Search
Search Results
-
1871. [Image] The Klamath Project
-
DOCS I 49.107: 89 ( 1.1) 89( 1.1) EVALUATION OF SITE SPECIFIC RESTORATION PROJECTS FOR THE ENTIRE KLAMATH RIVER BASIN. 1989 Klamath Field Review Comments The following comments are based primarily upon ...
Citation Citation
- Title:
- Evaluation of site specific restoration projects for the entire Klamath River basin
- Year:
- 1989, 2005
DOCS I 49.107: 89 ( 1.1) 89( 1.1) EVALUATION OF SITE SPECIFIC RESTORATION PROJECTS FOR THE ENTIRE KLAMATH RIVER BASIN. 1989 Klamath Field Review Comments The following comments are based primarily upon field observations made by Scott Downie and Andy Kier during the summer and autumn of 1989, Some of the review was made accompanied by personnel responsible for the projects and their comments are incorporated as well. In many streams individual project sites are linked and/ or similar in nature. This review generalizes these in its comments and ratings, but notes exceptions where required. Grades A- F were assigned, but like all grades lacking set criteria and good base- line information, they are somewhat subjective. Evaluations were based upon the observed or perceived physical response mf. de by the stream to the project, whether or not the project satisfied the objectives of the proposal, and whether or not the project appeared to have durable structure and function without maintenance or modification. Biological evaluation was impossible except to note observed fish at the time of the review. Cost effectiveness is again somewhat subjective without more front- end information, but based upon personal experience an attempt to measure product for cost entered into grade assignment. GENERAL: 1000, 1001, 1003: The racks on Bogus Crk, Scott R. & Shasta R were all operational Summer 1989. 1002: The Salmon R. weir operations were modified during our review period in response to public input: 1. The trap and weir will be staffed 24 hrs/ day. 2. Weir and trap operations will cease at 73 F. 3. Fishing will not be allowed below weir. 4. An alternate site will be developed ASAP. LOWER KLAMATH SUBBASIN: Ah Pah Creek ( 11006, 07, 08, 09, 10, 18-$ 123,928): A CCC, DFG, & Simpson Timber Co. project to provide improved access for adults into upper Ah Pah Crk., and to control sedimentation from failing banks in the treatment area. In Oct. 1989, the Hewitt Ramp structures were successfully passing coho and steelhead adults and juveni'es through a previous adult barrier section. Large wood and boulder cover elements had been placed in the associated pools. Treated banks were armored with rock filled gabions and planted with alder, willow and conifers. No evidence of sediment production to the stream from these treated slopes was observed. The workmanship and construction are sturdyand of high quality. Grade A. { Since we visited Ah Pah Crk. the day after the RNP bypass failure, the stream was loaded with suspended sediments) 1990 - Review Comments- Bluff Creek ( 11022, 23, 24, 31, 32-$ 212,000): Access provided through lower Bluff Crk's former barrier section is still passing adults and juveniles following the Feb. 1986 flood event. The boulder weirs and boulder clusters near the yearling rearing facility are providing limited spawning improvement, but they do contain pockets of gravel utilized by spawners. Both the weirs and clusters have provided some good quality summer rearing habitats, and also refuge areas during winter flows. Two cluster groups are now buried under large streambank failures. These events could have been exacerbated by the placement of the boulders too close to the now failed right bank. No large wood or brush cover elements were utilized in the structures, although some were available. Personnel explained that the extreme velocities and power at high discharges prevented incorporating these organic components into their instream structures on Bluff Crk, Grade C. Camp Creek ( 11029, 30-$ 125,000): Six boulder weirs were constructed by USFS to trap spawning gravels. Two of the six weirs are now scattered boulder clusters, having been rearranged by the stream. The surviving weirs have provided gravels and are being used by fish. The boulder groups, both designed and incidental, are providing some good quality rearing habitats and some pockets of gravel used for spawning salmonids. 