Search Results

  • 3510
    KP-2497-R2 - Klamath Project - PUMPING PLANT "U", Tulelake Irrigation District. Completed Pumping Plant with one 10 c.f.s. vertical pumping unit; March 11, 1959; Photo by L. McAnulty
    Citation
  • 3511
    KP-2498-R2- Klamath Project - PUMPING PLANT "V", Tulelake Irrigation District. Completed Pumping Plant with two 10 c.f.s. vertical pumping units; March 11, 1959; Photo by L. McAnulty
    Citation
  • 3512
    KP-2499-R2- Klamath Project - PUMPING PLANT "V", Tulelake Irrigation District. View looking across 100-D-1 drain to pumping plant constructed under Specifications 200C-393. Outlet box is near automobile; ...
    Citation
  • 3524
    KP-2511-R2-Klamath Project -- Tule Lake Sump 2, Pumping Plant 9. Tule Lake Irrigation District removes old structure at pumping plant site. This structure was floated on oil barrels and end was anchored ...
    Citation
  • 3665
    KP-2593-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "W". View looking southwest into inlet channel of Pumping Plant "W". Plant is irrigating the southwest corner ...
    Citation
  • 4269
    P-12-200-4187NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
    Citation
  • 4375
    P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4385
    P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
    Citation