Search Results

  • 4375
    P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4311
    P-12-200-4229NA Klamath Project - Oregon-California. Excavating site for pumping plant "EE". One TD-25 dozer and one D-8 dozer excavating area down to elev. 4070. View lookig north. This is the first ...
    Citation
  • 4312
    P-12-200-4230NA Klamath Project - Oregon-California. View of downstream transition area of Pumping Plant "EE" (right side). Excavation line can be seen at rt. side of photo; September 1976; USBR photo ...
    Citation
  • 4314
    P-12-200-4232NA Klamath Project - Oregon-California. Pumping Plant "EE" site. View of material before drilling operations for dewatering well. Note large boulders that were excavated. This material ...
    Citation
  • 4316
    P-12-200-4233NA Klamath Project - Oregon-California. Rotary drill rig drilling wells for dewatering Pumping Plant "EE" site. Site was excavated to elev. 4070± and 24" wells were drilled 30± feet; 10" ...
    Citation
  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4611
    P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high ...
    Citation