Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Construction workers Remove constraint Subject: Construction workers Subject Irrigation projects Remove constraint Subject: Irrigation projects Subject Tule Lake Sump (California) Remove constraint Subject: Tule Lake Sump (California)

Search Results

  • 3583
    KP-2567-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Installing prefabricated metal farm turnout at Station 9+50, Q-Canal metal diaphragm in background; October 18, ...
    Citation
  • 3659
    KP-2587-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. View showing workmen compacting backfill about 24-inch metal turnout at Sta.40+65; March 24, 1961; Photo by ...
    Citation
  • 3542
    KP-2526-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking north showing driving of sheet piling for structure. Sheet piling in background was driven by contractor to protect excavation; ...
    Citation
  • 3306
    KP-2419-R2 - TULE LAKE SUMP 3 - Klamath Project. Experimental drainage program in League of Nations lease tract. View of temporary drainage pump installation. CMP pump chamber, which is supported on piling ...
    Citation
  • 3887
    P12-200-2876A Tule Lake Area - Sump 3 - Klamath Project - California. Baumgardner Excavating. Specs. No. 200C-778; November 1969; Bureau of Reclamation photo by J. B. Marcotte, Jr.
    Citation
  • 3891
    P12-200-2880A Tule Lake Area - Sump 3 - Klamath Project - California. Baumgardner Excavating. Specs. No. 200C-778; November 1969; Bureau of Reclamation photo by J. B. Marcotte, Jr.
    Citation
  • 3915
    P12-200-2904NA Klamath Project - Oregon-California. Overall view of pipe laying operation. Dump truck is almost empty. Fields are covered with snow; December 1972; Bureau of Reclamation photo by D. ...
    Citation
  • 3916
    P12-200-2905NA Klamath Project - Oregon-California. View of pipe laying operation; December 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3920
    P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
    Citation
  • 3921
    P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
    Citation