3rade C. Cappell Creek ( 11027-$ 125,000): BIA artificial propagation project. Project has operated for one year. It has released 17,035 CWT Chinook. Typical of the lower river hatchery programs, securing desired numbers of late running chinook broodstocks is very difficult. A lot of money in terms of fry produced, but the facility start- up costs are now over and the annual cost will be much less than the initial investment. Grade C. Hunter Creek ( 11001, 11002, 11013-$ 19,328): A CCC, DFG, and Simpson project to improve Hunter Creek on a basin scale. CCC now have a thorough instream assessment and instream structure plan prepared by Clearwater Biostudies, inc. under contract to them. Instream structure work is now underway by CCC crews. The construction is of excellent quality and design. All upper stream barrier work is now completed. The dry lower reaches of the stream pose a dewatered, complete barrier to all adults running before early November in most years ( T. Payne, 1989). Some concern over future land management's effect on the stream in the event of a major flood occurrence. Grade B. McGarvey Creek ( 11025, 11014, 11003-$ 24,264): Status of the hatch box project is not known. The barrier work is all done and passing fish. Grade C. - Review Comments- Pecwan Creek ( 11021, 11036, 11028-$ 50,000): A total of 21,626 yearling chinook were released from 1982- 84 from this facility* They were from Iron Gate stocks and deemed not suitable for the restocking goals of the project area. Since 1985, the facility's production is not well documented, but 27,000 for the period 1985- 88 is estimated. None of the releases from this site have been CWT. The Pecwan site has been used as a broodstock source for Cappell Creek as well. Grade D. Red Cap Creek ( 11033, 34, 35-$ 70,000): USFS project has produced some impressive results. Failing banks have been armored and vegetated. A series of over thirty boulder weirs and clusters have provided some high quality spawning and rearing habitats. Large wood cover elements have been used somewhat in the project. The project reach is in a stream section of former generally poor habitats and low utilization by salmonids; they were abundant during our visits. There is a yearling pond adjacent to the treatment section. Grade A. Richardson Creek ( 11026-$ 25,200): This project removed a barrier to salmonids and is functional. Seemed expensive. Grade C. Salt Creek ( 11000, 11012-$ 18,944): CCC successfully stabilized failing banks. All barrier work is completed and functional. One of the few upslope erosion control projects in the review has controlled the sediment output from the roadway. There is a lot of product here for the money. Grade A. Surpur Creek ( 11005-$ 3,456): CCC removed barriers at a bargain price. Still functional. Grade A. Tarup Creek ( 11004, 11011, 11015, 16, 17-$ 77,024): CCC has a plan for the creek and instream treatments done under contract by Inter- Fluv Inc. The work outlined in the plan is now completed, and is of very high quality and design for the most part. The work involved barrier modification, instream structures, revegetation upslope as well in the riparian zone, and some upslope erosion control ( one site upslope was quite major, in fact). Tarup, regardless of all these improvements, has a low flow access problem in its delta. Grade B. Pine Creek ( 10019, 20-$- 0-): Not reviewed. Various streams ( 11019- 20-$ 550,000): This is the CCC operation fund for the Lower Klamath program. This ongoing general fund was not deemed suitable for field review or rating. However, our general observation of the CCC/ DFG Lower Klamath program has certainly produced a positive impression of their work and approach. - Review Comments- MIDDLE KLAMATH SUBBASIN: Beaver Creek ( 6000- 05, 6035, 6053, 6065, 6066-$ 124,400): The boulder cluster groups and weirs constructed on Beaver Creek are not well utilized at this time. Silts and sediments nave impacted the quality of the gravel associated with the structures to the extent that some cementing has occurred. Therefore, it is believed that utilization by spawners has also been effected. The structures designed for the provision of rearing habitats have done better, and some of course do both, some neither. Grade C, The rearing facility ( 6035) was closed in 1985, but there is now talk of re- opening it. 1980- 84 releases averaged 29,423 yearling chinook of Iron Gate origin. Grade C. The gravel seeding occurred in 1985 ( 6052) and no evaluation was considered possible in 1989, nor was any proffered by staff. The two screens ( 6065- 66) are functional, but require regular upkeep and periodic thorough maintenance. Grade B. Bluff Creek ( 6036-$- 0-): This is one of the Klamath system's highest production cooperative rearing facilities. It has averaged 66,462 chinook yearlings for the past three years. These fish are of Iron Gate origin. Although adult runs are up in Bluff Creek, there is little baseline data, and until the current brood no CWT's were done on the ponded fish. Grade B. Bogus Creek ( 6046- 47, 6053- 54, 6061-$ 94,750): Bogus Creek is heavily utilized by naturally spawning chinook of Iron Gate Hatchery origin as well as by stocks of its own. The projects designed to provide more and/ or better gravels for these fish have met with apparent success, since in almost all cases the projects are used by the spawners, but so is everything else. What that means in real incremental gains that can be credited to particular habitat treatments is therefore difficult to assess. CWT and DSM evaluation