Search

Search Results

  • 5128
    CN-12-201-588NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22-B dragline used to move drilling platform from place to place on downstream face of dam. Dragline was borrowed from Fish and ...
    Citation
  • 5133
    CN-12-201-593NA Klamath Project - Oregon-California. View of dragline, compressor and drilling platform; October 1969; USBR photo by C. D. Lawrence
    Citation
  • 3800
    P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...
    Citation
  • 5132
    CN-12-201-592NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22=B dragline used to lift drilling platform; October 1969; USBR photo by C. D. Lawrence
    Citation
  • 3801
    P12-200-2794A Klamath River - Klamath Project--Oregon. Trench is to drain overburden to facilitate excavation; March 3, 1965; Bureau of Reclamation photo by C. D. Lawrence
    Citation
  • 3805
    P12-200-2798A Klamath River - Klamath Project--Oregon. View north shows dozer and dragline excavation in unusual section just downstream from axis of existing dike and dam--the only section not requiring ...
    Citation
  • 3985
    P-12-200-2972, 2973, 2974, 2975 and 2976 - Klamath Project Oregon-California. (Caption for the above photos same as P-12-200-2971); April 1974; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3986
    P-12-200-2972, 2973, 2974, 2975 and 2976 - Klamath Project Oregon-California. (Caption for the above photos same as P-12-200-2971); April 1974; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4015
    P-12-200-3003NA Klamath Project - Oregon-California. View of spillway looking west. The dragline shown was utilized to place the concrete used in the spillway slabs; May 1974; Bureau of Reclamation photo ...
    Citation
  • 4016
    P-12-200-3004NA Klamath Project - Oregon-California. Photo showing sub-contractor placing concrete along spillway crest section between Sta. 1+00 and Sta. 1+30. Concrete was mixed in mixer truck and placed ...
    Citation