    P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
    Citation
  • 4387
    P12-201-4306 NA Klamath Project, OR-CA. Nearly completed Plant EE excavation to depth elev. ±50. Water in excavation is due to the power being off to east side wells, for approximately 30 hours; December ...
    Citation
  • 4388
    P12-201-4307 NA Klamath Project, OR-CA. Trimming of side walls at Plant EE to better expedite a ± 1 to 1½/1 slope; December 1976; USBR photo by D. J. Kline
    Citation
  • 4396
    P12-201-4315 NA Klamath Project, OR-CA. Dewatering well discharge PVC pipe broke at top of the well causing overnight flooding, with this result to Pumping Plant EE excavation; January 17, 1977; USBR photo ...
    Citation
  • 4398
    P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4399
    P12-201-4317 NA Klamath Project, OR-CA. Back view of construction bridge at Pumping Plant EE; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4400
    P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4401
    P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4402
    P12-201-4320 NA Klamath Project, OR-CA. Row 12, Line 1, piling split at a depth of approximately 47 feet, Plant EE; January 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4403
    P12-201-4321 NA Klamath Project, OR-CA. Pumping Plant EE - Setting batter piling butt into hammer lead; January 24, 1977; USBR photo by D. J. Kline
    Citation