You searched for: Start Over Land use history Remove constraint Land use history Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 3797
    P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
    Citation
  • 2. [Image] Pumping Plant "S"
    2853
    KP-2141-R2 - Klamath Project. Pumping Plant "S". Bottom of excavation for corrugated metal pipe wells and foundation slab. Piling and rock base being used for foundation due to extremely soft wet foundation ...
    Citation
  • 4647
    P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
    Citation
  • 1853
    KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
    Citation
  • 1854
    KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1855
    KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1864
    KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
    Citation
  • 3800
    P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...
    Citation
  • 3639
    KP-2573-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. 4-inch diameter aluminum pipe sprinkler system being used to sprinkle borrow areas adjacent to R-Canal, Station ...
    Citation
  • 4214
    P-12-200-4132NA Klamath Project - Oregon-California. View of Cat 966-B front end loader used to excavate topsoil. Pile, right center, was placed by loader; December 1975; USBR photo by R. J. Hamilto...