Search
You searched for:
Start Over
Water flow
Remove constraint Water flow
Material Types
Image
Remove constraint Material Types: Image
« Previous | 21 - 30 of 441 | Next »
Search Results
-
P12-201-4438 NA Klamath Project, OR-CA. Center Canal Flume--View of flume south wall near pile cap where water exited after piping along fllume wall. This water flowed into the void adjacent to the outlet ...
Citation -
KP-2585-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5307, R-Canal. Looking downstream from Station 37+07 of the R-Canal. Water flowing at the check at Station 37+36; January 18, ...
Citation -
23. [Image] Gerber Dam
CN-12-201-533NA Klamath Project. View from right abutment of Gerber Dam, showing water flowing over spillway into plunge pool at base of Dam, 60 cfs.; May 22, 1975; USBR photo by A. L. BardalCitation -
24. [Image] Gerber Dam
CN-12-201-534NA Klamath Project. View of water flowing over spillway into plunge pool at base of Gerber Dam, from right side of plunge pool; May 22, 1975; USBR photo by A. L. BardalCitation -
25. [Image] Gerber Dam
CN-12-201-535NA Klamath Project. View of water flowing over spillway into plunge pool at base of Gerber Dam, from right side of plunge pool; May 22, 1975; USBR photo by A. L. BardalCitation -
26. [Image] Gerber Dam
CN-12-201-536NA Klamath Project. View of water flowing over spillway into plunge pool at base of Dam, from area below left abutment; May 22, 1975; USBR photo by A. L. BardalCitation -
27. [Image] Gerber Dam
CN-12-201-537NA Klamath Project. View of water flowing over spillway into plunge pool at base of Dam, from area below left abutment; May 22, 1975; USBR photo by A. L. BardalCitation -
28. [Image] Gerber Dam
CN-12-201-543NA Klamath Project. View from Dam crest of water flow over Gerber spillway from left side. Spill was 60 cfs.; May 22, 1975; USBR photo by A. L. BardalCitation -
29. [Image] Sealing, Repair and Modification of Gerber Dam -Specs. 200C-888 - Dante Engineers & Contractors
CN-12-201-578NA Klamath Project - Oregon-California. View of downstream face of Gerber Dam. Note new footbridge in foreground. Note water flowing over rock weir which was constructed under this specification ...Citation -
A horse-drawn wagon and driver situated in front of a fountain identified as the Skidmore Fountain. Two horses harnessed to the wagon drink from the fountain as the driver looks on. He is dressed in a ...
Citation