Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Bridges Remove constraint Subject: Bridges Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction

Search Results

  • 4618
    P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
    Citation
  • 4619
    P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
    Citation
  • 4622
    P12-201-4540NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water flowing from base of the left retaining wall at Plant E. Flow was a by-product of jetting operations for Plant E west ...
    Citation
  • 4623
    P12-201-4541NA Klamath Project, OR-CA. Plant E. Outlet Transition Bridge -- View of Gorman-Rupp jetting pump imported by contractor. Note the undersized intake and exhaust fittings; March 20, 1978; USBR ...
    Citation
  • 4624
    P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
    Citation
  • 4625
    P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
    Citation
  • 4635
    P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
    Citation
  • 4636
    P12-201-4554NA Klamath Project, OR-CA. Pumping Plant E Bridge. Note that hillman rollers pivot for the turn under full load and with load stationary; April 1978; USBR photo by D.J. Kline
    Citation
  • 4637
    P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR ...
    Citation
  • 4638
    P12-201-4556NA Klamath Project, OR-CA. Pumping Plant E Bridge. Tow line is hooked up to HD-5 cat to provide momentum to bridge section across main traverse; April 1978; USBR photo by D.J. Kline
    Citation