Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
« Previous | 1 - 100 of 490 | Next »
Search Results
-
1. [Image] KLAMATH STRAITS DRAIN
P12-200-2741A- Klamath Project - KLAMATH STRAITS DRAIN - View of Fish and Wildlife Service dragline cleaning left side and bottom section, Sta. 489, working upstream. Note right side previously cleaned ...Citation -
P12-201-4392 NA Klamath Project, OR-CA. Center Canal Flume--View of flume repairs. 24" CMP for supplying irrig. water to ranchers while allowing work inside flume. Nine 1-inch temporary flume tie rods ...
Citation -
KP-1167-R2 Klamath Project - Klamath Straits Drain Outlet; Flood irrigation of the lands is in progress. View shows effects of a wind storm on power line due the the poor stability of earth in which ...
Citation -
P-12-200-4021 NA Klamath Project, California-Oregon. The Klamath Project has a system of canals, laterals, and drains which provide irrigation facilities for 85,000 acres and approximately 95,000 acres ...
Citation -
5. [Image] KLAMATH STRAITS DRAIN
P12-200-2740 A- Klamath Project - KLAMATH STRAITS DRAIN - View of Tulelake dragline cleaning right side, Sta. 504, working upstream; September 12, 1963; Photo by D. W. SteinCitation -
6. [Image] Enlargement of Klamath Straits Drain
KP-1809-R2; June 29, 1949; Photo by Hugh P. CrawfordCitation -
KP-1133-R2 - Klamath Project; Detail of rubber water stop in the contraction joint; July 20, 1945; Photo by C. O. Wamstad
Citation -
KP-1134-R2 - Klamath Project; General view of syphon from the south or outlet end; July 20, 1945; Photo by C. O. Wamstad
Citation -
9. [Image] Klamath Straits Drain Outlet
KP-1137-R2 - Klamath Project; Jacking equipment and operations for constructing 3-barrel 4'6" C. M. P. syphon under S. P. [South Pacific?] Railroad; August 14, 1945; Photo by C. O. WamstadCitation -
10. [Image] Klamath Straits Drain Outlet
KP-1138-R2 - Klamath Project; Jacking equipment and operations for constructing 3-barrel 4'6" C. M. P. syphon under S. P. [South Pacific?] Railroad; August 14, 1945; Photo by C. O. WamstadCitation -
11. [Image] Klamath Straits Drain Outlet
KP-1145-R2 - Klamath Project; View of puddle trench for north bank of drain, looking west from about Sts. 100; August 14, 1945; Photo by Mark TaylorCitation -
12. [Image] Klamath Straits Drain Outlet
KP-1146-R2 - Klamath Project; Telephoto view of area through which small skid machine was working, with the machine in operation; August 14, 1945; Photo by Mark TaylorCitation -
13. [Image] Klamath Straits Drain Outlet
KP-1155-R2 - Klamath Project; General view of form-work and under-pinning for concrete placement on the Middle Canal flume; November 6, 1945; Photo by C. O. WamstadCitation -
14. [Image] Klamath Straits Drain Outlet. Pumping plant G
KP-1157-R2 - Klamath Project; Backfilling under outlet structure floor. Compacting is done with pneumatic tampers; November 6, 1945; Photo by C. O. WamstadCitation -
15. [Image] General view of the Klamath Strait Drain
KP-1174-R2 Klamath Project; Photograph taken from the Township line bridge looking North to the Middle Canal flume and Pumping Plant E; June 6, 1946; Photo by R. S. HopkinsCitation -
KP-2071-R2 - Klamath Project. Klamath Straits Drain; September 11, 1950; Photo by Andrew M. Bergloff
Citation -
17. [Image] Klamath Straits Drain - Middle Canal Flume
KP-2069-R2 - Klamath Project. Klamath Straits Drain. Middle Canal Flume. Southeast side of flume showing 1 1/2-inch drop of apron at the outlet end of flume; September 11, 1950; Photo by Andrew M. Ber...Citation -
18. [Image] Klamath Straits Drain - Middle Canal Flume
KP-2068-R2 - Klamath Project. Klamath Straits Drain. Middle Canal Flume. Southwest end of Flume showing seam opening when apron is lifted into place; September 11, 1950; Photo by Andrew M. BergloffCitation -
P-12-200-4170NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob Hamilton
Citation -
20. [Image] P12-201-4601NA. Same as #4600 above
P12-201-4601NA Same as #4600 above P12-201-4602NA Same as #4600 aboveCitation -
21. [Image] P12-201-4602NA
P12-201-4602NACitation -
P12-201-4620NA Same as #4619 above
Citation -
P12-201-4622NA Same as #4621 above
Citation -
P12-201-4624NA Same as #4625 above
Citation -
P12-200-2686 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN, flume across Klamath Straits Drain at Pumping Plant E. View of south side of flume looking west, showing material that was eroded into the ...
