Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California) Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction

Search Results

  • 3714
    KP-2620-R2-Klamath Project -- TULE LAKE SUMP 3, N-1 LATERAL. View looking north showing completed lateral, 101-C-1 Drain and east-west secondary drains. North-south lines in fields are farmers' irrigation ...
    Citation
  • 3715
    KP-2621-R2-Klamath Project -- TULE LAKE SUMP 3, N-8 LATERAL. View looking north showing reconstruction of lateral under Specs. DC-5389. East bank of existing lateral is being moved to form west bank of ...
    Citation
  • 3747
    P12-200-2649 - Klamath Project, California - TULE LAKE SUMP 3, N-13 Lateral Specifications DC-5686. View looking west from N-Canal bank. Bottom lining, south lining and bank are completed. Lining on north ...
    Citation
  • 3406
    P12-200-2701 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 78. View looking southeast showing motor patrol finishing lining; September 5, 1962; Photo ...
    Citation
  • 3585
    KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
    Citation
  • 3586
    KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
    Citation
  • 3587
    KP-2571-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Hancock Elevating Scraper, 8 cu. yd. capacity with sideboards, placing canal lining at Station 29+50, R-Canal; ...
    Citation
  • 3588
    KP-2572-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. John Deere tractor, Model A, pulling a 10-ton pneumatic roller to compact canal lining, Station 29+50, R-Canal; ...
    Citation
  • 3759
    P12-200-2661 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b, Sta. 58. Cat 12 motor patrol finishing lateral prism; May 31, 1962; Photo by K.J. Greene
    Citation
  • 3126
    KP-2265-R2 - Klamath Project--Tule Lake Division. Fine grading and removal of rock from the N-20-a Lateral prior to installation of pipe line; November 30, 1954; Photo by Luther McAnulty
    Citation