Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California)

Search Results

  • 3786
    P12-200-2676 - Klamath Project, California - TUBE IRRIGATION OF POTATOES ON B.M. HAYNES HOMESTEAD IN TULE LAKE AREA. (color); July 12, 1962; Photo by Wes Nell
    Citation
  • 3722
    KP-2628-R2-Klamath Project -- TULE LAKE SUMP 2, Specifications DC-5307. Potato field, Lease unit No. 39, irrigated from irrigation system constructed in 1960; July 14, 1961; Photo by K.J. Greene
    Citation
  • 3295
    KP-2408-R2 - TULELAKE IRRIGATION DISTRICT - Klamath Project. Small pumping plant which pumps water from No. 45 drain into J-11 lateral. This type is called a "box pump" locally. The vertical column is ...
    Citation
  • 3714
    KP-2620-R2-Klamath Project -- TULE LAKE SUMP 3, N-1 LATERAL. View looking north showing completed lateral, 101-C-1 Drain and east-west secondary drains. North-south lines in fields are farmers' irrigation ...
    Citation
  • 3715
    KP-2621-R2-Klamath Project -- TULE LAKE SUMP 3, N-8 LATERAL. View looking north showing reconstruction of lateral under Specs. DC-5389. East bank of existing lateral is being moved to form west bank of ...
    Citation
  • 3747
    P12-200-2649 - Klamath Project, California - TULE LAKE SUMP 3, N-13 Lateral Specifications DC-5686. View looking west from N-Canal bank. Bottom lining, south lining and bank are completed. Lining on north ...
    Citation
  • 623
    June 9, 1905
    Citation
  • 3220
    KP-2346-R2 - Klamath Project--TULE LAKE DIVISION; May 1956; Photo by K. J. Greene
    Citation
  • 1454
    KP-1112-R2; Tules have been burnt off. Looking southeast from north dike N-Canal, center of Section 11; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 3732
    KP-2634-R2-Klamath Project -- TULE LAKE SUMP 2. Harvesting potatoes in Lease Unit 31 in area under irrigation and drainage system constructed in 1960 under Specifications DC-5307. Yield about 300 sacks ...
    Citation
  • 5055
    CN-12-201-512NA Klamath Project - Oregon-California; May 1975; USBR photo by J. W. Legg
    Citation
  • 3411
    C12-200-2706 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. Recently-discovered crack in bottom of N-1 Lateral. View looking upstream near Sta. 102. Lateral was in use during ...
    Citation
  • 3751
    P12-200-2653 - Klamath Project, California - TULE LAKE SUMP 3, N-12-e Lateral, Specifications DC-5686. View looking east to 42-inch diameter flume over 101-B Drain. Large amount of return flow from secondary ...
    Citation
  • 5018
    CN-12-201-473NA Klamath Project - Oregon-California; August 7, 1974; USBR photo by J. W. Legg
    Citation
  • 5047
    CN-12-201-504NA Klamath Project - Oregon-California. Note deterioration of the stringers and sills. The Tulelake Irrigation District will reconstruct this bridge installing new stringer and treated sill ...
    Citation
  • 1088
    December 13, 1924
    Citation
  • 3406
    P12-200-2701 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 78. View looking southeast showing motor patrol finishing lining; September 5, 1962; Photo ...
    Citation
  • 3427
    P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. Stein
    Citation
  • 3524
    KP-2511-R2-Klamath Project -- Tule Lake Sump 2, Pumping Plant 9. Tule Lake Irrigation District removes old structure at pumping plant site. This structure was floated on oil barrels and end was anchored ...
    Citation
  • 1452
    KP-1110-R2 - Klamath Project; Tulana Farms, the lessee of this land, has constructed a dike holding back Tule Lake waters and have burnt off the tules in preparation for cultivation. Looking south from ...
    Citation
  • 1453
    KP-1111-R2 - Klamath Project; Tules have been burnt off preparatory to cultivation. Looking south from north dike N-Canal, north center of Section 11; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1533
    KP-1189-R2 - Klamath Project - Region II. Mesheke, a veteran, was a Machinist's Mate 3/c in the Navy, and spent 20 months overseas going from Okinawa to Tokyo on the Destroyer Benham. He has earned two ...
