springs 1 0 0 0 0 0 0 1 Williamson River 0 0 0 4 0 0 0 4 Sprague River 0 0 0 2 3 0 0 5 Lower Lake 0 0 0 0 0 0 0 0 Middle Lake 0 0 0 1 2 0 5 8 Upper Lake 0 0 0 0 0 0 0 0 Reeder Road Bridge 0 0 0 0 0 0 1 1 Total 2 0 0 7 5 0 6 20 25 5 2iu5 Appendix Figure A. Summary of the size range of Lost River suckers captured at shoreline sampling areas in Upper Klamath Lake, 1999, by date sampled.
-
ABSTRACT With the decreasing runs of natural fall chinook salmon* Oncorhmchus tshawytscha.inthe Klamath River basin, concerns were raised regarding the accuracy ma significance 01 me mainstem Klamath River ...
Citation Citation
- Title:
- Mainstem Klamath River fall chinook spawning Redd survey : fiscal year 1995 and 1996
- Author:
- Catalano, Mark
- Year:
- 1997, 2005
ABSTRACT With the decreasing runs of natural fall chinook salmon* Oncorhmchus tshawytscha.inthe Klamath River basin, concerns were raised regarding the accuracy ma significance 01 me mainstem Klamath River .1 chinook spawner estimates. The U.S. Fish and Wildlife Service, Coastal California Fish an - Wildlife Office (CCFWO) was funded through the Klamath River Fish and Wildlife Restoration Act (P. L.99-552) in the Fall of 1993-1996 to address this concern. The 1995 and 1996 survey season marked the third and fourth year that the CCFWO conducted investigations on the upper mainstem Klamath River to derive a reasonable estimate of natural * fall chinook spawners. A total of 339 redds were observed in the 1993 survey. In 1994 and 1995, redd counts increased to a total of 1,702 and 3,240 respectively. During the 1994 and 1995 spawning, seasons, there was evidence that unspawned surplus adult fall chinook salmon released from Iron Gate Hatchery (IGH) successfully spawned in the Klamath River. One hatchery fin clipped adult was observed spawning.30 miles downstream of the hatchery. In 1996, 1,372 redds were observed which wasa decrease of 43% from the previous year. There was complete retention of hatchery origin adults by IGH in 1996, although, the distribution of redds remained the same as previous years. With the new hatchery policy of excess return retention, mainstem escapement can now be considered a reasonable estimate of natural spawning adult chinook salmon. Reddsubstrate composition estimates remained consistent with previous spa- *:g survey data. Based upon 210 redd measurements from 1995-1996, the average redd size L ...e mainstem of the Klamath River was 9.6 nr. The average pit depth, mound depth, and adjacent depth for 1995-1996 was similar to previous survey results. Redds were most common along the wetted channel margins with numerous redds observed in side channels with suitable gravel and water velocities. Unlike 1993 and 1994 some redds were observed by 1995 and 1996 survey crews in rnid-channei areas. Recreational suction dredge mining was present throughout the survey from the confluence of Scott River downstream to the confluence of Indian Creek, although only two redds were observed on recent dredge tailings. Under the existing mining regulations, adverse impacts on redds could occur below the Scon River without protection of spawning areas.
-
1886. [Image] Narrative history report of the Klamath Project land opening under Public Notice No. 47, 1948
Public Notice No. 47 of August 27, 1948, was prepared in conformity with recommendations for a standardized procedure made at the Salt Lake conference in March 1948; it opened to public entry 86 farm units ...Citation Citation
- Title:
- Narrative history report of the Klamath Project land opening under Public Notice No. 47, 1948
- Author:
- United State. Bureau of Reclamation
- Year:
- 1948, 2004
Public Notice No. 47 of August 27, 1948, was prepared in conformity with recommendations for a standardized procedure made at the Salt Lake conference in March 1948; it opened to public entry 86 farm units embracing 8,283 acres of irrigable land. Of nearly 24,000 application blanks sent out, 5,072 were returned during the simultaneous filing period. A five-man examining board placed 4,911 in the first priority group, 69 in the second priority group and rejected 91. The Regional Director reversed the action of the examining board in two instances making a total of 4,913 participating in the drawing. Applications were received from 39 states, the District of Columbia and the Territory of Alaska. California supplied 50% of all applications considered in the first priority group; Oregon supplied 27%; Utah supplied 6%; and the rest of the states supplied the remaining 17% The examining board interviewed 94 persons of 104 who were notified to appear for personal interviews after the drawing. Of those appearing for interviews, five refused to accept units in area "A" and three were rejectees whose appeals were later denied by the Regional Director. Of the ten who failed to appear for interview, five relinquished their award in writing; four were relegated to the end of their priority list, and one was the victim of an airplane accident. As the result of the drawing and subsequent interviews, 1.4% of the applicants from California 2.5% of the applicants from Oregon and 1.3% of the remaining applicants from other states were awarded farm units. Ten of the 39 states, from which applications were received, were represented in the settlement of the 86 farm units. Of the 23 who selected units in area "A", only two availed themselves of options to lease additional land in the Tulelake sump area* Apparently, because of high rental fees, the majority of the area "A" settlers could not afford to lease lands supplemental to their homestead. Therefore, since the development of area "A" lands will be a costly procedure, it is possible that in the future there may be cases of relin-quishment of units due to the homesteaders' inability to meet expenses. First unit was awarded on March 9, 1949; the last unit was awarded on June 20, 1949.