programs are ongoing. Grade C. Camp Creek ( 6037-$- 0-): This rearing facility switched from Iron Gate chinook stocks to natal stocks in 1987. Yearling releases dropped from an average of 27,533 to 14,573 after the change. This can be attributed to the difficulty in trapping adults in an open, high discharge system. Still, the fact that they are now utilizing later running stocks that are adapted to Camp Creek's flow regime and conditions counts for a great deal. The natal brood have been marked with alternating maxillary clips ( right one year, left the next) prior to release and some have been recovered as adults. Grade B+. China Creek ( 6008- 09-$ 9,300): Not reviewed. Report is that the access is good throughout the stream now. No report on the status of the structures. - Review Comments- Clear Creek ( 6010, 6068- 69-$ 66,400): Fish and Game's barrier removal is providing access successfully. Report is that access is good throughout Clear Creek at this time. Grade B. Coon Creek ( 6056-$ 30,000): This ladder passes steelhead, but DFG is not certain about coho. It also requires some light upkeep. Grade B. Cottonwood Creek ( 6049-$ 22,966): Gravel placed on these weirs needs to be re- seeded periodically at the cost of $ 2,000 each time. Grade D. ( 6057-$ 6,000): Not reviewed. ( 6055-$ 5,000): Ladder is on line and working well. Grade B. ( 6058- 60-$ 29,500): These screens are all on line and operational, but require light periodic maintenance which is conducted by the Yreka Screen Shop on a rotating basis. Grade B. ( 6070-$ 1,200): The potholes blasted to trap gravel have trapped sand instead, so the goal of creating spawning habitat was not met. However, fry usage and survival seem to be good in the resultant pools. Not a high cost project. Grade C. ( Total Cottonwood Creek budget: $ 64,666) Di1lon Creek ( 6071-$ 5,000): This functional project opened five miles of good habitat now utilized by steelhead and Chinook. Grade A. Doolittle Creek ( 6011-$ 2,300) : The treated log jam has not reformed and access is still good for steelhead. Grade C. Elk Creek ( 6012- 14-$ 41,000): The boulder weirs and clusters are now all installed and need flows for evaluation of performance. ( 6034, 6045-$ 10,000) : The washout pond has averaged 31,205 released Iron Gate chinook yearlings since 1984. Grade B. ( Total Elk Creek budget: $ 51,000) Grider Creek ( 6015- 16, 6038-$ 18,500): The falls are now passing fish successfully. Grade A. The boulder weirs have been successful in trapping spawning gravel and are being used by chinook. Grade A. The ponds have grown an average of 34,426 Iron Gate chinook yearlings since 1987. Grade B. Horse Creek ( 6062- 64, 6074-$ 35,000): The three screens are installed and operational, but require light maintenance. Yreka Screen Shop provides this on an alternating basis. Grade B. The log jam is no longer an access problem. Grade A. ( Extant diversion dam is a major problem on this creek) Humbug Creek ( 6017- 18-$ 5,300): The boulder weirs are not successful and are physically failing. Grade F. The log weirs have worked well and are providing spawning and rearing habitat. Grade A. In any event, ten miles of good quality habitat are blocked to salmonids by dredge tailings in lower Humbug Creek. - Review Comments- Independence Creek ( 6019-$ 5,000): The stream's mouth is still open and fish access it. Grade B. Indian Creek ( 6006, 6020- 28, 6039- 40, 6067, 6072~$ 200,600): AH modified former barriers are now passing fish. Grade A. The recent instream structures all appear to be performing to design; biological evaluation is underway now. Grade B. The spawning channel is used extensively by steelhead, and to a lesser extent by coho, but not by chinook. It is also a maintenance item ( ie. supplemental gravel). Grade D. The rearing ponds have averaged 74,134 Iron Gate yearlings since 1985. Grade B. Irving Creek ( 6029-$ 9,300): The use of small boulders to construct inadequately sized structures resulted in no net gain from this project. Grade F. Iron Gate Hatchery ( 6033-$-?-): The hatchery is modifying its operations to better cope with problems associated with temperatures, density, and release timing according to the hatchery manager. Grade C. Badger Flat and Tree of Heaven ( 6050- 51-$ 136,000): These spawning channels have both been unsuccessful due to design flaws. They require constant maintenance which is not possible during usage. Gravel seeding is an ongoing project. Grade F. Little Bogus Creek ( 6048-$ 20,000): These seeded weirs were not reviewed, but they are reported to be intensely utilized by spawners. However, some maintenance is also required. Pearch Creek ( 6041-$- 0-): These ponds are operated by the Orleans Rod and Gun Club and have good public involvement and educational value. About 9,000 steelhead of Salmon River origin are reared here. A lot of enthusiasm and local stocks. Grade A. Red Cap Creek ( 6042-$- 0-): This rearing pond has averaged 