Citation -
P12-200-2687 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN flume across Klamath Straits Drain at Pumping Plant E. View of north side of flume looking west, showing material that was eroded into the ...
Citation -
P12-200-2688 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN, flume across Klamath Straits Drain at Pumping Plant E. Closeup view of north side of flume showing where the material was eroded away from ...
Citation -
P12-200-2727 - Klamath Project - KLAMATH STRAITS DRAIN - Middle Canal Flume repair, Specs. No. 201C-3(SF). View of raised concrete walls just completed by contract. Note "slough in" caused by overflow ...
Citation -
KP-1132-R2 - Klamath Project; General view of the end of the barrel at the north or upstream contraction joint. Only fine grading has been completed for the next section connecting the barrel with the ...
Citation -
30. [Image] Klamath Straits Drain Outlet
KP-1135-R2 - Klamath Project; Concrete mixing plant of the Tru-Mix Concrete Company at Pumping Plant "E", showing aggregate bins, batching hopper, mixer and the pumpcrets machine used for the delivery ...Citation -
31. [Image] Klamath Straits Drain Outlet - Pumping Plant E
KP-1136-R2 - Klamath Project; General view looking toward the back end of the excavation for the sub-structure. The foundation is a tight medium weight clayish material that stands almost vertical in ...Citation -
KP-1156-R2 - Klamath Project; Concrete has been placed up to the pump floor. Burlap sacks over the concrete were kept damp for curing; November 6, 1945; Photo by C. O. Wamstad
Citation -
33. [Image] Klamath Straits Drain - Middle Canal Flume
KP-2070-R2 - Klamath Project. Klamath Straits Drain. Middle Canal Flume. Northeast side of flume showing newly driven piles. Piles are to support a concrete beam which will be poured after apron is ...Citation -
P-12-200-4134NA Klamath Project - Oregon-California. View of excavation looking east, vicinity of 54" cmp at Sta. 17+90, Klamath Straits Drain; December 1975; USBR photo by R. J. Hamilton
Citation -
P-12-200-4135NA Klamath Project - Oregon-California. View of excavation looking east, vicinity of 54" cmp at Sta. 17+90, Klamath Straits Drain; December 1975; USBR photo by R. J. Hamilton
Citation -
P-12-200-4139NA Klamath Project - Oregon-California. Looking east toward State Line Drain construction, from west bank of Klmath Straits Drain; December 1975; USBR photo by R. J. Hamilton
Citation -
P-12-200-4145NA Klamath Project - Oregon-California. 54" inlet structure at Sta. 1+50±. (Straits Dran Sta. 17+80 at right); December 1975; USBR photo by R. J. Hamilton
Citation -
P-12-200-4149NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dike Created ...
Citation -
P-12-200-4150NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. View of drain, ...
Citation -
P-12-200-4151NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dragline dumping ...
Citation -
P-12-200-4157NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised coulters for this view. Photo shows 4-inch pipe with drain guard about 5' below natural ground; ...
Citation -
P-12-200-4158NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised the coulters for this view. Photo shows 8-inch pipe about 6.5 ft. below natural ground surface. ...
Citation -
P-12-200-4159NA Klamath Project - Oregon-California. View of marmots at headworks of drain on left bank. Note large holes that extend very deep below ground surface; May 1976; USBR photo by D. W. S...
Citation -
P-12-200-4160NA Klamath Project - Oregon-California. View of walkway installation at 36" CMP input, Sta. 51+90, left. Laborer using an earth wacker to drive sheet piling. Method seems to work but driver ...
