71. [Image] Lost River Channel Improvement, Langell Valley
KP-2164-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Looking upstream along west bank from Station 246+00, showing draglines excavating channel. Old drain can be seen behind draglines. ...Citation -
72. [Image] Lost River Channel Improvement, Langell Valley
KP-2165-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view looking upstream from Station 223+50. Picture shows old existing spoil banks and drain. McKinnon Construction ...Citation -
73. [Image] Southwest Sump Dikes
2179-R2 - Southwest Sump Dikes. Klamath Project, Oregon-California. Station 44 looking north. Unfinished back slope which was wetter material placed direct from toe drain to dragline 38-B. Top portion ...Citation -
74. [Image] Link River Dam
KP-2188-R2 - Klamath Project. Link River Dam. River Outlet Stilling Basin. General view of diffuser blocks. Personnel from The California-Oregon Power Company are: Gilbert W. Fleet, Ass't Supt., Marion ...Citation -
75. [Image] Lower Cost Canal Lining, Klamath Project
KP-2194-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking upstream from Sta. 137+50. 18-ft. Bottom; two 6-inch layers in place; March 29, 1953; Bureau of Reclamation ...Citation -
76. [Image] KP-2196-R2--Lower Cost Canal Lining
KP-2196-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. Bottom of ditch, after standing from fall until spring, opened up for compacted earth lining. Discing to mix top, dry material with ...Citation -
77. [Image] Lower Cost Canal Lining
KP-2198-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. P&H 255, 3/4-Yd. Dragline shaping up bank of lateral. Compacted earth lining in immediate foreground. Other bank has been completed ...Citation -
78. [Image] Lower Cost Canal Lining
KP-2191-R2--Lower Cost Canal Lining. Klamath Project. Sta. 150+00. M-2-a Lateral. D-8 Cat with dozer moving bank material from outer storage pile into compacted bank section; April 13, 1953; Bureau of ...Citation