37,862 Iron Gate chinook yearlings since 1985 and is operated in a system that has also had significant habitat improvement projects recently completed. A CWT program would help evaluate both of these aspects of the Red Cap Creek endeavor. Grade B. Seiad Creek ( 6030- 31, 6073-$ 5,100): The barrier project has been successful. Grade A. The weir projects were not found and therefore not reviewed. Thompson Creek ( 6032, 6043-$ 5,000): The rearing ponds were closed in 1985. The instream structures were not reviewed. West Branch Creek ( 6007-$ 5,500): The weirs are used by steelhead for spawning, according to local observers; they seem functional. Grade C. - Review Comments- Wilson Creek ( 6007-$- 0-): This private rearing facility was not reviewed. According to locals, it is not in use at this time. SALMON RIVER: Black Bear Creek ( 5000-$ 11,000): This USFS project successfully provided access for steelhead into the creek, and it is currently being utilized. Grade A. Kelly Gulch ( 5002- 03-$ 9,500): This project was not reviewed, but USFS staff reported that the barrier was still not passing all fish attempting to access the system. Their evaluation is underway now. Knownothing Creek ( 5004- 06, 5021-$ 153,114): The removal of the diversion dams and other barriers resulted, in doubling the chinook and coho runs into the creek. Grade A. The weirs ( 5006*) were not completed at the time of the review. Delays were incurred because the rock was overshot resulting in boulders too small for the structures. Grade F. Nordheimer Creek ( 5007, 5008-$ 90,000): The log weirs ( 5007) failed. Grade F. The fishway ( 5008) is successful and passing fish. Grade A. Salmon River ( 5023, 5024-$ 8,000): This selective barrier was modified at a very reasonable cost and has improved access for al1 fish. Grade A. East Fork Salmon River ( 5013-$ 60,000): This project was not reviewed; USFS is evaluating now. South Fork Salmon River ( 5009- 12, 5014- 15, 5022, 5001-$ 176,200): ( 5009) This natal stock bioenhancement facility was located at a site with poor water temperature conditions for intense fish culture. Broodstock acquisition was also very difficult. The facility is now closed ( equipment will be relocated in the watershed, if possible). The project released 36,667 natal chinook smolts in the period from 1985 to 1987. Grade D. The boulder group projects were undergoing evaluation during the review period for biological response. The initial physical evaluation was not conclusive because many of the projects had not been subject to higher flows. Grade C. ( 5022) The " rough passage" area currently allows fish to pass without undue struggle. Grade B. ( 5001) The Blind Horse Creek weirs have not all been successful in providing spawning habitat. Many are trapping silt rather than spawning gravel. Rearing habitats are being provided by most of them, however. Grade D. - Review Comments- Specimen Creek ( 5016-$ 500): Steelhead now pass the treated log jam barrier. Another jam has formed above this site and requires monitoring and possible modification. Grade B. St. Claire Creek ( 5017- 20-$ 15,000): Steelhead now pass the modified barrier. The log weirs are holding gravel and in use by spawners. Juvenile cover is good associated with the weirs as well as the cover elements used in the project. The boulder weirs and clusters are also in place and in use. Grade A. SCOTT RIVER: Scott River and tribs. ( 4031- 4334 [ not inclusive]-$ 2, "* 15,810) : These Soil Conservation District projects primarily involved placing rip- rap armor at 304 different sites in the upper Scott system. Not all were reviewed, and although the rock is stable and in place, many were found to lack streamside vegetation that would provide important shade and cover for the stream and aquatic life. Some others were buried in decomposed granite, sand or silt and therefore had little benefit for fish by way of providing complex micro- habitats. The value of these projects would be much greater if some of these items were addressed. Grade C. French Creek ( 4001, 4016- 18-$ 32,100): The sediment check dam initially filled in one storm event. It was excavated but refilled during the next runoff event. A high maintenance approach that treats the symptoms of the watershed's chronic erosion problem. Grade F. The screens are all in place and functional, but are dependent upon periodic light upkeep provided by the Yreka Screen Shop. Grade B. Kelsey Creek ( 4002- 04-$ 147,500): The weirs work well and are used by all species for spawning and rearing. Grade A. The USFS spawning channel has not performed as hoped. Problems have occurred relating to channel liner failure. The average number of pairs using the channel during the period 1985- 88 were: nine chinook, three coho, and twelve steelhead. In 1989 no usage was observed. It is also a very costly installation. Grade D-. Kidder Creek ( 4020- 21-$ 26,000): Both screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Patterson