    Citation
  • 3585
    KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
    Citation
  • 3586
    KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
    Citation
  • 3587
    KP-2571-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Hancock Elevating Scraper, 8 cu. yd. capacity with sideboards, placing canal lining at Station 29+50, R-Canal; ...
    Citation
  • 3588
    KP-2572-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. John Deere tractor, Model A, pulling a 10-ton pneumatic roller to compact canal lining, Station 29+50, R-Canal; ...
    Citation
  • 3665
    KP-2593-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "W". View looking southwest into inlet channel of Pumping Plant "W". Plant is irrigating the southwest corner ...
    Citation
  • 3419
    P12-200-2714 - Klamath Project - TULE LAKE SUMP 2 - View east across Q canal showing dust storm; March 28, 1963; Photo by C. D. Lawrence
    Citation
  • 3258
    KP-2374-R2 - Klamath Project--TULE LAKE DIVISION. Fine grading and placing 42" diameter concrete pipe to prevent seepage through rocky area; December 1956; Photo by L. McAnulty
    Citation
  • 3259
    KP-2375-R2 - Klamath Project--TULE LAKE DIVISION. Curling joints on 42" diameter control pipe; December 1956; Photo by L. McAnulty
    Citation
  • 1600
    KP-1299-R2--Klamath Project. Tule Lake Division. Modoc Unit; February 13, 1947; Photo by Dorwin Grise
    Citation
  • 1662
    KP-1300-R2--Klamath Project. Region II. Tule Lake Division. Modoc Unit. Pumping Plant "D", northwest view of plant and transformers from hillside above plant; February 13, 1947; Photo by Dorwin Gri...
    Citation
  • 1664
    KP-1312-R2 Klamath Project. Region II. Tule Lake Division. Modoc Unit; February 24, 1947; Photo by Dorwin Grise
    Citation
  • 1665
    KP-1313-R2 - Klamath Project. Region II. Tule Lake Division. Modoc Unit; February 24, 1947; Photo by Dorwin Grise
    Citation
  • 1666
    KP-1314-R2 - Klamath Project. Region II. Tule Lake Division. Modoc Unit; February 24, 1947; Photo by Dorwin Grise
    Citation
  • 1667
    KP-1315-R2 - Klamath Project. Region II. Tule Lake Division. Modoc Unit; February 24, 1947; Photo by Dorwin Grise
    Citation
  • 1443
    KP-1101 - R2 - Klamath Project. It is ready for backfilling; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1444
    KP-1102-R2 - Klamath Project; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1445
    KP-1103-R2 - Klamath Project; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1450
    KP-1108-R2 - Klamath Project; Combination check and bridge under construction at the Tule Lake Sump end of the N-Canal; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1458
    KP-1116-R2 - Klamath Project - Tule Lake Division; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1459
    KP-1117-R2 - Klamath Project - Tule Lake Division; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1461
    KP-1119-R2 - Klamath Project; July 2, 1945; Photo by C. O. Wamstad
    Citation
  • 1462
    KP-1120-R2 - Klamath Project; July 2, 1945; Photo by Mark D. Taylor, Jr.
    Citation
  • 1463
    KP-1121-R2 - Klamath Project. Concrete surface has been treated with a curing compound; July 2, 1945; Photo by C. O. Wamstad
    Citation
  • 1470
    KP-1128-R2 - Klamath Project. All work completed; July 18, 1945; Photo by C. O. Wamstad
    Citation
  • 1471
    KP-1129-R2 - Klamath Project. Concrete collars connecting the wooden discharge lines with the 30-inch steel pipe are coming from the pumps; July 18, 1945; Photo by C. O. Wamstad
    Citation
  • 1472
    KP-1130-R2 - Klamath Project; July 18, 1945; Photo by C. O. Wamstad
    Citation
  • 1473
    KP-1131-R2 - Klamath Project; Moss is hanging on the pickets; July 18, 1945; Photo by C. O. Wamstad
    Citation
  • 1489
    KP-1147-R2 - Klamath Project - Tule Lake Division - O&M; August 8, 1945; Photo by R. S. Hopkins
    Citation
  • 1490
    KP-1148-R2 - Klamath Project - Tule Lake Division - O&M; August 18, 1945; Photo by R. S. Hopkins
    Citation
  • 1521
    KP-1177-R2 Klamath Project - Tule Lake Division - O&M; June 13, 1946; Photo by R. S. Hopkins
    Citation
  • 1433
    KP-1091-R2-Klamath Project - Tule Lake Division - Modoc Unit. The transition structure here is the head of the "M" Canal and is set mostly in backfill; January 29, 1945; Photo by R.S. Hopkins
    Citation
  • 1438
