Search
Search Results
-
Title covers: May 1, 1903 to December 31, 1912 in a single issue; Dates of the beginning year(s) of publication are derived from the 1903 to December 31, 1912, History of the Klamath Project and from ...
Citation Citation
- Title:
- History of the Klamath Project, Oregon-California 1912
- Author:
- United States. Bureau of Reclamation
- Year:
- 1912, 2008, 2004
Title covers: May 1, 1903 to December 31, 1912 in a single issue; Dates of the beginning year(s) of publication are derived from the 1903 to December 31, 1912, History of the Klamath Project and from the volume information on later volumes (v. 35) Klamath District and Klamath Project Annual history for 1945, dated March 1, 1946
-
2. [Image] Annual project history and O. & M. report of the Klamath Project, Oregon-California, 1931
Information Of Interest Source of water supply: Upper Klamath Lake, Lost River and Clear Lake. Area of drainage basin: 3,700 square miles. Length of irrigation season: From April 15 to September ...Citation Citation
- Title:
- Annual project history and O. & M. report of the Klamath Project, Oregon-California, 1931
- Author:
- United States. Bureau of Reclamation
- Year:
- 1931, 2008, 2006
Information Of Interest Source of water supply: Upper Klamath Lake, Lost River and Clear Lake. Area of drainage basin: 3,700 square miles. Length of irrigation season: From April 15 to September 30 - 168 days. Average elevation of irrigable area: 4,100 feet above sea level. Average annual rainfall on irrigable area: 12.7 inches. Average of recorded temperatures, 12 years: highest 97, lowest -4 F Character of soil of irragable area: Disintegrated basalt, volcanic ash, and diatomaceous eart, being largely classifid as Yakima sandy loam. Principal products: Alfalfa, hay, grain and vegetables; stock,poultry, and dairy products. Principa; markets: Portland Oregon; Sacramento and San Francisco, Ca. Limit of area of farm units: 160 acres. The irrigation plan of the Klamath Project provides for the storage of water in Upper Klamath Lake, lying just North of Klamath Falls, Oregon, and in Clear Lake Reservoir, California, at the head of Lost River. Water for lands in Langell Valley and in the vicinity of Bonanza will be supplied from Clear Lake Reservoir and from Gerber Reservoir. Water for all other lands will be supplied from Klamath Lake. Water is diverted from the outlet of Upper Klamath Lake just above the Link River Dam, into the "A" Canal which extends nine miles in a southeasterly direction, and supplies the canals on both sides of Lost River. Water for the Tule Lake lands, which are served by the "J" Canal, is discharged into Lost River from the C-G Canal and from this point to the diversion dam two miles southeast of Merrill; Lost River being used as a carrier. At the diversion dam, the water is diverted into the "J" Canal. One of the principal features of the Klamath Project is the reclamation of the lands in the bed of Tule Lake. These lands are being reclaimed in a double sense: first, by causing the waater recede and, second, by constructing irrigation works to irrigate the lands uncovered. The lowering of the water surface in Tule Lake is being brought about by evaporation from the lake itself and by preventing inflow. The works designed to prevent inflow consists of Clear Lake Reservaoir, and the Lost River diversion canal. Clear Lake Reservoir is located at the head of Lost River and stops the flood waters coming in from abouve. Flood waters coming in Lost River below Clear Lake are diverted from Lost River int the Klamath River through the diversion canal. The works designed to provede irrigation service for the uncovered lands consist of a diversion dam on Lost River tow miles southeast of Merrill, the "J" Canal and lateral system. The Keno Canal has been constructed on the West side of Link River and extends from the Link River Dam to a point about one mile below; the river in this distance makes a drop of about 50 feet. The Keno Canal was designed to develop power and to supply water for irrigation to lands on the west of Klamath River, also, to the marsh lands around Lower Klamath Lake. Irrigation from the Keno Canal has now been abandoned and the United States has installed no power plant. The Keno Canal has been leased to the California-Oregon Power Company. The Pricipal features of the project are the Clear Lake Reservoir, the Gerber Reservoir, the Link River Dam, the Main "A" Canal with a tunnel 3300 feet long, the precast concrete flume 4300 feet long on the "C" Canal, the di2 diversion dams on the Lost River, the Lost River pipe lines on the C-G Canal and the main canals and laterals and 128 miles of open drains. Irrigation service may now be provided for about 101,000 acres or irrigable land.
-
INTRODUCTION AND GENERAL General Description of the Project Location. The Klamath Project is in the Upper Klamath River Basin, east of the Cascade Range. It is located in Klamath County, Oregon, and ...
