    KP-2578-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, Secondary Drain No. 4. View of Hancock elevating scrapers excavating select material from Secondary Drain No. 4 for use ...
    Citation
  • 3735
    KP-2637-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral, Specifications DC-5483. Front view of Briscoe ditcher excavating prism of R-2 lateral, Sta. 2+00 after lining has been placed solid across the ...
    Citation
  • 4181
    P-12-200-4072NA Klamath Project - Oregon-California. View of backfilling 10 foot cut-off trench at Sta. 50±, looking north. A small John Deere dozer was used to backfill. Note water in trench; September ...
    Citation
  • 4214
    P-12-200-4132NA Klamath Project - Oregon-California. View of Cat 966-B front end loader used to excavate topsoil. Pile, right center, was placed by loader; December 1975; USBR photo by R. J. Hamilto...
    Citation
  • 4231
    P-12-200-4149NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dike Created ...
    Citation
  • 4232
    P-12-200-4150NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. View of drain, ...
    Citation
  • 4233
    P-12-200-4151NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dragline dumping ...
    Citation
  • 4234
    P-12-200-4152NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. View of ½ cu. ...
    Citation
  • 4242
    P-12-200-4160NA Klamath Project - Oregon-California. View of walkway installation at 36" CMP input, Sta. 51+90, left. Laborer using an earth wacker to drive sheet piling. Method seems to work but driver ...
    Citation
  • 4291
    P-12-200-4209NA Klamath Project - Oregon-California. D-8 Dozer ripping material to be used for sub-base material in constructing road on west bank of Drain. Material is very tight. Pit is located ...
    Citation
  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
    Citation
  • 4570
    P12-201-4488 NA Klamath Project, OR-CA. Picture taken of RHC 1/4" steel plate to be used as a bulkhead in CMP "84" hydrostatic test. This one to be inserted in round CMP to concrete transition west of ...
    Citation
  • 4574
    P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4583
    P12-201-4501 NA Klamath Project, OR-CA. Center Canal Flume -- Photo shows crack on floor joint of flume after cleanup. These were dried using propane heaters overnight prior to repairs. These joint openings ...
    Citation
  • 4584
    P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
    Citation
  • 4585
    P12-201-4503 NA Klamath Project, OR-CA. Center Canal Flume -- Curing tent used in repair of joint (photos 4501NA & 4502NA of flume repairs). Also shows location of this joint in relation to flume wooden ...
    Citation
  • 4588
    P12-201-4506 NA Klamath Project, OR-CA. Center Canal Flume -- View of floor and south wall looking down at the joint between the new and old portions of the flume. This joint was repaired using a rubber ...
    Citation
  • 4589
    P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
    Citation
  • 4592
    P12-201-4510 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows north wall of siphon inlet transition after compacted backfill operations were approximately 50% completed. Note plastic covering ...
    Citation
  • 4597
    P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
    Citation
  • 4616
    P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
    Citation
  • 4641
    P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
    Citation
  • 4644
    P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
    Citation
  • 4646
    P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
    Citation
  • 4650
    P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
    Citation
  • 4651
    P12-201-4569NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Shown is standpipe with fill hose attached. Note plastic tube with colored water used for water level indicator. ...
    Citation
  • 4656
    P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
    Citation
  • 4689
    P12-201-4607NA Klamath Project, OR-CA. Klamath Straits Unit East -- View of 6" master water pump set up on KSD. This pump will be used to fill water truck for dust abatement and treating fill material; ...
    Citation
  • 4727
    CN-12-201-180NA Klamath Project - Oregon-California. View showing string line and pointers used to maintain grade; October 11, 1972; Bureau of Reclamation photo by D. W.Stein
    Citation
  • 4732
    CN-12-201-184NA Klamath Project - Oregon-California. Side view of the hopper unit used to feed both pipe and cinders into the trench. The digging chain for the trencher is mounted directly in front of ...
    Citation
  • 4772
    CN-12-201-223NA Klamath Project - Oregon-California. View showing trailer that was used to string pipe ahead of trenching operations. As the truck drove forward, the pipe simply un-reeled itself; November ...
    Citation
  • 4787
    CN-12-201-239NA Klamath Project - Oregon-California. The contractor moved several CMP culverts, which were apparently used by the lessees and stored in the drain, in order to fill the drain. Most drains ...
    Citation
  • 4788
    CN-12-201-240NA Klamath Project - Oregon-California. In filling drains along the north-south road, it was necessary to rip up the surface of the road for material to fill the adjacent open drain. This ...
