Search

You searched for: Start Over Land use history Remove constraint Land use history Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 1455
    KP-1113-R2; Looking out across NW1/4. Section 2, T.46 N., R.4 E. Area near pumps used in draining the land; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1538
    KP-1194-R2 - Klamath Project. Region II. Another yard and a half of soil in Tulelake is dumped from a Bucyrus Erie dragline that is being used to construct a new drain to take care of the expanding agricultural ...
    Citation
  • 4390
    P12-201-4309 NA Klamath Project, OR-CA. Break in earth dike holding farm land flood water. Dike located on west side of KSD. Approx. 8 man hours and 2 hrs. of Case 580 time was used; January 17, 1977; ...
    Citation
  • 4. [Image] The Klamath Project
    341
    "Seventh draft"; Includes bibliographical references and index
    Citation
  • 1728
    KP-1382-R2 - Klamath Project. 1946 Land Opening. View of drained lands of Tule Lake, California, taken from approximately the same spot as KP-1381-R2 to show the contrast of the development of the years. ...
    Citation
  • 687
    June 11, 1905 ; Showing a glimpse of Lost River with irrigable lands on both sides of the river, proposed lands to be irrigated under the Klamath River Project. (Also a part of private companies cana...
    Citation
  • 369
    "October 1999"; Cover title
    Citation
  • 1858
    "November 2000."
    Citation
  • 1454
    KP-1112-R2; Tules have been burnt off. Looking southeast from north dike N-Canal, center of Section 11; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1457
    KP-1115-R2 - Klamath Project; The water is being drained off and the mud flats come into view. Section 35, T.47 N., R.4 E; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1452
    KP-1110-R2 - Klamath Project; Tulana Farms, the lessee of this land, has constructed a dike holding back Tule Lake waters and have burnt off the tules in preparation for cultivation. Looking south from ...
    Citation
  • 1540
    KP-1196-R2 - Klamath Project. Region II. Because of the great demand for food and consequent high prices that can be secured from the sale of produce, it is now possible to bring large areas of land into ...
    Citation
  • 3811
    P12-200-2804A Tule Lake Sump 2 - Klamath Project--Oregon-California. View northeast from point 1/2 mile south of Q-Canal headworks showing flooded lease lands. Water on lands at El. 4029.17; March 5, ...
    Citation
  • 5025
    CN-12-201-483NA Klamath Project - Oregon. Compare this to leased lands in photo CN-12-201-482NA [no photo available]; August 26, 1974; USBR photo by J. W. Legg
    Citation
  • 2036
    KP-1656-R2. Klamath Project; March 17, 1948; Photo by A. J. Burrows
    Citation
  • 3194
    KP-2321-R2 - Klamath Project--Butte Valley; April 29, 1956; Photo by Wesley Nell
    Citation
  • 2455
    KP-1938 - Klamath Project. Row of trees on left lies on USBR present right-of-way line. Cultivated land runs up to edge of bank on right side of river; March 29, 1950; Photo by Andrew M. Bergloff
    Citation
  • 2456
    KP-1939 - Klamath Project. J-Canal on left. Cultivated land on right side of channel. Picture taken at Sta. 73-50 looking downstream; March 29, 1950; Photo by Andrew M. Bergloff
    Citation
  • 19. [Image] Lower Klamath Lake
    3137
    KP-2276 - Klamath Project--Lower Klamath Lake. Viewed north from point directly west of outlet portal of Tule Lake Tunnel showing P-1 Lateral in right background and privately-owned farm lands; April 12, ...
    Citation
  • 3153
    KP-2282 - Klamath Project--Lower Klamath Lake. Viewed from northwest showing Klamath Straits Drain and Klamath Drainage District lands with Lower Klamath Lake in right background; April 12, 1956; Photo ...
    Citation
  • 3155
    KP-2284 - Klamath Project--Lower Klamath Lake. Viewed from just southwest White Lake, showing agricultural lands (Fish and Wildlife Service) in foreground, and Refuge Sumps 4, 6, and 7 in center; April ...