Citation Citation
- Title:
- Annual project history: Klamath Project, Oregon-California, 1957
- Author:
- United States. Bureau of Reclamation
- Year:
- 1957, 2008, 2006
INTRODUCTION AND GENERAL General Description of the Project Location. The Klamath Project is in the Upper Klamath River Basin, east of the Cascade Range. It is located in Klamath County, Oregon, and in Modoc and Siskiyou Counties of California. Project headquarters is located at the principal city of Klamath Falls, Oregon, which has a population of about 35>700, including suburbs. Smaller towns on the project in Oregon are Merrill, Malin, and Bonanza. The town of Tulelake, California, was established in 1931 near the center of the Tule Lake Division. Climate. The mean temperature for the wannest month is 630 F. The coldest month has mean temperature of 29? F. Summer nights are cool. The annual rainfall is about 13 inches, of which about 3?-inches fall during the growing season of 90 to 130 days. Topography, soils, and crops. The project area is about ^-,100 feet elevation above sea level. The surface topography is generally smooth and flat for the large areas of lake bottom, and gently sloping on the higher lands. Peat and muck soils are common in the recent lake bottoms. Soils vary from sandy loam to clay on other parts of the project. The principal crops grown are alfalfa, malting and feed barley, potatoes, clover seed, and irrigated pasture and other forage. Stock raising is an important enterprise. Industry and transportation. Farming and lumbering each provide the major portion of the economy of the Basin. Three major railroad lines, one major highway and many secondary highways, and two airlines serve the project area. Plan and purpose. The project serves 211,000 acres. The water supply is provided by two main water courses, Klamath River and Lost River and their tributaries. Besides storing, diverting, and distributing water for irrigation, project facilities have reclaimed by drainage large areas formerly inundated by Lower Klamath and Tule Lakes* Flood waters of Lost River, which terminates in Tule Lake, are diverted to the Klamath River through the Lost River Diversion Channel. This channel is also used to carry irrigation water in the opposite direction in the summertime. Another principal function of the project is water-level control for the Tule Lake and Lower Klamath Lake National Wildlife Refuges. Upper Klamath Lake on the Klamath River is the principal storage reservoir, having an active capacity of 52U,800 acre-feet. It is controlled by Link River Dam constructed, maintained, and operated INTRODUCTION AND GENERAL (Continued) General Description of the Project (Cont.) by The California Oregon Power Company under an agreement with the project whereby irrigation requirements and rights are protected. The Main, Lower Klamath, and Tule Lake Divisions are served from this source, Gerber Reservoir on Miller Creek and Clear Lake Reservoir on Lost River provide flood control for the Tule Lake Division and an irrigation supply for the Langell Valley Division. Their active storage capacities are 9*^300 acre-feet and 513*300 acre-feet, respectively. Federally-financed project works also include the diversion, distribution, and drainage systems for the Main and Tule Lake Divisions; the diversion dam and main canals for the Langell Valley Division; and drainage outlets for the Lower Klamath and Tule Lake Divisions.
-
INTRODUCTION AND GENERAL Genex*al Description of the Project Location. The Klamath Project is in the Upper Klamath River Basin, east of the Cascade Range. It is located in Klamath Comity, Oregon, ...