    Citation
  • 4797
    CN-12-201-249NA Klamath Project - Oregon-California. Close-up view of Laser Beam command post showing adjustment screws. The head is leveled in the same manner that a theodolite is leveled. The crank ...
    Citation
  • 4799
    CN-12-201-251NA Klamath Project - Oregon-California. View of Laser Beam command post controls. Note the two bubbles used for leveling the apparatus. The dial is to set the beam on the desired slope; December ...
    Citation
  • 4814
    CN-12-201-264NA Klamath Project - Oregon-California. View of DW-20 scraper hauling road base material from the USBR pit at the south end of Sump 1-A. Owing to their large capacity (25 c.y.) and resultant ...
    Citation
  • 4846
    CN-12-201-296NA Klamath Project - Oregon-California. Experimental Line in Unit 71. Connection to the steel outlet pipe was made in the same manner as with the unsheathed tubing. Plastic tape is used to ...
    Citation
  • 4897
    CN-12-201-350NA Klamath Project - Oregon-California. View of driller using #CP-55 drill to drill for grouting crest area of spillway; December 1973; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4899
    CN-12-201-353NA Klamath Project - Oregon-California. Grouting spillway area. Hookup shows a 7 foot packer being used; December 1973; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4904
    CN-12-201-358NA Klamath Project - Oregon-California. View of spillway, looking west. 4-Ton wrecking ball being used to break off concrete which has previously been drilled on 8-inch centers. View also ...
    Citation
  • 4906
    CN-12-201-359NA Klamath Project - Oregon-California. View of spillway, looking west. 4-Ton wrecking ball being used to break off concrete which has previously been drilled on 8-inch centers. View also ...
    Citation
  • 4920
    CN-12-201-372NA Klamath Project - Oregon-California. View showing stockpiled sand and aggregate to be used for the manufacture of the concrete of spillway; February 1974; Bureau of Reclamation photo by ...
    Citation
  • 4921
    CN-12-201-374NA Klamath Project - Oregon-California. View of spillway area, looking west. Note ramp that was used to haul broken rock out of channel area; February 1974; Bureau of Reclamation photo by ...
    Citation
  • 4924
    CN-12-201-376NA Klamath Project -Oregon-California. (Thompson Construction Company, Roseburg, Oregon - Sub-Contractor). Completed forms to be used for spillway crest; February 1974; Bureau of Reclamation ...
    Citation
  • 4932
    CN-12-201-385NA Klamath Project - Oregon-California. This tract is a remnant tract containing 31.0 acres suitable for home building sites or special use; December 1973; Bureau of Reclamation photo by J. ...
    Citation
  • 5105
    CN-12-201-565NA Klamath Project - Oregon-California. Local residents say it was built by the CCC’s and used about 1938-1942; June 9, 1975; USBR photo by J. W. Legg
    Citation
  • 5124
    CN-12-201-584NA Klamath Project - Oregon-California. Note tripod used by drill crew in obtaining core samples of foundation material. Samples were obtained as part of Safety of Dams review; September ...
    Citation
  • 5128
    CN-12-201-588NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22-B dragline used to move drilling platform from place to place on downstream face of dam. Dragline was borrowed from Fish and ...
    Citation
  • 5131
    CN-12-201-591NA Klamath Project - Oregon-California. View of bottom of drilling platform. Note the knee braces used to support the platform; October 1969; USBR photo by C. D. Lawrence
    Citation
  • 5132
    CN-12-201-592NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22=B dragline used to lift drilling platform; October 1969; USBR photo by C. D. Lawrence
    Citation
  • 2398
    KP-1895 - Klamath Project. Lower Cost Canal Lining. Picture shows asphalt sheets as will be left for backfill. Overlapping edges are not welded whatsoever. Edges are poured with asphalt compound, RC-0 ...
    Citation
  • 2446
    KP-1929 - Klamath Project. Lower Cost Canal Lining. Wasteway of the N-16 Lateral showing method of laying asphalt. Pipe through center of roll is used to carry roll up side of bank; March 29, 1950; Photo ...
    Citation
  • 2762
    KP-2082-R2 - Klamath Project. Lower Lost River. Iron grates lying near Pumping Plant No. 1. Grates have never been put into use. Pumping Plant No. 1 can be seen in background; September 14, 1950; Photo ...
    Citation
  • 5197
    CN-12-200-43A Klamath Project, Oregon-California. Sprinkler-irrigated potatoes protected from early morning frost on August 7, 1969 by proper use of solid set sprinklers; August 8, 1969; Bureau of Reclamation ...