    Citation
  • 3156
    KP-2285 - Klamath Project--Tule Lake Division. Viewed from just north of Tule Lake Sump 1, showing sump with farm lands in foreground; April 12, 1956; Photo by Tom Horn
    Citation
  • 3157
    KP-2286 - Klamath Project--Tule Lake Division. Viewed from just west of Tulelake showing Tule Lake Sump 3, with farm lands in foreground and at left; April 12, 1956; Photo by Tom Horn
    Citation
  • 587
    The Klamath Project at 100: Conserving our Resources, Preserving our Heritage 1905- 2005: The First Century of Water for the Klamath Project Grain Truck, Lower Klamath Lake, 2004 Prepared by Dan Keppen, ...
    Citation
  • 1453
    KP-1111-R2 - Klamath Project; Tules have been burnt off preparatory to cultivation. Looking south from north dike N-Canal, north center of Section 11; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 3812
    P12-200-2805A Tule Lake Sump 2 - Klamath Project--Oregon-California. View east from point 1/2 mile south of Q-Canal headworks showing flooded lease lands; March 5, 1965; Bureau of Reclamation photo ...
    Citation
  • 9442
    "Reprinted May 2003."; Includes bibliographical references; Also available at http://eesc.oregonstate.edu/agcomwebfile/edmat/html/sr/sr1037/sr1037.html
    Citation
  • 3282
    KP-2398-R2 - Klamath Project - Lower Klamath Lake north bank of Lot 19 Lease Area "K". General view of north dike of lot 19 facing east showing headgates of pipe through dike. Shovel is on outlet of second ...
    Citation
  • 3283
    KP-2399-R2 - Klamath Project - Lower Klamath Lake north bank of lot 19 Lease Area "K". Close up view showing the threatened break at the turnout pipes placed by Dan O'Conner to provide water through the ...
    Citation
  • 1506
    KP-1165-R2 Klamath Project. Power companies (sic) transformer pole toppled over, dropping the transformers into the mud. Dewatering pumps were drowned out. Plant pumps and meters set in place but not ...
    Citation
  • 1511
    KP-1167-R2 Klamath Project - Klamath Straits Drain Outlet; Flood irrigation of the lands is in progress. View shows effects of a wind storm on power line due the the poor stability of earth in which ...
    Citation
  • 1537
    KP-1193-R2 - Klamath Project. Region II. Although Klamath Project has been operating for a long time, construction still goes on as the project is constantly enlarged and improved to take care of the ...
    Citation
  • 3797
    P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
    Citation
  • 3806
    P12-200-2800A Tule Lake Dike Repair - Klamath Project--Oregon-California. Fill about 2 1/2 feet. Lake W.S. El. 4035.20. Flooded lands in Sump 2 at right. Sierra Pacific Const. Co., Contractor - Specs. ...
    Citation
  • 3817
    P12-200-2811A Tule Lake Reserve Sump 2 - Klamath Project-Oregon-California. View near drainage Pumping Plant No. 9; showing depth of emergency flooding of lease lands. Straw on cross members shows highest ...
    Citation
  • 4317
    P-12-200-4235 NA Klamath Project, California-Oregon. This dam diverts water to serve lands in Langell Valley. It is an earth embankment with a concrete gate structure, 18 feet high and a crest length of ...
    Citation
  • 4324
    P-12-200-4242 NA Klamath Project, California-Oregon. Diversions at this dam are carried in "J" Canal to serve lands if the Tule Lake Division. It is a reinforced concrete slab and buttress type, 23 feet ...
    Citation
  • 4325
    P-12-200-4243 NA Klamath Project, Califorrnia-Oregon. The Dam is a concrete weir, removable crest, embankment wing type structure, with a height of 5 feet, and a crest length of 290 feet; September 29, ...
    Citation
  • 4332
    P-12-200-4251 NA Klamath Project, California-Oregon. This dam diverts water to serve lands in Langell Valley. It is an earth embankment with a concrete gate structure, 18 feet high and a crest length ...
    Citation
  • 4333
    P-12-200-4252 NA Klamath Project, California-Oregon. This dam diverts water to serve lands in Langell Valley. It is an earth embankment with a concrete gate structure, 18 feet high and a crest length ...
    Citation
  • 4334
    P-12-200-4253 NA Klamath Project, California-Oregon. This dam diverts water to serve lands in Langell Valley. It is an earth embankment with a concrete gate structure, 18 feet high and a crest length ...