-
Cover title; At head of title: Department of the Interior, General Land Office
Citation -
Abstract The Secretaries of Agriculture and the Interior propose limited changes to language about how to demonstrate that projects follow the Aquatic Conservation Strategy, part of the Northwest Forest ...
Citation Citation
- Title:
- Final supplemental environmental impact statement: for clarification of language in the 1994 record of decision for the Northwest Forest Plan; national forests and Bureau of Land Management districts within the range of the northern spotted owl: proposal to amend wording about the aquatic conservation strategy
- Author:
- United States. Department of Agriculture. Forest Service; United States. Department of the Interior. Bureau of Land Managemen
- Year:
- 2003, 2006, 2005
Abstract The Secretaries of Agriculture and the Interior propose limited changes to language about how to demonstrate that projects follow the Aquatic Conservation Strategy, part of the Northwest Forest Plan. Projects needed to achieve Northwest Forest Plan goals have been delayed or stopped due to misapplication of certain passages in the Aquatic Conservation Strategy. The agencies are responding to the underlying need for increased agency success planning and implementing projects, to the extent that the current wording has hindered the agencies ability to follow Northwest Forest Plan principles and achieve its goals. The goals of the Northwest Forest Plan cannot be achieved without project implementation. Three alternatives are considered in the Final Supplemental Environmental Impact Statement, No Action, the Proposed Action, and Alternative A. No Action would not change existing language within the Aquatic Conservation Strategy. The Proposed Action and Alternative A would make l
-
1889. [Image] Klamath Falls Resource Area Planning Update, Winter 2003
U. S. Die artment sf the Interior Bu. rea. u oP L and Management K I W ~ Falls R~& G urnw . 2795 & tdeaonAvepue, BuMng #% Klamath F~ HSO, r egon 97803 . . January 2004 Klamath Falls Resource Area Planning ...Citation Citation
- Title:
- Klamath Falls Resource Area Planning Update, Winter 2003
- Author:
- United States. Bureau of Land Management. Klamath Falls Resource Area Office
- Year:
- 2003, 2004
U. S. Die artment sf the Interior Bu. rea. u oP L and Management K I W ~ Falls R~& G urnw . 2795 & tdeaonAvepue, BuMng #% Klamath F~ HSO, r egon 97803 . . January 2004 Klamath Falls Resource Area Planning Update Winter 2003 United States Department of the Interior BUREAU OF LAND MANAGEMENT Klamath Falls Resource Area 2795 Anderson Avenue, Building 25 Klarnath Falls, Oregon 97603- 7891 Phone: ( 541) 883- 6916 1 Fax: ( 541) 884- 2097 E- Mail Address: Username@ or. blm. gov Website: http: llwww. or. blrngov/ L. akeview/ kfra/ index. htrn KLAMATH FALLS RESOURCE AREA PLANNING UPDATE Winter 2003 The primary purpose of this Planning Update is to inform you about the activities on the Klarnath Falls Resource Area. It is my desire to keep you informed about issues, activities, and opportunities I think are important to the public. More importantly, I am seeking ideas and comments from those who may be affected by multiple- use management programs here on the resource area. This planning update is organized to make it easy for you to find projects of most interest. Projects have been arranged into categories ( i. e., Recent Decisions, New Projects, On- going Projects, and Environmental Education Activities). In addition, each of these categories is sorted by resource topics ( e. g., Lands Program, Timber Sales, etc.). The table will give you a brief description of activities occurring within the Klamath Falls Resource Area and for most projects a location. Refer to one of three maps following the table, for locations of projects. Additional information can be obtained fi- om the contact listed in the project descriptions. If you have any concerns about the proposed actions, please call the Klarnath Falls Resource Area and ask for the " Contact" person listed or the Resource Area Planner as soon as possible. The earlier you get involved, the more capability we have to adjust or change planned actions. Also be alert for news releases and public notices published in the Herald and News as projects reach stages for public involvement. If you want to provide comments to a specific environmental assessment, please send or deliver your written comments addressed to the Field Manager, Klamath Falls Resource Area, by the close of, or postmarked by the last day of the comment period. Your comments and concerns are welcomed, and could influence the final decision on these projects. I would appreciate any comments or suggestions you may have