Creek ( 4019-$ 9,000): This screen is in place and functional, but is dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. - Review Comments- Scott River ( 4005- 06, 4012- 15-$ 94,800): Although the gravels were ' cleaned' the sedimentation problem returned the next year, This treatment does not address the problem, but rather the symptoms and would require constant maintenance. Grade F. The boulder groups were not installed after gauging the rapid sedimentation rate. The four screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. East Fork Scott River ( 4010- 11-$ 20,000): These two screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Shakleford Creek ( 4009, 4022- 4030 incl., 4323, 4329-$ 343,720): ( 4009) The bank armor was not surveyed, but is reported to be stabilizing the soft banks. The fishery benefits are not known, ( 4022- 30) These nine screens are in place and functional, but are dependent upon periodic maintenance provided by tne Yreka Screen Shop, Grade B. ( 4323, 4329) The rip- rap bank armor is in place, but needs vegetation and cover elements added to increase fishery values. Grade C. Thomkins Creek ( 4007- 08-$ 6,500): The weirs are installed but are not highly utilized because of the recruited fine sediments now accumulated on them. Grade D. The fishway has provided access and is currently functional. Grade B. SHASTA RIVER: Parks Creek ( 3018-$ 42,000): These four screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Shasta River ( 3000- 04, 3005- 08, 3009- 17-$ 519,000): ( 3000- 04) These weirs have deteriorated over the past few years due to the use of undersized boulders in construction. Only about 10% of the effective structures remain. In 1989 only 32 redds were observed on the weirs. Very expensive ($ 363,000) spawning gravel. Grade D. The four fishways ( 3005- 08-$ 17,000) are all currently passing fish. Grade B. The nine screens ( 3009- 17-$ 139,000) are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. 12 0140402500 UPPER KLAMATH RIVER: Fal1 Creek ( 2000-$- 0-): The Fall Creek hatchery facility is on line and ready to augment Iron Gate's production. The site has very good water quality and can be instrumental in relieving crowding problems at Iron Gate.
-
Abstract Quigley, Thomas M.; Haynes, Richard W.; Graham, Russell T., tech. eds. 1996. Integrated scientific assessment for ecosystem management in the interior Columbia basin and portions of the Klamath ...
Citation Citation
- Title:
- Integrated scientific assessment for ecosystem management in the interior Columbia Basin and portions of the Klamath and Great Basins
- Year:
- 1996, 2005, 2000
Abstract Quigley, Thomas M.; Haynes, Richard W.; Graham, Russell T., tech. eds. 1996. Integrated scientific assessment for ecosystem management in the interior Columbia basin and portions of the Klamath and Great Basins. Gen. Tech. Rep. PNW-GTR-382. Portland, OR: U.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station. 303 p. (Quigley, Thomas M., tech. ed. The Interior Columbia Basin Ecosystem Management Project: Scientific Assessment.) The Integrated Scientific Assessment for Ecosystem Management for the Interior Columbia Basin links landscape, aquatic, terrestrial, social, and economic characterizations to describe biophysical and social systems. Integration was achieved through a framework built around six goals for ecosystem management and three different views of the future. These goals are: maintain evolutionary and ecological processes; manage for multiple ecological domains and evolutionary timeframes; maintain viable populations of native and desired non-native species; encourage social and economic resiliency; manage for places with definable values; and, manage to maintain a variety of ecosystem goods, services, and conditions that society wants. Ratings of relative ecological integrity and socioeconomic resiliency were used to make broad statements about ecosystem conditions in the Basin. Currently in the Basin high integrity and resiliency are found on 16 and 20 percent of the area, respectively. Low integrity and resiliency are found on 60 and 68 percent of the area. Different approaches to management can alter the risks to the assets of people living in the Basin and to the ecosystem itself. Continuation of current management leads to increasing risks while management approaches focusing on reserves or restoration result in trends that mostly stabilize or reduce risks. Even where ecological integrity is projected to improve with the application of active management, population increases and the pressures of expanding demands on resources may cause increasing trends in risk. Keywords: Ecosystem assessment, management and goals; ecological integrity; socio-economic resiliency; risk management
-
Only portions of issues of The Water Report are available in the Klamath Waters Digital Library. See the full report at http://www.thewaterreport.com/.