    Citation
  • 4335
    P-12-200-4254 NA Klamath Project, California-Oregon. This dam diverts water to serve lands in Langell Valley. It is an earth embankment with a concrete gate structure, 18 feet high and a crest length ...
    Citation
  • 4345
    P-12-200-4264 NA Klamath Project, California-Oregon. This facility drains waters from the fish and wildlife refuge in California and agriculture wastewater from leased and private lands adjacent to the ...
    Citation
  • 4346
    P-12-200-4265 NA Klamath Project, California-Oregon. This facility drains waters from the fish and wildlife refuge in California and agriculture wastewater from leased and private lands adjacent to the ...
    Citation
  • 4347
    P-12-200-4266 NA Klamath Project, California-Oregon. This facility drains waters from the fish and wildlife refuge in California and agriculture wastewater from leased and private lands adjacent to the ...
    Citation
  • 4348
    P-12-200-4267 NA Klamath Project, California-Oregon. Diversions at this dam are carried in "J" Canal to serve lands of the Tule Lake Division. It is a reinforced concrete slab and buttress type, 23 feet ...
    Citation
  • 4349
    P-12-200-4268 NA Klamath Project, California-Oregon. Diversions at this dam are carried n "J" Canal to serve lands of the Tule Lake Division. It is a reinforced concrete slab and buttress type, 23 feet ...
    Citation
  • 4350
    P-12-200-4269 NA Klamath Project, California-Oregon. Diversions at this dam are carried in "J" Canal to serve lands of the Tule Lake Division. It is a reinforced concrete slab and buttress type, 23 feet ...
    Citation
  • 4351
    P-12-200-4270 NA Klamath Project, California-Oregon. Diversions at this dam are carried in "J" Canal to serve lands of the Tule Lake Division. It is a reinforced concrete slab and buttress type, 23 feet ...
    Citation
  • 4352
    P-12-200-4271 NA Klamath Project, Califorrnia-Oregon. The Dam is a concrete weir, removable crest, embankment wing type structure, with a height of 5 feet, and a crest length of 290 feet; June 23, 1978; ...
    Citation
  • 4353
    P-12-200-4272 NA Klamath Project, Califorrnia-Oregon. The Dam is a concrete weir, removable crest, embankment wing type structure, with a height of 5 feet, and a crest length of 290 feet; June 23, 1978; ...
    Citation
  • 4354
    P-12-200-4273 NA Klamath Project, Califorrnia-Oregon. The Dam is a concrete weir, removable crest, embankment wing type structure, with a height of 5 feet, and a crest length of 290 feet; June 23, 1978; ...
    Citation
  • 4355
    P-12-200-4274 NA Klamath Project, Califorrnia-Oregon. The Dam is a concrete weir, removable crest, embankment wing type structure, with a height of 5 feet, and a crest length of 290 feet; June 23, 1978; ...
    Citation
  • 4358
    P-12-200-4277 NA Klamath Project California-Oregon. (most adaptable are cereal grains, alfalfa hay, irrigated pastures and potatoes). A portion of the "J" Canal is seen on the right. Water diversions at ...
    Citation
  • 4931
    CN-12-201-384NA Klamath Project - Oregon-California. Tract 14 is a remnant tract of Bureau withdrawn land, on which the elevator was built in 1948, while it was leased to Clifford J. Shuck, who received ...
    Citation
  • 5029
    CN-12-201-484-NA Klamath Project - Oregon-California. 200 gallon tank, #1200 diaphragm pump with 7 H.P. motor. 25 foot 3-piece boom, with 6508 Tee Jets, required valves and 200'3/8" spray hose and needed ...
    Citation
  • 5048
    CN-12-201-505NA Klamath Project - Oregon-California; April 1975; USBR photo by D. W. Stein
    Citation
  • 2470
    KP-1951 - Klamath Project. Lower Lost River Channel Improvement. Picture shows condition of North Main Dike, also farm land which runs to edge of 40-B Drain; June 5, 1950; Photo by Andrew M. Bergloff...
    Citation
  • 5175
    CN-12-200-19A. Stock pond rehabilitated by the Bureau of Land Management during summer of 1968. This stock pond is located in the SE1/4SE14 of Sec. 26, T. 38 S., R. 13 E., W.M. The overall dimensions ...