regarding this p l h i n g update or how it could be improved to make it more useful to you. Thank you for your continued interest in BLM's management of public lands. If you have any questions on this planning update, stop by the office or call ( 541) 883- 6916. Jon Raby, Field Manager Klamath Falls Resource Area BUREAU OF LAND MANAGEMENT ' KLAMATH FALLS RESOURCE AREA 2795 ANDERSON AVENUE, BLDG. # t5 KLAMATH FALLS, OR 97603 PHONE NUMBER: ( 541) 883- 6916 MAP PROJECT TITLE & DESCRIPTION LOCATION SPECIAL AREAS STATUS OF COMPLETION CONTACT REF. # AFFECTED ANALYSIS DATE CX = Categorical Exclusion, DNA = Determination of NEPA Adequacy, EA = Environmental Assessment, EIS = Environmental Impact Statement Klarnath Falls Resource Area, Winter 2003 Planning Update - Page 2 New Projects - Watershed Map # 4 T39S. R14E, Secs. 10, 11,14, 15 Norcross Vegetation Treatments - Thin ponderosa pine, remove invasive juniper, restore native vegetative communities ( grass, shrub, pine), and monitor the effects of treatment on vegetative and hydrologic resources. New Projects - Roads and Facilities None Map 1 EA in progress. Road crossing Spencer Creek Spencer Creek Culvert Replacement Spencer Watershed Riparian Fence Reconstruction New Projects - Recreation I Topsy Recreation Site Improvements - Campground water 1 T40S, R7E, Sm. 1 Map # I0 1 system and boat ramp improvements None I DNAS~ nnrrr2004 I Fall 2005 New Projects - Range Management Fall 2007 Fish passage Riparian Protection Mike Turaski in progress CX in progress Map #' DNA Spring 2004 Pitch Log Creek, Long Branch Creek, and Antelope Creek within the Gerber Block Gerber Watershed Riparian Fencing - Emposed project to construct livestock exclosure fencing along about 1.1 miles of Pitch Log Creek, 1.5 miles of Long Branch Creek, and 1.7 miles of Antelope Creek. Maintain fences as riparian exclosures or riparian pastures. Monitor effects of reduced livestock use on vegetation and streambank conditions. New Projects - Timber Management Contract - Fall 2004 Construction - 2005. Summer 2004 Riparian protection Fall 2004 Andy Hamilton Andy Hamilton Dana Eckard Jenny Creek Watershed South Gerber Block Jenny Creek Watershed South Gerber Block I I I None 1 None Jenny Creek EA - Purpose of this EA is to address a variety of forest health and restoration treatments in the Jenny Creek Watershed. Proposed treatments may include; commercial timber sales, non- commercial silvicultural treatments, riparian restoration treatments, aspen stand restoration and road restoration projects. South Gerber EA - Purpose of this EA is to address a variety of forest health and restoration treatments in the South Gerber Block area. Proposed treatments may include; commercial timber sales, non- commercial silvicultural treatments, riparian restoration treatments, juniper woodland treatments, aspen stand restoration and road restoration projects. LOCATION Recent Decisions - Lands Program 1 I I I I I Upper Spencer Creek Road Treatments - Road Upper Spencer Creek I' Implementation in July obliteration, decommissioning, realignment, improvement, T38S, R6E Sections Riparian Resenres DDRBs I 2M Mike Turaski and stream crossing removal. 15 and 23 12123103 Recent Decisions - Wildlife M Map 1 # 43 ecisions - Waters Map 1 # 21 Willow Valley Habitat Enhancement Willow Valley Warm water fishexies Implementation pending Reservoir ODFW involvement. Section 1 Exploration Quarry Expansion Drilling - Authorization for ODOT to conduct exploratory drilling in and around an existingpit to identify a source for additional mineral material. Scott Snedaker I I I I I I Recent Decisions - Fuels Treatment T40S, R6E, Sec. 1. N112NW114 Map 1 # 3 None Boundary Springs Yarding and Removal of Cut Juniper - Purpose of this project is to remove juniper boles in previously treated areas to reduce fuel accumulation and promote commercial use of juniper. None Ben Hall 1 & 2, Cerber Potholes, Sehnipps, and FIZ 95- 71 Juniper Yarding - to remove juniper boles in previously treated areas to reduce fuel accumulation and promote commercial use of juniper. Fint 360 acres yarded and material sold to Area FTZ- 1 04 utilization local mill ( REACH) that utilizes juniper. Exploration initiated as weather permits. Rebecca La& Linda Younger Mike Bechdolt Various Mike Bechdolt Klamath Falls Resource Area, Winter 2003 Planning Update - Page 3 Fuel treatment, juniper utilization DNA completed. Project on hold. BUREAU OF LAND MANAGEMENT KLAMATH FALLS RESOURCE AREA AVEl PHONE NUMBER: 2795 ANDERSON AVENUE, BLDG. # 25 ' E ( 541) 8836916 SPECIAL AREAS STATUS OF AEFECrED ANALYSIS PROJECT TITLE & DESCRIPTlON LOCATION AEFErnD COMPLETION DATE CONTACT r~ ann~ ng~ na~ ysis~ lrnp~ ernen- r Gareinoenr al RMP Evaluation~ Revision- In the final settlement agreement to the American Forest Resource Council vs. Bureau of Land Management ( BLM) litigation, the BLM is directed to revise Resource Management Plans ( RMPs) in western Oregon by December, 2008. The BLM began the revision process in 2003, evaluating current plans and developing a project preplan. Project status information will be posted on the District website. Formal scoping is expected in the second half of calendar year 2004. RMP Revision - FY 2008 None Resource Area Wide All Resources Evaluation in progress Don Homeins GerberlWillow Valley Coordinated Resource Management Plan ( CRMP) Watershed Analysis. - A local planning team of private landowners, StatelFederal land managers, and concerned citizens recommends future project implementation on private land in CRMP area. CRMP meetings/ discussions are continuing Map 1 # 5 GerberNillow Valley Watershed Completion date open-Rivate Lands ended Don Homeins Lany Frazier Wild and Scenic River designation, Area of Critical Concern, T& E spp. Map l # 28 Upper Klamath River Management Plan DEE - Develop a management plan in response to Wild and Scenic Riven Act requirements for river segment approx. 20 miles long encompassing 6,400 acres. Klarnath River - J. C. Boyle Reservoir, Oregon, to Copco One Reservoir, California Draft EIS released 511 612003. Comment period closed 8/ 13/ 2003. FEIS December 2004 Upper Klamath Basin and Wood River Wetland Resource Management Plan Amendment for the Fourmile Creek portion of this area. The purpose of this project is to amend the Upper Klamath Basin and Wood River Wetland RMP EIS to designate the Fourmile Creek area as an Area of Critical Environmental Concern. Riparian Wetland Area of Critical Environmental Concern ( ACEC) Draft EIS to be prepared. Specific schedule and completion date unknown. ACEC Evaluation submitted to District Manager, October 2000. Map 1 # 29 Fourmile Creek Wetland Lou Whiteaker Lany Frazier Draft MOU presented to the Tribal Council on 2/ 22/ 2000. Waiting for Tribal feedback. - -- Unknown Memorandum of Understanding ( MOU) between the Klamath Tribes and BLM for Coordination on Management Issues. - The proposed MOU identifies a process to coordinate tribal involvement with BLM management actions on public lands. Late- Successional Reserve ( LSR) Assessment. A single LSR Assessment was prepared to assess all 19 Unmapped LSRs designated within the resource area and develop management recommendations for these areas to restore or maintain late successional habitat. Former Tribal None Lakeview District Lands - None Draft submitted to and pending approval from the Regional Ecosystem Office ( REO). BLM lands west of Highway 97 covered by the Northwest Forest Plan Unmapped Late Successional - Reserves. Analysis is complete. - ou Whiteaker Klamath Falls Resource Area, Winter 2003 Planning Update - Page 4 2795 ANDERSON AVENUE, BLDG. # 25 KLAMATH FALLS, OR 97603 541) 8834916 STATUS OF COMPLETION DATE CONTACT AFFECTED I ANALYSIS I - Map 2 # 46 - None Map 1 -# 7 Map 1 # 22 - None Map 2 # 44 Map 2 # 30 Oak Thinning - Thin 100 acres of oak woodland to restore plant communities and reduce potential for stand replacing wildfires and overall fire management costs. Noxious Weed Treatments - contain1 reduce noxious weed populations using integrated pest management ( manual, mechanical, chemical, and biological control methods). Activities tier to KFRA Integrated Weed Control Plan ( IWCP) and EA- OR- 014- 93- 09 approved July 21, 1993. T40S, R6E, Sec. 35 T41S, R6E, Sec. 3 and 10 T41S, WE, Sec. 1 Weed- infested sites throughout the Klamath Falls Resource Area Bitterbrush Planting - - Various locations Ongoing Planning/ Analysisflmplementation - Vegetation Treatments I I I -- -- - Horton Rim I Windy Ridge Juniper Removal - Juniper treatment for fuel reduction and wildlife habitat inmovement GerberlWillow Valley Riparian Conifer Treatments - removing invasive juniper from riparian areas in the Gerber Block G& I Willow Valley Watersheds Spencer Creek Riparian Thinning- thin 80 acres of iuniverlmixed conifer T38S, R6E, Secs. 21 and 28 Clover Creek DDRB - 108 acres mechanical treatment. T. 38S, R6E, Sec. 27.34 Off Spencer Hookup Road I Document is tiered to the Northwest Area Noxious 1 Noxious Weed I Klamath River canyon/ ACEC None I Wyd Control Program Treatments occur May - EIS avvroved December I October on a vearlv I Lou mitaker Analysis in Progress. 