You searched for: Start Over Land use history Remove constraint Land use history Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 4647
    P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
    Citation
  • 4231
    P-12-200-4149NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dike Created ...
    Citation
  • 4232
    P-12-200-4150NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. View of drain, ...
    Citation
  • 4233
    P-12-200-4151NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dragline dumping ...
    Citation
  • 4574
    P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4597
    P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
    Citation
  • 4641
    P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
    Citation
  • 4644
    P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
    Citation
  • 4646
    P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
    Citation
  • 4650
    P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...