  • 4544
    P12-201-4462 NA Klamath Project, OR-CA. PP EE PP&L work on new elevated transformer assembly. Note: The bow in center of aluminum frame holding up transformers; October 1977; USBR photo by D.J. Kline. ...
    Citation
  • 4545
    P12-201-4463 NA Klamath Project, OR-CA. Center Canal Flume--view looking east. Placement of rip rap on east bank of drain under flume; October 1977; USBR photo by D.J. Kline
    Citation
  • 4546
    P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
    Citation
  • 4547
    P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
    Citation
  • 4548
    P12-201-4466 NA Klamath Project, OR-CA. PP FF--View looking south at placement of compacted back fill about the discharge pipes between FF and its outlet structure; October 1977; USBR photo by D.W. S...
    Citation
  • 4549
    P12-201-4467 NA Klamath Project, OR-CA. Ady Canal--west end of excavation for siphon inlet transition. Depth is approx. 2.0 ft below subgrade. Note: Free water being pumped out by small 3/" electric ...
    Citation
  • 4550
    P12-201-4468 NA Klamath Project, OR-CA. Ady Canal--view looking SE at siphon inlet transition. View shows RE-Steel for slab area is about all in place and tied; October 1977; USBR photo by D.W. Stein ...
    Citation
  • 4551
    P12-201-4469 NA Klamath Project, OR-CA. Ady Canal--view looking east at siphon inlet transition slab area. Concrete has just been placed for slab area and is in process of being covered, for cold weather ...
    Citation
  • 4552
    P12-201-4470 NA Klamath Project, OR-CA. Placing concrete in walls of outlet structure of FF. Concrete being pumped into forms by E Con Pacer and vibrated by electric vibrator.--PP FF; October 1977; ...
    Citation
  • 4553
    P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
    Citation