1985: supplemented in March 1987. Analysis completion expected Spring 2004. - . basis. Mule deer winter range. Rob Roninger None I EA completed Riparian Reserves EA completed. I Ongoing - Possible in Key Watershed completion in 2004 I Mike Turaski cx completed. h j e c t in progress. Riparian, critical sucker habitat 2- 3 year implementation began Spring 2003. Ongoing Planning/ Analysis/ Implementation- Lands Treatments occur on a yearly basis. Hapa DNA completed. Bald Eagles, Survey and Manage species Map l # 8 Greg Reddell Map 1 # 17 Implementation initiated 2003 - Ongoing DNA completed in Spring 2001. Mike Turaski Map I -# 20 Map 1 -# 9 On hold for RE0 approval of LSRA - ~- - Dehlinger Trust - Residential Road ROW and easement. Bmner Land Exchange Steve Haper Bly Dump Sale ( EA No. OR- 014- 97- 01) - Purpose of # l8 this project is to sell Bly Transfer Station to Klamath Co. I of Bly'OrrgOn. Map I I None Known I Analysis in progress I Winter2004 Linda Younger T40S, RIOE, Sec. 9 South Bryant Mountain Al B ~ n eLra nd Sale Nancy Charley Trust Reciprocal Easement and ROW Klamath Falls Resource Area, Winter 2003 Planning Update - Page 5 None Unknown T41S, R13E. Sec. 14 T38S, RSE, Sec 12- 13 Reciprocal Easement Pending On hold Unknown Borders Riparian Reserve Winter 2004 Spring 2005 EA completedl Decision record pending CX completed, easement pending Linda Younger Linda Younger Spring 2004 Fall 2004 Linda Younger Linda Younger MAP PROJECT TITLE & DESCRIPTION REF. SPECIAL AREAS IC OMPLI AFFECTED Ongoing Planning/ Analysis/ Imp LOCATION ETION DATE I COMA dementation - rimber Sales I - - - Non - Non Roaming Salvage EA - The purpose is to provide NEPA coverage for timely salvage of timber mortality over the entire Resource Area. Entire Resource Area Unknown Preparing scoping letters. Spring 2004 I MI* cBechdo1t FY 04 - Baldy Salvage Timber Sale - Sale is designed to harvest windthrown trees as a result of 2003- 4 windstorms and scattered insect and disease related mortality. Anticipated volume is I . O- 1 SMMBF on 300- 500 acres. FY 04 - Matchbox Title I1 Service Contradl'imber Sale - The project consists of a Forest Health Density ManagementIUnderstory Thinning of overstocked mixed conifer stands. The sale is being designed under the Secure Rural Schools and Community Self- Determination Act of 200 - Public Law 106- 393. A service contract will be used to thin, yard, and deck trees from an overstocked mixed conifer stand. A timber sale contract will be used sell the decked material. Approximately 300 acres are scheduled for treatment resulting in about 600 MBF. Primarily in the Surveyor Mtn and Burton Butte Areas. May also include some eastside areas. Timber Sale is scheduled to be sold in Mike Bechdolt May or June of 2004 Presently marking some of the scatted salvage Matrix Contract is scheduled to be awarded in June or Mike Bechdolt July of 2004 Chase Mountain Area T. 40S., R. 7E., Sec. 9 Presently Preparing the Matrix Timber Sale Contract Proposed sale date: Summer 2005 Mike Bechdolt Riparian Reserves T38S., ME., Sec. l3,15,23, 25 and 26 Reserves! Matrix Buck Again Timber Sale - An estimated 700 acres is designed for treatment in the Spencer Creek watershed near Buck Lake. Approx. 4 MMBF to be harvested. Sale preparation. Chew Timber Sale- Approximately 1,000 acres density management understory reduction adjacent to and south of T40S. R6E, Secs. 1, 1 1,14 T40S, R7E. Secs. 3 and 5 Proposed sale date Mike Bechdolt Hwy 66 west of la math Falls. ~ aleanal~ zuendd er the Sale preparation. Spring 2004 or 2005. Topsy/ Pokegama/ Hamaker EA (# OR- 0 14- 98- 01 ). Estimated volume of 2.5 m b f . None Oneoine Plannine/ Analvsis/ Implementation - Roads and Facilities Map 1 # 77 Map # 73 Klamath Falls Resource Area, Winter 2003 Planning Update - Page 6 Sediment Traps - 30 sediment traps on BLM, USFS, and private land Map I # 6 Gcrber Road Sediment Reduction - road resurfacing and drainage improvement to reduce sediment delivery to streams in the Gerber Watershed Spencer Creek Watershed and Gerber Block Gerber Washrack- Installation of facility at Gerber Guard Station for washing equipment to control the suread of noxious weeds and overhead filling of tankers. 5 stream crossings None Gerber Guard Station Critical sucker habitat DNA completed. Sediment traps installed. Noxious weed prevention EA completed. Implementation initiated I Fall 2004 Monitoring in progress. Mike Turaski CX completed. Mike Turaski Pending funding. Bob Crumrine/ Brian McCarty - I - 1 - Map 1 # 6 Ongoing Planning/ Analysis/ Implementation - Roads and Facilities ( continued) Gerber Area Recreation Improvements - ( RMP ROD EIS 6- 2- 95, pp. 49- 50) - Project falls under corrective maintenance, improvement or replacement in the Klamath Falls RMP. Existing maintenance, improvement or replacement include: rocking and chip- sealinglpaving road system and campsites, picnic tables, barrier posts, camp host RV holding tank, hydrants, Barnes Valley Boat Ramp access road. Scott Smter Gerber