    KP-1096-R2 - Klamath Project - Tule Lake Division - Modoc Unit. Reinforcing steel and forms are in place; January 29, 1945; Photo by R. S. Hopkins
    Citation
  • 1205
    855 - Klamath; May 27, 1939; Farms in Tule Lake Division in foreground entered in 1938
    Citation
  • 3759
    P12-200-2661 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b, Sta. 58. Cat 12 motor patrol finishing lateral prism; May 31, 1962; Photo by K.J. Greene
    Citation
  • 2609
    KP-1972- Klamath Project. Tule Lake. In matter of hours bank would wash out; June 8, 1950; Photo by Andrew M. Bergloff
    Citation
  • 3656
    KP-2584-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5307, R-Canal. R-Canal headworks showing gate lifts and inlet channel; January 18, 1961; Photo by John A. Renning
    Citation
  • 3750
    P12-200-2652 - Klamath Project, California - TULE LAKE SUMP 3, N-12-e Lateral. View looking north to check at Station 52+68; April 13, 1962; Photo by K.J. Greene
    Citation
  • 3752
    P12-200-2654 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5389, N-4 Lateral. View looking south to check at Sta. 37+41; April 17, 1962; Photo by K.J. Greene
    Citation
  • 2460
    KP-1941 - Klamath Project; March 29, 1950; Photo by Andrew M. Bergloff
    Citation
  • 62. [Image] Tule Lake Division
    2865
    KP-2151-R2 - Klamath Project. Tule Lake Division. Break in right bank of J-14 Lateral below Station 50+00; September 12, 1952; Photo by C. O. Wamstad
    Citation
  • 3126
    KP-2265-R2 - Klamath Project--Tule Lake Division. Fine grading and removal of rock from the N-20-a Lateral prior to installation of pipe line; November 30, 1954; Photo by Luther McAnulty
    Citation
  • 3385
    P12-200-2682 - Klamath Project, California - TULE LAKE SUMP 3, N-12-C Lateral, Specifications DC-5624. Ninety-eight Linksbelt Dragline with 1 1/2 cu. yd. bucket is excavating lateral prism which lies ...
    Citation
  • 3386
    P12-200-2683 - Klamath Project, California - TULE LAKE SUMP 3, N-12-C Lateral, Sepcifications [sic] DC-5621. View of bulldozer spreading dry material placed by dragline. Material is then rolled with sheepsfoot ...
    Citation
  • 3387
    P12-200-2684 - Klamath Project, California - TULE LAKE SUMP 3, N-12-C Lateral, Sta. 120, Specifications DC-5621. View of tractor pulling sheepsfoot roller and spring tooth harrow mixing and compacting ...
    Citation
  • 3398
    P-12-200-2693 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-15-b Lateral, Station 33. View looking northwest showing tractor and scraper placing lining in south bank; August ...
    Citation
  • 3399
    P-12-200-2694 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-b Lateral, Station 33. View looking northwest showing tractor, sheeps foot roller and spring tooth harrow ...
    Citation
  • 3400
    P-12-200-2695 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-15-b Lateral, Station 34. View looking south showing motor patrol finishing lining on south bank; August 6, ...
    Citation
  • 3402
    P-12-200-2697 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 110. View looking north showing section excavated by dragline. Section is excavated to ...
    Citation
  • 3403
    P-12-200-2698 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 104. View looking south showing dry material placed in bottom. This is mixed with lower ...
    Citation
  • 3404
    P12-200-2699 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 90. View looking north showing sheeps foot roller and spring tooth harrow mixing and compacting ...
    Citation
  • 3405
    P12-200-2700 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 78. View looking southeast showing three double-drum sheeps foot rollers and spring tooth ...
    Citation
  • 3407
    P12-200-2702 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5629 - N-12-c Lateral. View of recently-completed lateral looking upstream (north) near check at Station 87+50; January 8, 1963; Photo ...
    Citation
  • 3408
    P12-200-2703 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-12-a Lateral. View of new lateral looking upstream (north) from Sta. 104+50; January 8, 1963; Photo by C. D. Lawrence
    Citation
  • 3409
    P12-200-2704 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-a Lateral. View of N-15-a Lateral in final stage of construction. Looking upstream (east) near check at Sta. 40; January 8, ...