Citation Citation
- Title:
- Annual project history: Klamath Project, Oregon-California, 1958
- Author:
- United States. Bureau of Reclamation
- Year:
- 1958, 2008, 2006
INTRODUCTION AND GENERAL Genex*al Description of the Project Location. The Klamath Project is in the Upper Klamath River Basin, east of the Cascade Range. It is located in Klamath Comity, Oregon, and in Modoc and Siskiyou Counties of California. Project headquarters is located at the principal city of Klamath Falls, Oregon, which has a population of about 3&>^00, including suburbs. Smaller towns on the project in Oregon are Merrill, Malin, and Bonanza. The town of Tulelake, California, was established in 1931 near the center of the Tule Lake Division. Climate ? The mean temperature for the warmest month is 630 F. The coldest month has raez.n temperature of 29? F. Summer nights are cool. The annual rainfall is about 13 inches, of which about 3^ inches fall during the growing season of 90 to 130 days. Topography, soils, and crops. The project area is about U,100 feet elevation above sea level. The surface topography is generally smooth and flat for the large areas of lake bottom, and gently sloping on the higher lands? Peat and muck soils are common in the recent lake bottoms. Soils vary from sandy loam to clay on other parts of the project. The principal crops grown are alfalfa, malting and feed barley, potatoes, clover seed, and irrigated pasture and other forage. Stock raising is an important enterprise. Industry and transportation. Farming and lumbering each provide the major portion of the economy of the Basin. Three major railroad lines, one major highway and many secondary highways, and two airlines serve the project area. Plan and purpose. In 1958 the project provided irrigation service to 21^,500 acres. The water supply is provided by two main water courses, Klamath River and Lost River and their tributaries. Besides storing, diverting, and distributing water for irrigation, project facilities have reclaimed by drainage large areas formerly inundated by Lower Klamath and Tule Lakes. Flood waters of Lost River, which terminates In Tule Lake, are diverted to the Klamath River through the Lost River Diversion Channel. This channel is also used to carry irrigation water in the opposite direction in the summertime. Another principal function of the project is water-level control for the Tule Lake and Lower Klamath Lake National Wildlife Refuges. DTERODUCTIOH AND GBNKRAL (Continued) General Description of the Project (Cont.) Upper Klamath Lake on the Klamath River is the principal storage reservoir, having an active capacity of 52^,800 acre-feet. It is controlled by Link River Dam constructed, maintained, and operated by The California Oregon Power Company under an agreement with the project whereby irrigation requirements and rights are protected. The Main, Lower Klamath, and Tule Lake Divisions are served from this source. Gerber Reservoir on Miller Creel; and Clear Lake Reservoir on Lost River provide flood control for the Tule Lake Division and an irrigation supply for the Langell Valley Division. Their active storage capacities are 9*b3OO acre-feet and 513*300 acre-feet, respectively. Federally-financed project works also include the diversion, distribution, and drainage systems for the Main and Tule Lake Divisions; the diversion darn and main canals for the Langell Valley Division; and drainage outlets for the Lower Klamath and Tule Lake Divisions?
-
Ill., maps (some color), photographs; Includes organization of Klamath District with official correspondence and description of the Klamath project, an organization chart, fiscal year financials, photographs, ...
Citation Citation
- Title:
- Klamath District and Klamath Project annual history, 1946
- Author:
- United States. Bureau of Reclamation
- Year:
- 1946, 2008, 2006
Ill., maps (some color), photographs; Includes organization of Klamath District with official correspondence and description of the Klamath project, an organization chart, fiscal year financials, photographs, maps, charts and tables of crop and livestock yields and water storage and distribution, etc.; Includes index; Title covers: calendar years for 1946-1948; Description is based on: Klamath District and Klamath Project Annual History for 1946; Dates of the beginning year(s) of publication are derived from the May 1, 1903 to December 31, 1912, History of the Klamath Project and from the volume information on later volumes (v. 35) Klamath District and Klamath Project Annual history for 1945, dated December 1, 1946
-
Ill., maps (some color), photographs; Includes organization of Klamath District with official correspondence and description of the Klamath project, an organization chart, fiscal year financials, photographs, ...
Citation Citation
- Title:
- Klamath District and Klamath Project annual history, 1947
- Author:
- United States. Bureau of Reclamation
- Year:
- 1947, 2008, 2004
Ill., maps (some color), photographs; Includes organization of Klamath District with official correspondence and description of the Klamath project, an organization chart, fiscal year financials, photographs, maps, charts and tables of crop and livestock yields and water storage and distribution, etc.; Includes index; Title covers: calendar years for 1946-1948; Description is based on: Klamath District and Klamath Project Annual History for 1946; Dates of the beginning year(s) of publication are derived from the May 1, 1903 to December 31, 1912, History of the Klamath Project and from the volume information on later volumes (v. 35) Klamath District and Klamath Project Annual history for 1945, dated December 1, 1946
-
UNITED STATES DEPAXTMENT OF. THE INTERIOR BUREAU OF RECLAMATION Washington, D. C. Public Notice No. I45 October 8, 1947 KLAMATH PROJECT, OREMN - CALIFORNIA PAXT 2- TLILE LAKE DIVISION PUBLIC NOTICE ...
