  • 3964
    P-12-200-2952NA Klamath Project - Oregon-California. View shows dumping concrete from a 7 cubic yard White mixer truck into a 1 cubic yard bucket. Mr. Don Thompson, sub-contractor, is standing beside ...
    Citation
  • 3972
    P-12-200-2960NA Klamath Project - Oregon-California. Contractor's dry batch plant. View showing 7 cubic yard Rex mixer truck being loaded with sand and aggregate; April 1974; Bureau of Reclamation photo ...
    Citation
  • 3973
    P-12-200-2961NA Klamath Project - Oregon-California. View of dry batch plant. Three cubic yard front end loader in the process of filling the hopper with sand and aggregate. Note the scale dial on left ...
    Citation
  • 4016
    P-12-200-3004NA Klamath Project - Oregon-California. Photo showing sub-contractor placing concrete along spillway crest section between Sta. 1+00 and Sta. 1+30. Concrete was mixed in mixer truck and placed ...
    Citation
  • 4060
    P-12-200-3047NA Klamath Project - Oregon-California. View of 977-K Loader filling 10 cubic yard Ford end-dump truck with backfill material. The backfill material will be placed behind the end walls; ...
    Citation
  • 4063
    P-12-200-3050NA Klamath Project - Oregon-California. View of right wall. 10 cubic yard end dump truck unloading load of backfill material; June 1974; USBR photo by D. W. Stein