    Citation
  • 5201
    CN-12-200-47A Klamath Project, Oregon-California. View of bucket of concrete being lowered from walkway on top of dam to drilling platform. The concrete was used to fill the core holes after the cores ...
    Citation
  • 5203
    CN-12-200-50A Klamath Project, Oregon-California. View of blocking beneath the outer end of the drilling platform. Blocking was used in those places where the knee braces would not fit beneath the platform; ...
    Citation
  • 3993
    P-12-200-2981NA Klamath Project - Oregon-California. View showing contractor dozing up surface rock along edge of water to be used as riprap on small dike; May 1974; Bureau of Reclamation photo by D. ...
    Citation
  • 3994
    P-12-200-2982NA Klamath Project - Oregon-California. View shoing [sic] tractor dozing up surface rock along edge of water to be used as riprap on dike; May 1974; Bureau of Reclamation photo by D. W. ...
    Citation
  • 4004
    P-12-200-2992NA Klamath Project - Oregon-California. D-8 Dozer is shown stripping borrow area. Material from this source was used to construct the dike; May 1974; Bureau of Reclamation photo by D. W. ...
    Citation
  • 4015
    P-12-200-3003NA Klamath Project - Oregon-California. View of spillway looking west. The dragline shown was utilized to place the concrete used in the spillway slabs; May 1974; Bureau of Reclamation photo ...
    Citation
  • 4031
    P-12-200-3023NA Klamath Project - Oregon-California. View of equipment used to drill the drainage holes. A Chicago Pneumatic #55 drill was mounted on the side of a 977-K Loader bucket; July 1974; USBR ...
    Citation
  • 4033
    P-12-200-3025NA Klamath Project - Oregon-California. View of contractor's men and equipment drilling a drainage hole in spillway crest area. A #55 Chicago pneumatic drill was used for this work; July ...
    Citation
  • 4046
    P-12-200-3033NA Klamath Project - Oregon-California. View of borrow area before borrowing operations were begun. The borrow was used as rock backfill. Bill Long, Contractor's foreman, is in background; ...
    Citation
  • 4047
    P-12-200-3034NA Klamath Project - Oregon-California. View of borrow area before borrowing operations were begun. The borrow area was used as rock backfill. Bill Long, foreman, is in background; July ...
    Citation
  • 4052
    P-12-200-3039NA Klamath Project - Oregon-California. View of equipment used to place concrete in right protective slab under bridge; July 1974; USBR photo by D. W. Stein
    Citation
  • 4076
    P-12-200-3063NA Klamath Project - Oregon-California. View of cinder borrow pit area. Homemade shaker with 3" screen, screening out oversized material from material to be used as envelope around closed ...
    Citation
  • 4096
    P-12-200-3083NA Klamath Project - Oregon-California. View of small screening plant and loader, at Turkey Hill borrow pit, screening out the 3" oversize from the cinder material to be used as envelope ...
    Citation
  • 4366
    P12-201-4285 NA Klamath Project OR-CA. Water jet pump and power supply mounted on flat bed. Used for water jetting 2 piles, Center Canal flume pier; January 4, 1977; USBR photo by D. J. Kline
    Citation
  • 4371
    P12-201-4290 NA Klamath Project OR-CA. 3/4-yard bucket used with Manitowoc 3500 dragline to lift concrete from transit mixer to pier (excavation site). Center Canal flume in background; January 14, 1977; ...
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4400
    P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4404
    P12-201-4322 NA Klamath Project, OR-CA. Center Canal - Case 580 Construction King used to break 18" frost layer for flume extension floor; January 25, 1977; USBR photo by D. J. Kline
    Citation
  • 4416
    P12-201-4334 NA Klamath Project, OR-CA. Air auger used for drilling holes for bolts and steel pints - 3/4' x 20+"; February 24, 1977; USBR photo by D. J. Kline
    Citation
  • 4419
    P12-201-4337 NA Klamath Project, OR-CA. Pump used for water jetting piling on Plant EE. Suction line steel and outlet 2½" canvas; February 23, 1977; USBR photo by D. J. Kline
    Citation
  • 4426
    P12-201-4344 NA Klamath Project, OR-CA. Pumping Plant EE - View looking northeast at pild (sic) driving trestle after removal of Bent #4. Note side and end rails, which have been reinforced to allow use ...
    Citation
  • 4429
    P12-201-4348 NA Klamath Project, OR-CA. Pumping Plant EE - View looking north along west wall area at concrete placement for the foundation slab of Plant EE. Concrete was hauled to jobsite in 8 c.y. loads ...