Citation Citation
- Title:
- Public notice opening public lands to entry and announcing availability of water therefor : Public notice no. 45, October 8, 1947, Klamath Project Oregon-California, Part 2 - Tule Lake Division
- Author:
- United States. Bureau of Reclamation
- Year:
- 1947, 2005, 2004
UNITED STATES DEPAXTMENT OF. THE INTERIOR BUREAU OF RECLAMATION Washington, D. C. Public Notice No. I45 October 8, 1947 KLAMATH PROJECT, OREMN - CALIFORNIA PAXT 2- TLILE LAKE DIVISION PUBLIC NOTICE OPENING PUBLIC LANDS TO ENTRY AND ANNOUNCING AVAILABILITY OF WATER THRWOR 1. Public land for vhich water i s available and for + ich entry may be made.-- In pursuance of the Act of June 17, 1902 ( 32 Stat. 388) and acts amendatory thereof or supplementary thereto, it i s hereby announced that water w i l l be available beginning with the i r r i ~ a t i o ns eason of 1948, end thereafter, and that application may be made in accordance with t h i s notice, beeinnine a t 2: 00 p. m., October 22, 1947, for entry on public lands i n Part 2- file Lake Division of the KlamAth Project,, Oregon - California, as shown on approved farm unit plats on f i l e in the Office of the District Manaaer. Bureau of Reclamation. Klamath Falls. Oregon. and in the District Land Office a t Sacramento, ~ a l i r o r k a . These lands are dkcribed as fofiows:- . Mount Diablo Meridian. California Section 1 36 1 1 1 1 1 1 1 2 1 2 2 2 3 2 3 2 2 2 1 11 12 1 11 11 - Farm - Unit A B C D E F G H J A B C D E F K L A B Description Township 46 North. Ranp( e 5 % st Lots 1, 8 & ~"$ IE& ( T. C7 N., R. 5 E.) Lo* 10 Lots 2, 7 & 9 i ~ t ~ & Lots 3, 6 & SEN& Lots 12 and 15 Lot 18 ~ 4 SWk ~ 4 % E& E& Lots 4 & 5 Lots 13 & 14 ~ o1t & NNE~ Lot 2 & SE& NW~ Lot 3 Lot 20 swl. Srwt Lot 22 E!& '& a h t s 6 & 7 Lots 16 & 17 Lots 4 & 5 Lot 6 Lot 19 ww4 @ NWt Total Irri-gable Acres 86.7 81.9 84.6 84.2 72.9 73.8 71.4 72.0 n. 4 73.5 73.4 84.0 86.6 * 77.3 75.5' n. 8 68.8 75.2 Order of Selection Section 11 u 11 ll 12 12 12 12 12 12 12 12 12 35 35 34 35 34 35 35 36 36 6 6 7 6 7 7 7 - Farm - Unit C D E J A B C D E F G H A B C D i3 B C A B C A B D Total Irri- Description gable Acres Township 46 North. Rawe 5 East( contd. 1 L c t s 6 & 7 Lots 7 & 8 Lot 9 Township 427eh. Range 5 East Lots 12 & 13 Lots 11 & 14 Lot 9 $ 94 Lot 10 Lot 3 w& i Lots 4, 8 & 9 Township 46 North. Range 6 East Lcts 15, 16 & 18 Lots 6, 10, 17, 20 & 21 Lots 15, 16, Lots 22 & 23 Lots 7, 11, 17, 18, SZ$ NI+~ Lots 8, 12 & NE$ SW& Lots 9, U & sE$& Order of - Sslection 2. & nit of acreaKe for which entry may be made or water secured.-? he area of public land constituting each farm unit represents the acreage which, in the opinion of the Secretary of the Interior, may be reasonably reouired for the support of a family upon such land, and i s fixed a t the amount shown upon the farm unit plats referrcd to above. 3. Preference rinhts of veterans. Nature of reference.-- Pursuant to the provisions of the A- ct of September 27, 1944 ( 58 Stat. ai47>- dyt?;;; Acts of June 25, 1946 ( Public Law 440, 79th Congress, 2nd ~ e s s i o n ) , and May 31, 1947 ( Public Law 82, 80th Congress, 1st session), for a period of 90 days from the opening of these lands to entry, or u n t i l January 20, 1948, the lands described i n paragraph 1 above w i l l be opened t o entry to persons who a t the time of milking application f a l l within one of the following classes: ( 1) Persons, including persons under 21 years of age, who have served i n the Army, Navy, Marine Corps, or Coast Guard of the United States for a period of a t l e a s t 90 days a t any time on o r a f t e r September 16, 1940, and prior to the termination of the present war, and are honorably discharged therefrom. ( 2) Persons, including persons under 21 years of age, who have served i n said Amy, Nairy, Marine Corps or Coast Guard during such period, regardless of l e n ~ t ho f service, and are discharged on account of wounds received or disability incurred during such period i n the line of duty, or, subsequent t o a regular discharge, are furnished hospitalization or awarded compensation by the government on account of such wounds or disability. ( 3) Ihe spouse of any person i n e i t h e r of the above classes ( 1) and ( 2), provided such spouse has the consent of such person to exercise his o r her preference right under said Act. ( L) The surviving spouse of any person i n either of the above classes ( 1) and ( 2), or i n the case of the death or marriage of such spouse, the minor child or children of such person by a guardian duly appointed and o f f i c i a l l y accredited a t the Department of the Interior, ( 5) The surviving spouse of m p person whose death has resulted from wunds received or disability incurred i n l i n e of duty while s e r v i n ~ i n said Army, Navy, Marine Corps or Coast , Tuard during the aboveaentioned period, or i n the case of the death or mrriage of such spouse, the oinor child or children of such person by a guardian duly appointed and o f f i c i a l l y accreEited a t tile Department of the Interior. Provided, however, that persons claiming such preferences must be qualified t o make entry under the homestead laws and also possess the qualifications as t o industw, experience, character, capital, and physical fitness required of a l l entrymen and entrywomen under t h i s notice. b. Definition of honorable discharge.