Citation Citation
- Title:
- The Water Report - The ESA, salmon, and Western water law
- Author:
- Envirotech Publications
- Year:
- 2004, 2008, 2006
Only portions of issues of The Water Report are available in the Klamath Waters Digital Library. See the full report at http://www.thewaterreport.com/.
-
SIGNIFICANT FINDINGS The distribution of SOD2q values (measured sediment oxygen demand values corrected to 20°C [degrees Celsius]) had a median value of 1.6 g/m2/day (grams per square meter per day) in ...
Citation Citation
- Title:
- Sediment oxygen demand in Upper Klamath and Agency Lakes, Oregon, 1999
- Author:
- Wood, Tamara M.
- Year:
- 2001, 2005, 2004
SIGNIFICANT FINDINGS The distribution of SOD2q values (measured sediment oxygen demand values corrected to 20°C [degrees Celsius]) had a median value of 1.6 g/m2/day (grams per square meter per day) in the spring and 1.7 g/m2/day in the late summer. These values were well within the range of values in the literature for sites with similar sediment characteristics: primarily silty with at least a moderate amount of organic content. Over most of the lake there appears to be relatively little variation in SOD 14the interquartile range in values was 0.4 g/m2/day in the spring and 0.7 g/m2/day in the late summer. A significant exception was apparent in Ball Bay, where SOD in the late summer was greater than 10.2 g/m2/day. In the absence of primary production, an SOD of this magnitude could deplete the water column of oxygen in a few days. This measurement provided evidence that localized areas of very high SOD occur episodically in the bays, perhaps associated with large algal mats being trapped by the lake circulation patterns. A statistical test for a spring to late summer difference in the median values of SOD confirmed that SOD in the late summer (median value 1.7 g/m2/day) was significantly higher than in the spring (median value 1.2 g/m2/day). The difference was primarily due to seasonal changes in temperature; when SOD values were corrected to 20°C, there was no seasonal difference in the median values. There was no correlation between SOD20 and the sediment characteristics measured in this study: percent fines, organic carbon, and residue lost on ignition.
-
EXECUTIVE SUMMARY FOR THE BULL TROUT RECOVERY PLAN Current Species Status The bull trout (Salvelinus confluentus) in the coterminous United States was listed as threatened on November 1, 1999 (64 ...
Citation Citation
- Title:
- Bull Trout, Salvelinus Confluentus... Draft Recovery Plan, Chapter 1, Introduction...
- Author:
- U.S. Fish and Wildlife Service
- Year:
- 2003, 2008, 2005
EXECUTIVE SUMMARY FOR THE BULL TROUT RECOVERY PLAN Current Species Status The bull trout (Salvelinus confluentus) in the coterminous United States was listed as threatened on November 1, 1999 (64 FR 58910). Earlier rulemakings had listed distinct population segments of bull trout as threatened in the Columbia River, Klamath River, and Jarbidge River basins (63 FR 31647, 63 FR 42757, 64 FR 17110). Bull trout distribution, abundance, and habitat quality have declined rangewide. Several local extirpations have been documented, beginning in the 1950fs. Bull trout continue to occur the Klamath River, Columbia River, Jarbidge River, St. Mary-Belly River, and Coastal-Puget Sound, in the states of Idaho, Montana, Nevada, Oregon, and Washington. Habitat Requirements and Limiting Factors Bull trout have more specific habitat requirements than most other salmonids. Habitat components that influence bull trout distribution and abundance include water temperature, cover, channel form and stability, substrate for spawning and rearing, and migratory corridors. Bull trout are found in colder streams and require colder water than most other salmonids for incubation, juvenile rearing, and spawning. Spawning and rearing areas are often associated with cold-water springs, groundwater infiltration, and/or the coldest streams in a watershed. Throughout their lives, bull trout require complex forms of cover, including large woody debris, undercut banks, boulders, and pools. Alterations in channel form and reductions in channel stability result in habitat degradation and reduced survival of bull trout eggs and juveniles. Channel alterations may reduce the abundance and quality of side channels, stream margins, and pools, which are areas bull trout frequently inhabit. For spawning and early rearing bull trout require loose, clean gravel relatively free of fine sediments. Because bull trout have a relatively long incubation and development period within spawning gravel (greater than 200 days), transport of bedload in unstable channels may kill young bull trout. Bull trout use migratory corridors to move from spawning and rearing habitats to foraging and overwintering habitats and back. Different habitats provide bull trout with diverse resources, and migratory corridors allow local populations to connect, which may increase the potential for gene flow and support or refounding of populations. Declines in bull trout distribution and abundance are the results of combined effects of the following: habitat degradation and fragmentation, the blockage