    Citation
  • 3410
    P12-200-2705 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-b Lateral. Final stage of construction looking downstream (west) near Sta. 38; January 8, 1963; Photo by C. D. Lawrence
    Citation
  • 3412
    P12-200-2707 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. View of berm and drain adjacent to cracked section of lateral. Note no significant evidence of movement or uplift ...
    Citation
  • 3413
    P12-200-2708 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. North face of trench at Station 102+70; February 7, 1963; Photo by C. D. Lawrence
    Citation
  • 3414
    P12-200-2709 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. South face of trench at Station 105+00; February 7, 1963; Photo by C. D. Lawrence
    Citation
  • 3415
    P12-200-2710 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. View of water standing on lining directly over crack four days after storm of February 1-3, 1963. Note ...
    Citation
  • 3416
    P12-200-2711 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 82. View looking east showing trimmed side slopes and bottom section; March 12, 1963; Photo by C. D. Lawr...
    Citation
  • 3417
    P12-200-2712 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 55. View looking east showing fill machine placed. Gradall machine in background trimming side slopes and ...
    Citation
  • 3418
    P12-200-2713 - Klamath Project - TULE LAKE SUMP 2 - Specifications. No. 200C-519 - Q-2 Lateral. View looking east showing lateral being filled for first time after raising banks; March 28, 1963; Photo ...
    Citation
  • 3425
    P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...
    Citation
  • 1435
    KP-1093-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Considerable water was encountered and two 6" and two 10" pumps were required to dewater the hole. After dewatering was completed and the ...
    Citation
  • 3760
    P12-200-2662 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b Lateral, Sta. 54. 1 1/2 cu yard Link Belt Dragline building normal bank on top of lining. Material will be smoothed ...
    Citation
  • 3802
    P12-200-2795A Tule Lake Sumps - Klamath Project--Oregon California. View of opening cut in Q-Canal Bank just below headworks discharging controlled release of flood water from Sump 1-A to Sump 2. Water ...
    Citation
  • 3803
    P12-200-2796A Tule Lake Sumps - Klamath Project--Oregon-California. View of opening cut in R-Canal bank about 100 feet downstream from headgate to permit controlled release of flood water from Sump ...
    Citation
  • 2612
    KP-1975- Klamath Project. Tule Lake Sump Dikes. Looking south from County Road Bridge. Picture shows N-Canal and area west of canal bank including 101-A-2-a Drain and Borrow Strip; June 15, 1950; Photo ...
    Citation
  • 3570
    KP-2554-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248 - Q-Canal. TD-18 Tractor and 4'x4' dual drum sheepsfoot roller compacting canal lining, bottom of Q-Canal, Station 38+00; ...
    Citation
  • 3571
    KP-2555-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. 10 cubic yard scraper and TD-14 tractor placing lining in left bank lateral, Station 1+00; July 29, 1960; ...
    Citation
  • 3580
    KP-2564-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking downstream from Station 5+00. Bottom width 10 feet, height of canal banks, ...
    Citation
  • 3581
    KP-2565-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking upstream from Station 48+00. Bottom width, 10 feet; height of canal banks, ...
    Citation
  • 3582
    KP-2566-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Q-Canal - Specifications DC-5248. Prefabricated metal farm turnout inlet with well for flow measurement; September 21, 1960; Photo by John A. Re...
    Citation
  • 3583
    KP-2567-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Installing prefabricated metal farm turnout at Station 9+50, Q-Canal metal diaphragm in background; October 18, ...
    Citation
  • 3584
    KP-2568-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. Installing prefabricated metal wasteway at the end of the Q-1 Lateral, Station 88+33.7. Backfill compacted ...
    Citation
  • 3639
    KP-2573-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. 4-inch diameter aluminum pipe sprinkler system being used to sprinkle borrow areas adjacent to R-Canal, Station ...
    Citation
  • 3640
    KP-2574-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Gasoline engine-driven pump supplies water for sprinkler system; September 30, 1960; Photo by John A. Renning
    Citation
  • 3644
    KP-2578-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, Secondary Drain No. 4. View of Hancock elevating scrapers excavating select material from Secondary Drain No. 4 for use ...
    Citation