Reservoir Recreation Site Gerber Area Primitive Camp and Day Use Sites Recreation Improvements. The objectives of these improvements are to update or improve existing facilities to continue to provide an enhanced recreational experience and satisfy visitor needs. T& ESpecies ( suckers and bald eagles) Scott Senter Stan H Spring, Potholes, Miller Creek, Frog Camp, Pitchlog Creek, Wildhorse, Basin, Rock Creek and Willow Valley Reservoir Map l # 6 Projects in compliance GththeKFIURMP. Determination of NEPA Adequacy completed and approved on 10128199. Wood River Wetlands Project - Remaining projects: Finish installation of fish screen on 7- mile Canal diversion structure and floating boardwalk, interpretive signs, and trail system. Surface rock dike roads from bridge to 7- mile Canal and add group interpretive site. Juniper Chip Road - Using juniper debris for biomass or by- product in Oshea ( mZ 95/ 71), and Norcross Springs. FY 2004 - Miller Creek- Potholes trail to be constructed T& E Species ( suckers) wood River Property I I Upper Klamath Basin and Wood River Wetland I A Determination of NEPA Adequacy ( DNA) completed 9/ 25/ 2000. ( Project contingent on funding) Map 1 # 25 - Map 2 # 70 FY 2004- sidewalks and pinic tables to be installed at Willow Valley Res. Wedge Watkins Joe Foran 25 miles north of Klamath Falls, Oregon T 39 8 40s. R13,14,14XE I None Known I I Stewardship contract EAcompIeted being developed. Ongoing Projects - Prescribed Burning and Fuels Treatment Wetlands Map 2 # 2 Resource Management Plan EIS; decision signed June 16,1995. Joe Foran Pending funding Short Lake Broadcast Bum - Prescribe bum approx. 280 acres outside FTZ to reduce fuel loading and risk of wildfire. T38S. R1 I E, Sec 20 & 29 - - - - - - -- - - - - - Miller Creek Mechanical Treatment - Proposal to use mechanical piling instead of prescribed buming of a~ oroximatelv I00 acres. Map 2 # 37 - T39S. R13E. Sec. 14 & 23 Analysis Completed ACEC 1 FONSl and Decision Record on 3- 24- 99. Joe Foran None Known Project delayed. EA completed Fuels Maintenance Treatments # t ( KCER - 00- 03) Treat approximately 1,200 acres to remove fire- prone brush, excessive levels of hazardous fuels ( less than 6" in diameter), and small conifers that are ladder fuels and threats to over stow trees bv crown fire.. Map 2 # I 1 Spring 2004 Klamath Falls Resource Area, east of Hwy 97. See Prescribed Fire Map for locations. None Known Dale Brush Map 2 # 62 Analysis completed. Multiple year implementation - ongoing. Mechanical Slash Treatment Project - Mechanical treatments ( shearing, chipping, or grinding) to reduce fuels and control vegetation on approx. 12,000 acres. Joe Foran Multiple Locations Resource Area Wide None / Second DNA completed. Klamath Falls Resource Area, Winter 2003 Planning Update - Page 7 Projects tasked out over a three year period - ongoing. PROJECT K. 1 TITLE & DESCRIPTIO SPECIAL AREAS STATUS OF 4 CONTACT AFFECTED ANALYSIS - Map 2 -# 39 Map 2 # 40 - Map 2 -# 42 Map 2 # 38 Map 2 # 63 Map 2 # 64 - Map 2 # 65 & # I9 Map 2 # 45 - Map 2 # 49 - Stukel98- 1 Mechanical Treatment - Mechanical piling T40S, RIOE, Sec. 10,11,14, instead of pmcribed burning of approximately 500 acres. 23,24 Stukel98- 2 Prescribed Burn - Prescribe bum approx. 3,000 acres to: Reintroduce fire to restore plant communities, while reducing the potential for stand-replacement wildfires and overall fire management costs. T40S, RIOE, Sec. 12,13,24 T40S, RllE, Sec. 7& 18 HamakerIChase Fuels Treatment - Reduce Fuels on T40S, R8E 4000 acres south of Hwy 66 I Stiles Spring Prescribed Burn - Project purpose to bum approximately 1,000 acres to: Reinduce fire to restore sustainable function and structure to plant communities, while reducing the potential for stand- replacement wildfires, and reducing overall fire management costs. Stukel98- 7 & 9 Prescribed Burns - Prescribe bum approximately 525 acres to: reintroduce fire to restore plant communities, reduce overall fire management costs and the potential for stand- replacing wildfires. Statelinel Holbmk Prescribed Bums - Presmie bum approximately 4.000 acres to reduce fuel loading and risk of catastrophic wildfire. T37S, RIOE, Sec. 3- 5,9- 11, 14- 15 T40S, RllE, Sec5 & 6 T. 40S, R15 E., T. 41S, RISE. -- Big Adobe Prescribed Burn - Prescribe bum approximately 6,700 acres to reduce fuel loading and risk of catastrophic wildfire ( includes Wild Midway Rx Bum) Range- Juniper Treatment - Hazardous fuel reduction, T40S. R12E. Sec. 1 1 using mechanical and prescribed fire methods. T41 S, RISE Upper Swan Prescribed Burn - Project purpose: bum approximately 98 acres to restore sustainable function and structure to plant communities, reduce potential for stand-replacement wildfires and overall fire management costs. g and Fuels Treatment ( continued) None Known Project0 t1ie 4r- s9 4to- 0E9A. # OR- Project ongoing Joe Fmn T37S, RIOE, Sec. 24 & 25 T37S, RI 1.5E, Sec. 31 Bald Eagle ( Analysis Completed- I 200 acres treated in FY I None Analysis Completed Project tiers to EA # OR- 014- 94- 09. EA completed Wildlife Habitat Riparian Initiated Winter 2001 Fall 2004 Joe Foran Project delayed until the Spring 2004 Bald None Bald Eagle I Planned projects tier to the Promammatic Fire I Joe Foran Joe Foran Project initiated, 2- 3 year implementation FONSI - 12- 1 9- 99. 