of migratory corridors, poor water quality, angler harvest and poaching, entrainment (process by which aquatic organisms are pulled through a diversion structure or other device) into diversion channels and dams, and introduced iv normative species. Specific land and water management activities that continue to depress bull trout populations and degrade habitat include dams and other diversion structures, forest management practices, livestock grazing, agriculture, road construction and maintenance, mining, and urban and rural development. Some threats to bull trout are the continuing effects of past land management activities. Organization and Development of the Recovery Plan Because bull trout in the coterminous United States are widely distributed within a large area, the recovery plan is organized into multiple chapters. This introductory chapter (Chapter 1) describes our overall recovery strategy for the species, defines recovery, and identifies recovery actions applicable for all listed bull trout in the coterminous United States. Each successive chapter focuses on bull trout in specific geographic areas (recovery units), and describes conditions, defines recovery criteria, and identifies specific recovery actions for the recovery unit. Recovery Objectives The goal of this recovery plan is to describe the actions needed to achieve the recovery of bull trout, that is, to ensure the long-term persistence of self-sustaining, complex interacting groups (or multiple local populations that may have overlapping spawning and rearing areas) of bull trout distributed across the species' native range. Recovery of bull trout will require reducing threats to the long-term persistence of populations, maintaining multiple interconnected populations of bull trout across the diverse habitats of their native range, and preserving the diversity of bull trout life-history strategies (e.g., resident or migratory forms, emigration age, spawning frequency, local habitat adaptations). To recover bull trout, the following four objectives have been identified: ? Maintain current distribution of bull trout within core areas as described in recovery unit chapters and restore distribution where recommended in recovery unit chapters. ? Maintain stable or increasing trend in abundance of bull trout. ? Restore and maintain suitable habitat conditions for all bull trout life history stages and strategies. ? Conserve genetic diversity and provide opportunity for genetic exchange. ? These objectives apply to bull trout in all recovery units. Additional objectives may be necessary to achieve recovery in some recovery units and will be identified in the respective recovery unit chapters. Recovery Criteria Criteria are established to assess whether recovery objectives are being achieved. Criteria specific to each recovery unit are defined in each recovery unit chapter. Individual chapters may contain criteria for assessing the status of bull trout and alleviation of threats that are unique to one or several recovery units. However, every recovery unit chapter will contain criteria that address the following characteristics: ? The distribution of bull trout in identified and potential local populations in all core areas within the recovery unit. ? The estimated abundance of adult bull trout within core areas in the recovery unit, expressed as either a point estimate or a range of individuals. ? The presence of stable or increasing trends for adult bull trout abundance in the recovery unit. ? The restoration of passage at specific barriers identified as inhibiting recovery. We expect recovery of bull trout to be a dynamic process occurring over time. The recovery objectives are based on our current knowledge and may be refined as more information becomes available. Some local populations of bull trout, and possibly core area populations, may be extirpated even though recovery actions are being implemented. If reestablishment of recently extirpated populations is not feasible or practical, recovery criteria for a given recovery unit will be revised on a case-by-case basis. Meeting the four recovery criteria is not intended to be precluded where localized extirpations of bull trout are offset by sufficiently strong improvements in other areas of a recovery unit in meeting the four recovery objectives. The determination of whether a distinct population segment of bull trout is recovered will rely on an analysis of the overall status of the species, threats to the species, and the adequacy of existing regulatory and conservation mechanisms. For example, it may be possible for the Columbia River Distinct Population Segment, which has 22 recovery units, to be recovered prior to all recovery unit criteria being met in all recovery units. Success in accomplishing the recovery VI criteria will be reviewed and considered for the impacts both within a recovery unit and throughout a distinct population segment. Actions Needed Specific tasks falling within the following seven categories will be necessary to initiate recovery within all recovery units: ? Protect, restore, and maintain suitable habitat conditions for bull trout. ? Prevent and reduce