Search
You searched for:
Start Over
History
Remove constraint History
Subject
Pumping Plant EE (Oregon)
Remove constraint Subject: Pumping Plant EE (Oregon)
« Previous | 1 - 10 of 74 | Next »
Search Results
-
1. [Image] General View of Location of new Pumping Plant "EE" and Center Flume extention, looking north
P-12-200-4187NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. SteinCitation -
P-12-200-4229NA Klamath Project - Oregon-California. Excavating site for pumping plant "EE". One TD-25 dozer and one D-8 dozer excavating area down to elev. 4070. View lookig north. This is the first ...
Citation -
P-12-200-4230NA Klamath Project - Oregon-California. View of downstream transition area of Pumping Plant "EE" (right side). Excavation line can be seen at rt. side of photo; September 1976; USBR photo ...
Citation -
P-12-200-4232NA Klamath Project - Oregon-California. Pumping Plant "EE" site. View of material before drilling operations for dewatering well. Note large boulders that were excavated. This material ...
Citation -
P-12-200-4233NA Klamath Project - Oregon-California. Rotary drill rig drilling wells for dewatering Pumping Plant "EE" site. Site was excavated to elev. 4070± and 24" wells were drilled 30± feet; 10" ...
Citation -
P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
Citation -
P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
Citation -
P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high ...
Citation -
P12-201-4530 NA Klamath Project, OR-CA. Same view as Photo P-12-201-4529, except looking east; February 1978; USBR photo by D.J. Kline
Citation -
P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
Citation