    Citation
  • 5192
    CN-12-200-38A Klamath Project, Oregon-California. Photo shows old superstructure as designed for housing three indoor motor units and pumps nearly 30 years ago; June 20, 1967; Bureau of Reclamation ...
    Citation
  • 4132
    P-12-200-4019 NA Klamath Project, California-Oregon. The Klamath Project plan includes the construction of facilities to divert and distribute water for irrigation of basin lands, including the reclamation ...
    Citation
  • 4133
    P-12-200-4020 NA Klamath Project, California-Oregon. The Klamath Project plan includes the construction of facilities to divert and distribute water for irrigation of basin lands, including the reclamation ...
    Citation
  • 4135
    P-12-200-4022 NA Klamath Project, California-Oregon. This dam diverts water to serve lands in Langell Valley. It is an earth embankment with a concrete gate structure, 18 feet high and a crest length ...
    Citation
  • 3139
    KP-2278 - Klamath Project--Lower Klamath Lake. Viewed to the northeast from northern tip of "Big Tableland" showing Lower Klamath Wildlife Refuge Sumps 6 and 12 in center left and center right, respectively, ...
    Citation
  • 3154
    KP-2283 - Klamath Project--Lower Klamath Lake. Viewed from just north of Oregon-California border showing agricultural lands share-cropped for Fish and Wildlife Service at near left, the Wildlife Refuge ...
    Citation
  • 4359
    P-12-200-4278 NA Klamath Project California-Oregon. (most adaptable are cereal grains, alfalfa hay, irrigated pastures and potatoes). A portion of the "J" Canal is seen on the right. Water diversions at ...
    Citation
  • 4383
    P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
    Citation
  • 4501
    P12-201-4419 NA Klamath Project, OR-CA. Flooding of Horsley land northwest of Plants E and EE. Dike built by rancher west of Plant EE. High water due to rancher flooding his field for quackgrass control. ...
    Citation
  • 4990
    CN-12-201-445NA Klamath Project - Oregon-California; October 1971; USBR photo by J. W. Legg
    Citation
  • 4991
    CN-12-201-446NA Klamath Project - Oregon-California; October 1971; USBR photo by J. W. Legg
    Citation
  • 4994
    CN-12-201-449NA Klamath Project - Oregon-California; September 1971; USBR photo by J. W. Legg
    Citation
  • 13291
    The paper discusses the changes in the hydrology and water use in the Klamath River Watershed and the Lower Klamath Lake prior to and after the Klamath Reclamation Project. Vegetation and soil conditions ...
    Citation
  • 3199
    KP-2326-R2 - Klamath Project--CLEAR LAKE RESERVOIR. Propeller-driven Marsh Boat (on trailer) used for trips over otherwise impassible roads to Clear Lake recorder station; February - March 1956; Photo ...
    Citation
  • 3293
    KP-2406-R2 - CLEAR LAKE - Klamath Project. Dave Bunger is sighting two buoys with a sextant. At least 3 located points are used for a fix on the map; October 16, 1957; Photo by K. J. Greene
    Citation
  • 3321
    KP-2434-R2 - ENTERPRISE POWER PLANT - Klamath Project. Placing compacted earth fill on west side of forebay using Barco gas operated tampers; March 15, 1958; Photo by K. J. Greene
    Citation
  • 3322
    KP-2435-R2 - ENTERPRISE POWER PLANT - Klamath Project. The forced air fuel oil heater used for concrete protection is shown in foreground; March 11, 1958; Photo by K. J. Greene
    Citation
  • 1884
    KP-1531-Klamath Project. Tests show 100% compaction for this section - 6" slide rule used for comparison; August 29, 1947; Photo by Dorwin Grise
    Citation
  • 1888
    KP-1535-R2 - Klamath Project. Six-inch slide and folding rules used for comparison; August 29, 1947; Photo by Dorwin Grise; The slide-rule case bears the photographer's last name and initials: "D.E.Gri...
    Citation
  • 1465
    KP-1123-R2 - Klamath Project; The chemical is distributed uniformly in the water by the use of a small pressure pump and a number of nozzles; July 12, 1945; Photo by C. O. Wamstad
    Citation
  • 3574
    KP-2558-R2-Klamath Project - TULE LAKE DIVISION, Sump 2. 33-foot house trailer used as mobile field office and laboratory. Location is above the road, near Station 77+00 of the Q-Canal; August 25, 1960; ...