negative effects of normative fishes and other normative taxa on bull trout. ? Establish fisheries management goals and objectives compatible with bull trout recovery and implement practices to achieve goals. ? Characterize, conserve, and monitor genetic diversity and gene flow among local populations of bull trout. ? Conduct research and monitoring to implement and evaluate bull trout recovery activities, consistent with an adaptive management approach using feedback from implemented, site-specific recovery tasks. ? Use all available conservation programs and regulations to protect and conserve bull trout and bull trout habitats. ? Assess the implementation of bull trout recovery by recovery units and revise recovery unit plans based on evaluations. Recovery Priority Number The recovery priority number for bull trout in the coterminous United States is 9C, on a scale of 1 to 18, indicating that (1) taxonomically, these populations are distinct population segments of a species, (2) the five populations are subject to a moderate degree of threat(s), (3) the recovery potential is high, and (4) the degree of potential conflict during recovery is high. vrr Estimated Cost of Recovery The total cost estimate of recovery for bull trout in the coterminous United States is presented in the individual recovery unit chapters. The costs presented in each chapter are attributed to bull trout conservation but other species will also benefit. Date of Recovery Expected time to achieve recovery varies among recovery units because of differences in bull trout status, factors affecting bull trout, implementation and effectiveness of recovery tasks, and responses to recovery tasks. Achieving bull trout recovery in all recovery units will be a complex process that will likely take 25 years or more. vin
-
1877. [Image] The Water Report - Tribal water rights update
Only portions of issues of The Water Report are available in the Klamath Waters Digital Library. See the full report at http://www.thewaterreport.com/.Citation -
1878. [Image] Progress report for investigations on Blue Creek, fiscal year 1992, Blue Creek, California
PROGRESS REPORT FOR INVESTIGATIONS ON BLUE CREEK FT 1992 ABSTRACT The U.S. Fish and Wildlife Service, Coastal California Fishery Resource Office in Arcata, California, was funded to investigate chinook ...Citation Citation
- Title:
- Progress report for investigations on Blue Creek, fiscal year 1992, Blue Creek, California
- Author:
- Chan, Jeffrey R. ; Longenbaugh, Matthew H.
- Year:
- 1994, 2005
PROGRESS REPORT FOR INVESTIGATIONS ON BLUE CREEK FT 1992 ABSTRACT The U.S. Fish and Wildlife Service, Coastal California Fishery Resource Office in Arcata, California, was funded to investigate chinook salmon roncorhvnchus tshawvtschav spavming use, juvenile salmonid emigration, and characterize stream habitats in Blue Creek, a tributary to' the Klamath River; California. Investigations began in October 1988, with this reporting period covering October 1991 through September 1992. Adult chinook spawner escapement was addressed by surveys of redds, live fish and carcasses, and by radioteleiretry. Spawner numbers were v?ry low, with only 22 redds observed in fall 1991/winter 1992. The peak count of adult Chinook was 97 fish in early November. Radiotelemetry of migrating spawners (n?8) was used to locate remote spawning areas. Emigrating juvenile Chinook salmon, steelhead trout 10. mvkissV/ coho salmon (fi. kisutchl. and coastal cutthroat trout (g. clarltiV were trapped at river kilometer (rkm) 3.35 with a rotary screw trap (screw trap). The trapping period extended from April to July for a total of 75 trapping nights. Screw trap catches totaled 10,688 chinook, 1,388 steelhead, 99 coho and 10 cutthroat. Peak Chinook emigration occurred during the week of May 17, which is consistent with the past 3 years of monitoring. A juvenile weir was operated 58 nights, and caught a total of 9,166 chinook, 1,196 steelhead, 127 coho and 1 cutthroat. The index of abundance for emigrating chinook during the 1992 juvenile trapping period was 49,590. Sixty-five percent of the juvenile chinook caught during the trapping season were marked with coded wire tags (n-12,687) and released back into Blue Creek at rkm 3.3. Mean water temperatures varied from 6.3 to 18.6 XI and stream flows ranged from 43 to 2178 eft (1.3 to 61.7 m3/?) during the Fiscal Year (FY) 1992 study season.
-
1879. [Image] The Oregon conservation strategy
v, 419 p.; col.ill.; col.maps; "February 2006"; Foreword by Marla Rae, Chair, Oregon Fish and Wildlife CommissionCitation -
1880. [Image] The Water Report - Taking and water rights: constitutional & contractual remedies for government takings
Only portions of issues of The Water Report are available in the Klamath Waters Digital Library. See the full report at http://www.thewaterreport.com/Citation Citation
- Title:
- The Water Report - Taking and water rights: constitutional & contractual remedies for government takings
- Author:
- Envirotech Publications
- Year:
- 2005
Only portions of issues of The Water Report are available in the Klamath Waters Digital Library. See the full report at http://www.thewaterreport.com/