2000; Remainder Decision Record on 01 - 25- 2000 ,, Foran Joe Foran Analysis Completed Project tiers to EA # OR- 014- 94- 09) approved on 4- 29- 94. Initiated Winter 2001 Klamath Falls Resource Area, Winter 2003 Planning Update - Page 8 Wildlife forage/ habitat improvement 130 acres completed Remainder Spring 2004 Accomplished 1500 acres. Remainder Fall 2004. Steve Pehick- Underwood Joe Foran DNA completed ongoing 2- 3 year implementation Joe Foran .. " "" . 7 < .,.. - . . 7 - " b - . " < * - - ' 7 , 4 . , v ,-' w., ,. ' q"* -*?, . x*-.. s,... >,% VW? P ,*.- 7i*,- .*. x., < 8 SCHEDULE OF PROPOSED PROJECTS BUREAU OF LAND MANAGEMENT KLAMATH FALLS RESOURCE AREA * 2795 ANDERSON AVENUE, BLDG. # 25 KLAMATH FALLS, OR 97603 PHONE NUMBER: ( 541) 883- 69 MAP PROJECT TITLE & DESCRIPTION LOCATION I SPECIAL AREAS STATUS OF ANALYSIS COMPLETION CONTACT REF. # AFFECTED DATE Rangeland Health Standards Assessments - in progress I These assessments compare the monitoring information collected against the five Standards for Rangeland Health and propose management changes if current grazing use is not meeting the Standards, or not making significant improvement towards meeting them. Changes are implemented through the grazing decision or agreement process. z3I Re16 Allotment ( M893) I South Langell Valley I None Known I Assessment in progress I Summer 2004 I Dana Eckard M$\ 3 I KIamatL Forest Estates Allotment ( M862) 1 North of Bonanza -~ Yainax Allotment ( M861) I None Known I Assessment in progress I ~ ~ - 2 0 0 4 I Bill Lindsey North of Bonanza Map # 55 None Known ? G3 Haskins Allotment (# 0826) y&' Assessment in progress Masten Allotment ( M842) Map # 68 North of Bonanza Kellian Allotment (# 0834) Hungry Hollow Allotment (# 0830) Klamath Falls Resource Area, Winter 2003 Planning Update - Page 9 SUM 2004 North of Bonanza Adams Allotment (# 0800) Rangeland Health Standards Assessments - completed* Bill Lindsey None Known North of Bonanza North of Bonanza None Known East of Bonanza Bill Lindsey Assessment in progress None Known None Known * A total of 37 Rangeland Health Standards Assessments have been completed to date, 1 has been completed so far in FY 2004. Assessment in progress None Known None Known Assessment completed Summer 2004 Assessment in progress Assessment in progress Map North of Bonanza December 2003 # 48 Dana Eckard Summer 2004 Assessment in progress McCartie Allotment (# 0860) Dana Eckard Summer 2004 Summer 2004 Dana Eckard Summer 2004 Dana Eckard Dana Eckard Presentations/ Environmental Education Programs/ Tours ( Fiscal Year to Date) Fun With Fungi I 1 1/ 2/ 03 I Seven Mile Area Adults 25 I What Was Presented Overview of past and current outreach events; permit sales Wood River Wetland Field Trip Operation Indian Rocks ARPA Investigation 1 1 1/ 3/ 03 ( Central Washington University 1 Faculty and Students I 51 I Date 1 Group / Age # of People 1 01 1 5/ 03 10/ 28/ 03 Where Cultural Resource Management and the NEPA Process Archaeological Investigations in the Great Basin I Wildlife Management 1 12/ 16/ 03 1 OIT - " Expanding Horizons" I 8* Grade Students I 120 1 Ross Ragland Theater Wood River Wetland Coloring Books 1 1/ 3/ 03 1 1/ 4/ 03 Klarnath Falls Resource Area, Winter 2003 Planning Update - Page 10 Answer People/ Adults Oregon Institute of Technology Students I 1 1 11 9/ 03 Shasta Elementary School -- - S - 290 Fire Behavior 25 - 30 Central Washington University Central Washington University Elementary Students 30 12/ 20/ 03 Graduate Student Seminar Graduate Student Seminar 24 35 Klamth Community College Adults 8 EventIActivlty Date Location Contact( s) F 01 rarnclpanrs ( EmployeeslPublic*) IBald Eagle Conference I Februaryl3- IS I Oregon Institute of Technology I Steve Haynerl Kelly Hollums I l~ arthD ay I April I Jefferson Square Mall I Greg Reddell I Klamath Watershed conference February 24 - 26 Wilderness & Horse Packing Clinic** International Migratory Bird Day IMBD Pre- event Classes -- - IMBD Educator Workshop Oregon Institute of Technology May ( IMBD) April 24 IMBD Event National Free Fishing Day RAP Camp Klamath County Fair Klamath Falls Resource Area, Winter 2003 