    Citation
  • 81. [Image] Pumping Plant "S"
    2853
    KP-2141-R2 - Klamath Project. Pumping Plant "S". Bottom of excavation for corrugated metal pipe wells and foundation slab. Piling and rock base being used for foundation due to extremely soft wet foundation ...
    Citation
  • 5216
    CN-12-200-63A Klamath Project, Oregon-California. View of some of the equipment used during the core drilling operation; October 1969; Bureau of Reclamation photo by C.D.Lawrence
    Citation
  • 2989
    KP-2190-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Flat-iron roller which has five 18" X 16" airplane tires. Used in compacting earth lining; April 13, 1953; Bureau of Reclamation Photo ...
    Citation
  • 3058
    KP-2207-R2 - Lower Cost Canal Lining - A-3 Lateral. Klamath Project. Using up the short pieces; April 15, 1953; Bureau of Reclamation Photo by Mark D. Taylor, Jr.
    Citation
  • 5111
    CN-12-201-571NA Klamath Project – California. Also, showing burned area, where considerable wildlife habitat was destroyed by careless burning; May 1975; USBR photo by J. W. Legg
    Citation
  • 1519
    KP-1175-R2 Klamath Project; The outlet is to be used temporarily until such time a new structure is constructed. Note: Erosion of the dike on the left showing anticipated effect of use of the outlet ...
    Citation
  • 4586
    P12-201-4504 NA Klamath Project, OR-CA. Center Canal Flume -- Repaired joint shown in previous photos. Used a 6" neoprene waterstop and a 3 part PRC sealer. Also drilled 3/4" anchors on 6" alternating ...
    Citation
  • 4647
    P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
    Citation
  • 4685
    P12-201-4603NA Klamath Project, OR-CA. S-16 Drain -- Pump used for dewatering S-16 is a rental QP Model 401 4" pump. This was used for one week only; April 20, 1979; USBR photo by D.J. Kline
    Citation
  • 4813
    CN-12-201-263NA Klamath Project - Oregon-California. Overall view of borrow pit used by the contractor for road base material. Pit is also used by Modoc County under a USBR license; March 1973; Bureau ...
    Citation
  • 4820
    CN-12-201-271NA Klamath Project - Oregon-California. View of Bridge over “N” Canal, looking east. This bridge was used for hauling road material. Note 6-inch by 24-inch timbers that were used to reinforce ...
    Citation
  • 4841
    CN-12-201-291NA Klamath Project - Oregon-California. Experimental Line in Unit 71. View of fiberglass membrane covered tubing being fed into hopper unit behind trenching machine. Installation methods were ...
    Citation
  • 4854
    CN-12-201-307NA Klamath Project - Oregon-California. High pressure pump (200 psi, 5 gpm) used in cleaning up­stream face of the dam. Pressure used was 800 psi; November 1973; Bureau of Reclamation photo ...
    Citation
  • 4918
    CN-12-201-371NA Klamath Project - Oregon-California. (Thompson Construction Company, Roseburg, Oregon, Sub-Contractor) Sub-Contractor Thompson, preparing base for the area that will be used to stockpile ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 4468
    P12-201-4386 NA Klamath Project, OR-CA. Laborers working on compacted backfill on east side of Pumping Plant EE. Wackers were used on 6" lifts along sides close to structure. Five ton vibratory roller ...
    Citation
  • 4474
    P12-201-4392 NA Klamath Project, OR-CA. Center Canal Flume--View of flume repairs. 24" CMP for supplying irrig. water to ranchers while allowing work inside flume. Nine 1-inch temporary flume tie rods ...
    Citation
  • 2830
    KP-2117-R2. Jack Wynant, ditchrider, receiving incentive award check from R. S. Hopkins, Irrigation Manager, Klamath Project, for the use of water on saw in cutting rolled asphalt material; April 9, 1952; ...
    Citation
  • 3443
    P12-200-2738 - Klamath Project - EXTENSION DEDICATION AT STUKEL PUMPING PLANT. Part of crowd of local people at afternoon dedication--several hundred attended evening banquet at Country Club; August 9, ...
    Citation
  • 1440
    KP-1098-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Excavation on the construction of the lateral is proceeding by use of an Osgood dragline. The west bank seen in the left of the picture ...
    Citation