    Citation
  • 4434
    P12-201-4353 NA Klamath Project, OR-CA. Finishers using scrreds to float out middle section of Plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4436
    P12-201-4355 NA Klamath Project, OR-CA. Water curing of level portion of Plant EE slab. Inlet section on a 1:4 slope was membrane cured. Note smudge pot heaters used to keep surface temperature above ...
    Citation
  • 4444
    P12-201-4362 NA Klamath Project, OR-CA. Plant FF - Driving 1:2 batter piles at plant FF site. Manitowoc 2900 crane with 90 ft. leads using 50-C hammer, driven by Clayton Steam Generator. View looking ...
    Citation
  • 4445
    P12-201-4363 NA Klamath Project, OR-CA. Plant FF--Manitowoc 1900 Crane with 95 ft. boom and 90 ft. of leads driving batter pile at Plant FF site. Clayton Steam Generator mounted on rear of crane used ...
    Citation
  • 4462
    P12-201-4380 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast: slab completed. Burke-White pigmented curing compound has been applied by spray. Three smudge pot heaters placed in ...
    Citation
  • 4473
    P12-201-4391 NA Klamath Project, OR-CA. View of piling on north side of flume. Also note temporary pier built on piling originally used by contractor for false work in construction of flume; June 16, 1977; ...
    Citation
  • 4480
    P12-201-4398 NA Klamath Project, OR-CA. Pumping Plant FF inlet transition floor placement. E-Con placer used to transfer concrete form transit mixer to pour site; July 28, 1977; USBR photo by D.J. Kli...
    Citation
  • 4482
    P12-201-4400 NA Klamath Project, OR-CA. Ady Canal Siphon--Bulkhead shoring on west side of U.S. 97. Piling used are surplus douglas fir from Plant EE jobsite. Shoring timbers consist of 4"x14" boards ...
    Citation
  • 4503
    P12-201-4422 NA Klamath Project, OR-CA. Ady Canal--1'x1' steel H beam was used between kickers and tunnel cribbing; August 25, 1977; USBR photo by D.J. Kline
    Citation
  • 4507
    P12-201-4426 NA Klamath Project, OR-CA. Ady Canal--To get carrier pipe through the tunnel liner ice (crushed) was spread over sand bedding in tunnel liner plate. A car hood was used as a sled on leading ...
    Citation
  • 4514
    P12-201-4432 NA Klamath Project, OR-CA. Ady Canal--the cribbing was cut with a chainsaw and tunnel shield pushed through the hole using hydraulics. View looking west as the shield exits through the shoring; ...
    Citation
  • 4534
    P12-201-4452 NA Klamath Project, OR-CA. Completing shoring for tunnel exit under SP rr tracks. Shoring used 1.7' to 0.9' Douglas fir timber piling cut at required lengths; August 23, 1977; USBR photo ...
    Citation
  • 4537
    P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
    Citation
  • 4543
    P12-201-4461 NA Klamath Project, OR-CA. PP EE--view looking south. Hanging flap gates on PP EE outlet structure, using Pettibone 30 Crane. Note: Curing compound had been sand blasted prior to flap gate ...
    Citation
  • 4546
    P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
    Citation
  • 4547
    P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
    Citation
  • 4553
    P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
    Citation
  • 63
    ill, maps ; Report title; Bibliography: p. 68-73
    Citation
  • 396
    Recreational use and economic impact of the Salt Caves segment of the Klamath River have been consistently understated. Various citizens and the local press have suggested about 2,000 people use this ...
    Citation
  • 558
    The Klamath Basin Ecosystem Restoration Office (ERO) - Humboldt State University Geographic Information Systems Work Group (HSU-GIS Group) was established to support ERO's mission to develop an ecosystem ...
    Citation
  • 480
    CONTENTS. Page Introduction 2620 5 Climatic conditions 2620 6 Units of measurement 2620 7 Losses by seepage and evaporation 2620 7 Duty of water 26208-10 Evaporation 2620 12 Soil and water analyses ...
    Citation
  • 3248
    Imprint from transmittal sheet; Distributed to depository libraries in microfiche; Shipping list no.: 97-0071-M; One ill. on 1 folded leaf in pocket; Includes bibliographical references
    Citation
  • 3699
    Only portions of issues of The Water Report are available in the Klamath Waters Digital Library. See the full report at http://www.thewaterreport.com/
    Citation
  • 777
    EXECUTIVE SUMMARY Section 7 of the Endangered Species Act (Act) [16 U.S.C. 1531 etseq.] outlines the procedures for Federal interagency cooperation to conserve Federally listed species and designated critical ...
    Citation