Planning Update - Page 11 Wedge WatkinslKelly Hollums April 16 - pp - - Sixth Grade Forestry Tour National Public Lands Day Oregon Archeology Celebration Klarnath County Fairgrounds Klamath Community College May 8 June June August Tonya PinckneyIScott Senter Steve Hayner, et al OSU- Klamath Co. Extension * Numbers of public participants for large events are estimated. ** BOLD WRITING indicates that project is funded with District Outreach dollars. September September September Veteran's Park To Be Announced Camp Esther Applegate Klamath County Fairgrounds Steve Hayner, et al Steve Hayner Scott Snedaker To Be Announced PinckneylSenter Clover Creek Educational Area To Be Announced To Be Announced ~ p Bill Johnson To Be Announced Michelle Durant Glama th Falls Resource Area Miscellaneo~ wP roject Loca ticms R6E RBE R7E RBE RBE RlOE RIIE R12E R13E R14E R14.6E R16E Klamath Falls Resource Area, Winter 2003 Planning Update - Page 12 N LEGEND R5E R6E R7E R8E RQE RIOE R l l E R12E R13E R14E R14.5E R15E Klarnath Falls Resource Area, Fall 2003 Planning Update - Page 13 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGE~ ENT Klarnath Falls Resource Area Office 2395 Parderson Avenue, Building a 5 Kfamth MIS. Oregan 97603 OF. FIGIAL, BUSI~ ESS PENALTY FOR PRIVATE USE, $ 300 Marita Kunkel Library Director Oregon Institute of Techolagy 3201 Cempus Dr Klamath Falls, OR 97601
-
1890. [Image] An assessment of ecosystem components in the interior Columbia Basin and portions of the Klamath and Great Basins [volume 2]
Abstract Quigley, Thomas M.; Arbelbide, Sylvia J., tech. eds. 1997. An assessment of ecosystem components in the interior Columbia basin and portions of the Klamath and Great Basins: volume 2. Gen. Tech. ...Citation Citation
- Title:
- An assessment of ecosystem components in the interior Columbia Basin and portions of the Klamath and Great Basins [volume 2]
- Author:
- Quigley, Thomas Milton; Arbelbide, S. J. (Sylvia J.)
- Year:
- 1997, 2008, 2005
Abstract Quigley, Thomas M.; Arbelbide, Sylvia J., tech. eds. 1997. An assessment of ecosystem components in the interior Columbia basin and portions of the Klamath and Great Basins: volume 2. Gen. Tech. Rep. PNW-GTR-405. Portland, OR: U.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station. 4 vol. (Quigley, Thomas M., tech. ed.; The Interior Columbia Basin Ecosystem Management Project: Scientific Assessment). The Assessment of Ecosystem Components in the Interior Columbia Basin and Portions of the Klamath and Great Basins provides detailed information about current conditions and trends for the biophysical and social systems within the Basin. This information can be used by land managers to develop broad land management goals and priorities and provides the context for decisions specific to smaller geographic areas. The Assessment area covers about 8 percent of the U.S. land area, 24 percent of the Nations National Forest System lands, 10 percent of the Nations BLM-administered lands, and contains about 1.2 percent of the Nations population. This results in a population density that is less than one-sixth of the U.S. average. The area has experienced recent, rapid population growth and generally has a robust, diverse economy. As compared to historic conditions, the terrestrial, aquatic, forest, and rangeland systems have undergone dramatic changes. Forested landscapes are more susceptible to fire, insect, and disease than under historic conditions. Rangelands are highly susceptible to noxious weed invasion. The disturbance regimes that operate on forest and rangeland have changed substantially, with lethal fires dominating many areas where non-lethal fires were the norm historically. Terrestrial habitats that have experienced the greatest decline include the native grassland, native shrubland, and old forest structures. There are areas within the Assessment area that have higher diversity than others. Aquatic systems are now more fragmented and isolated than historically and the introduction of non-native fish species has complicated current status of native fishes. Core habitat and population centers do remain as building blocks for restoration. Social and economic conditions within the Assessment area vary considerably, depending to a great extent on population, diversity of employment opportunities, and changing demographics. Those counties with the higher population densities and greater diversity of employment opportunities are generally more resilient to economic downturns. This Assessment provides a rich information base, including over 170 mapped themes with associated models and databases, from which future decisions can benefit. Keywords: Columbia basin, biophysical systems, social systems, ecosystem.