Citation -
P-12-200-4161NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4162NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4163NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4164NA Klamath Project - Oregon-California. View of 36" walkway at Sta. 51+90, front piling looking down inside; May 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4165NA Klamath Project - Oregon-California. Walkway piling installed at Sta. 51+90, looking towards inlet gate; May 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4169NA Klamath Project - Oregon-California. Straits Unit-East; April 1976; USBR photo by Bob Hamilton
Citation -
51. [Image] Jim Reed, USBR employee, prepping 48" CMP prior to assembly with bands, NW corner Lot #4, Straits Unit East
P-12-200-4171NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob HamiltonCitation -
52. [Image] Norm Swan, USBR employee, excavating for 48" CMP at NW corner of Lot #4, Straits Unit East
P-12-200-4172NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob HamiltonCitation -
P-12-200-4173NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob Hamilton
Citation -
P-12-200-4174NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob Hamilton
Citation -
55. [Image] Reinforced 24" gate frame before addition of walkway, SE corner of Lot #10b, Straits Unit East
P-12-200-4175NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob HamiltonCitation -
P-12-200-4182NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
Citation -
P-12-200-4183NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
Citation -
P-12-200-4184NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
Citation -
P-12-200-4185NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
Citation -
P-12-200-4186NA Klamath Project - Oregon-California. View of Northwest dragline with 1-3/4 cu. yd. bucket rigged up to excavate under Township Line Bridge; June 1976; USBR Photo by D. W. Stein
Citation -
P-12-200-4195NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 92+10, right. Sheet piling all completed and laborer with earth wacker compacting fill inside structure; June 1976; ...
Citation -
P-12-200-4196NA Klamath Project - Oregon-California. Ten cu. Yd. end dump truck dumping riprap downstream right side of Township Line Bridge. This is to be placed and shaped later with 3/4 yd. linkbelt ...
Citation -
P-12-200-4197NA Klamath Project - Oregon-California. Linkbelt dragline placing and shaping riprap upstream, left of Township Line Bridge; June 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4198NA Klamath Project - Oregon-California. Linkbelt dragline placing and shaping riprap upstream, left of Township Line Bridge; June 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4199NA Klamath Project - Oregon-California. View of abutment upstream of bridge showing riprap in place; June 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4200NA Klamath Project - Oregon-California. View of riprap, left side, downstream for Township Line Bridge. Riprap will be placed and shaped later by linkbelt dragline; June 1976; USBR photo ...
Citation -
67. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4201NA Klamath Project - Oregon-California. Northwest 80-D dragline, with 60 ft. boot and 1-3/4 cu. yd. bucket, excavating drain at Sta. 200±, right side. View taken from Township Line Road, ...Citation -
68. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4202NA NA Klamath Project - Oregon-California. Northwest 80-D dragline, with 60 ft. boot and 1-3/4 cu. yd. bucket, excavating drain at Sta. 200±, right side. View taken from Township Line ...Citation -
69. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4203NA Klamath Project - Oregon-California. View of contractor repairing the Northwest 80-D dragline (swing shift). It was necessary to jack up the house off the tracks; July 1976; USBR photo ...Citation -
70. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4204NA Klamath Project - Oregon-California. View of contractor repairing the Northwest 80-D dragline (swing shift). It was necessary to jack up the house off the tracks; July 1976; USBR photo ...Citation -
71. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4205NA Klamath Project - Oregon-California. Northwest 80-D dragline excavating drain at Sta. 255±. Note pad that had to be dozed up for dragline to work from. Area is very low, looking upstream; ...Citation -
72. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4206NA Klamath Project - Oregon-California. (Caption same as P-12-200-4205, except looking northeast).Citation -
73. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4207NA Klamath Project - Oregon-California. Northwest 80-D dragline, 1-3/4 cu. yd. bucket and 60ft. boom, excavating at Sta. 255±, looking upstream. Note how low bank is in area before excavation; ...Citation -
74. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4216-Klamath Project - Oregon-California. Northwest 80-d dragline shown excavating drain, enlarging left side, taken at Sta. 295±, looking west, downstream; August 1976; USBR photo by D. W. ...Citation -
75. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4217NA Klamath Project - Oregon-California. Northwest 80-D dragline excavating drain section at Sta. 302±. This is the oxbow area where new channel is to be constructed. Note that very little ...Citation -
76. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4218NA Klamath Project - Oregon-California. Northwest 80-D dragline excavating drain section at Sta. 302±. This is the oxbow area where new channel is to be constructed. Note that very little ...Citation -
77. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4219NA Klamath Project - Oregon-California. Northwest 80-D dragline excavating drain section at Sta. 302±. This is the oxbow area where new channel is to be constructed. Note that very little ...Citation -
78. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4222NA Klamath Project - Oregon-California. Borrow pit for sub-base material for road to be constructed on west bank of drain. Material was very tight and had to be ripped by a D-8 dozer. ...Citation -
79. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4223NA Klamath Project - Oregon-California. Borrow pit for finish grade material for road to be constricted on west bank of drain. D-8 dozer ripping material and 4 c.y. caterpillar loading 20 ...Citation -
80. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4224NA Klamath Project - Oregon-California. Another view of borrow pit for finish grade material for road to be constructed on west bank of drain. D-8 dozer ripping material and 4 c.y. caterpillar ...Citation -
81. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4225NA Klamath Project - Oregon-California. View looking west of two Motor Graders in final stages of grading west bank of drain; August 1976; USBR photo by D. W. SteinCitation -
82. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4226NA Klamath Project - Oregon-California. Model No. 12 Motor Grader leveling and shaping finish grade material on road to be constructed on west bank of drain. View looking north; August ...Citation -
83. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4227NA Klamath Project - Oregon-California. A 966-C Loader pulling a Hyster grid roller on sub-base material on road to be constructed on west bank of the drain. Contractor elected to consolidate ...Citation -
84. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4228NA Klamath Project - Oregon-California. Another view of 966-C Loader pulling a Hyster grid roller on sub-base material in road to be constructed on west bank of drain. Contractor elected ...Citation -
P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
Citation -
P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4494 NA Klamath Project, OR-CA. Preparation of 84" RCP pipe bedding. Total depth 2' consisting of 1 to 1.5 foot of 3" minus rock and 1' to 6" of 3/4 minus material with a large percentage of fines. ...
Citation -
P12-201-4500 NA Klamath Project, OR-CA. Ady Canal -- Siphon forming going up for round to square transition on outlet of 84" CMP. Bulkhead in background is for shoring tunnel exit from under SP RR tracks; ...
Citation -
P12-201-4501 NA Klamath Project, OR-CA. Center Canal Flume -- Photo shows crack on floor joint of flume after cleanup. These were dried using propane heaters overnight prior to repairs. These joint openings ...
Citation -
P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
Citation -
P12-201-4503 NA Klamath Project, OR-CA. Center Canal Flume -- Curing tent used in repair of joint (photos 4501NA & 4502NA of flume repairs). Also shows location of this joint in relation to flume wooden ...
Citation -
P12-201-4504 NA Klamath Project, OR-CA. Center Canal Flume -- Repaired joint shown in previous photos. Used a 6" neoprene waterstop and a 3 part PRC sealer. Also drilled 3/4" anchors on 6" alternating ...
Citation -
P12-201-4505 NA Klamath Project, OR-CA. Center Canal Flume -- View of second repaired joint where slope walls join vertical walls. This was repaired the same as the first joint; January 12, 1978; USBR ...
Citation -
P12-201-4506 NA Klamath Project, OR-CA. Center Canal Flume -- View of floor and south wall looking down at the joint between the new and old portions of the flume. This joint was repaired using a rubber ...
Citation -
P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
Citation -
P12-201-4508 NA Klamath Project, OR-CA. Center Canal Flume -- View looking SE at outlet area of Center Canal Flume after second dewatering was removed and after flume repairs were completed; January 13, ...
Citation -
P12-201-4512 NA Klamath Project, OR-CA. Ady Canal -- View of siphon round to square transition at the outlet west of the SP RR embankment. Photo shows cribbing and reinforcement prior to removal before ...
Citation