« Previous | 41 - 50 of 162 | Next »
Search Results
-
P12-201-4528 NA Klamath Project, OR-CA. Cold weather protection that was installed for painting Plant FF pump units and also utilized for dressing up face of wall where spillage occurred when placing deck ...
Citation -
P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high ...
Citation -
P12-201-4530 NA Klamath Project, OR-CA. Same view as Photo P-12-201-4529, except looking east; February 1978; USBR photo by D.J. Kline
Citation -
P12-201-4533 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc completing the connection of Klamath Straits Drain to Plant FF's inlet; March 13, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
Citation -
P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
Citation -
P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
Citation -
P12-201-4538NA Klamath Project, OR-CA. View of jetting nozzle built by contractor in accordance with recommendations of an engineering geologist; March 20, 1978; USBR photo by R.J. Hamilton
Citation -
P12-201-4539NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water jetting from nozzle. Water jet traveled approx. 4 ft. horizontally before hitting the imaginary ground surface (est. 22 ...
Citation -
P12-201-4540NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water flowing from base of the left retaining wall at Plant E. Flow was a by-product of jetting operations for Plant E west ...
Citation