You searched for: Start Over Irrigation Remove constraint Irrigation Subject Center Canal (Oregon) Remove constraint Subject: Center Canal (Oregon) Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 4627
    P12-201-4545NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from south side of flume where the bridge crosses, looking to the NW of flume inlet. Note water surface and disturbance on ...
    Citation
  • 4628
    P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
    Citation
  • 4629
    P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
    Citation
  • 4630
    P12-201-4548NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from north looking south of flume bridge area. An apparent slip fault was noted where shovel is standing between flume north ...
    Citation
  • 4631
    P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
    Citation
  • 4632
    P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
    Citation
  • 4633
    P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
    Citation
  • 4641
    P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
    Citation
  • 4642
    P12-201-4560NA Klamath Project, OR-CA. Center Canal Flume Bridge. Two holes precut into steel sleeve on one side only, prior to pile fitting; April 4, 1978; USBR photo by D.J. Kline
    Citation
  • 4643
    P12-201-4561NA Klamath Project, OR-CA. Center Canal Flume Bridge. Flume Bridge south abutment. Original driven pile trimmed and ready to receive steel splice sleeve; April 4, 1978; USBR photo by D.J. ...
    Citation