Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 101 - 110 of 217 | Next »
Search Results
-
101. [Image] TULE LAKE SUMP 3 - 101-C Drain
P12-200-2681 - Klamath Project, California - TULE LAKE SUMP 3 - 101-C Drain. View of equipment putting aqualine herbicide in drain to kill moss. Forty parts per million were used and was effective; July ...Citation -
102. [Image] TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral
C12-200-2706 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. Recently-discovered crack in bottom of N-1 Lateral. View looking upstream near Sta. 102. Lateral was in use during ...Citation -
103. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner ...Citation -
104. [Image] TULE LAKE SUMP - Sump sounding
KP-2416-R2 - TULE LAKE SUMP - Klamath Project. Sump was sounded to determine elevation of bottom for planning studies. Airboat rented from Fish and Wildlife Service, was used due to shallow depth. Burt ...Citation -
105. [Image] TULE LAKE SUMP - Sump sounding job
KP-2417-R2 - TULE LAKE SUMP - Klamath Project. Lynn Skeen at triangulation station operating plane table on which sounding courses have been plotted. When air boat stopped to make sounding a flag was waved ...Citation -
106. [Image] "M" Canal Lining, Station 131, looking Northeast, placing a concrete lining with completed panels on each side
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...Citation -
107. [Image] "M" Canal Lining, Station 131, looking Northeast - Placing concrete lining with completed panels on each side
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
108. [Image] "M" Canal Lining, Station 131, looking Northeast - Placing concrete lining with completed panels on each side
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
Citation -
110. [Image] Klamath Straits Drain Outlet
KP-1135-R2 - Klamath Project; Concrete mixing plant of the Tru-Mix Concrete Company at Pumping Plant "E", showing aggregate bins, batching hopper, mixer and the pumpcrets machine used for the delivery ...Citation