- An honorable discharge within the meaning of the Act of Septenber 27, 1964, as amended, shall mean: ( 1) Separation of the veteran from the service by means of an honorable discharge or a discharge under honorable conditions. ( 2) Transfer of the veteran with honorable service from such service to a reserve or r e t i r e d s t a t u s prior to the termination of the war, or ( 3) Ending of the period of such veteran's war service by reason of the temination of the war, even though the veteran remains i n the military or naval service of the United States. c. Submission of proof of veterans' status.- All applicants for farm units who claim veterans* preference must attach to t h e i r applications a photostatic, c e r t i f i e d , or authenticated copy of an o f f i c i a l document of the respective branch of the service involved which clearly indicates an honorable discharge or transfer to a reserve o r retired status or which constitutes eddence of other facts on which the claim for preference i's based. Where the preference i s claimed by the surviving spouse, or on behalf of the minor child or children, of a deceased veteran, proof of such relationship, of his military service, and of his death must be attached to the application. Where the preference i s claimed by the spouse of a livinz veteran, proof of such relationship, the written consent of such veteran, and proof of his military service as re, mired above must be attached to the application. 4. Qualifications required by the Reclamation Law.-- Pursuant to the provisions of subsection C, section I+. of the Act of December 5. 1924 ( L3 Stat. 702. 43 U. S. C. 433). the follow in^ are established as minimrun nualifications which, in'the opinion of the iocal examjning koe. rd, are necessary to insure the success of entrymen or entrywomen on reclamation farm units included under t h i s notice. Appli-cants must meet these qualifications, as determined by the exanAninc boerd, i n order to he considered for entry. Failure to meet them i n any single respect will be sufficient cause for rejection of an application. No credit wi'll be given : or qualifications i n excess of the minimum reouired. The minimum qualifications are as follows: l a. Character and industry.- The applicant must be possessed of honesty, temperate habits, t h r i f t , industry, seriousness of purpose, record of good moral conduct, an8 a bona f i d e i n t e n t t o engage in farming as an occupation. As part of each application, the applicant shall furnlsh three separate signed statements regarding the character and industry of the applicant. These statements may be prepared and signed by an ordained sinister, any commanding officer under whom the applicant served, a teacher or administrative o f f i c i a l of any recognized high school o r college, present or previous employer or any comparable individual or o f f i c i a l , not a relative, who i s personally acquainted with the applicant. The individuals signing these statements may be those l i s t e d in para-graph 17 of the farm application blank, referred to i n paragraph 6 of t h i s notice. \ b. Health.-- The applicant must be i n such physical condition as w i l l enable him t o engage i n n o m l farm labor. Any person who i s physically handicapped or afflicted with any condition which makes such a b i l i t y questionable must attach to his application the detailed statement of an examining physician which defines the limitation upon such a b i l i t y and i t s causes. c. Farm experienn. ( 1) Fam experience shall be of such a n a t ~ r ea s in the judgment of the examining board w i l l qualify the applicant to undertake the development and operation of an irrigated farm by modern methods. The applicmt must have had a minimum of twa years' full- time farm experience a f t e r attain-ing the age of 15 years. ' Iko years of study i n agricultural courses i n an accredited agricultural college or tw years of responsible technical work in agriculture, i f deemed by the examining board to be work which would contlribute toward successful farm operation, may be substituted for one year of full- time experience; pmvided that no more thnn one year's experience may be credited from such sources. . A farm youth having atteined the age of 15, who actually resided and wrked on a farm h i l e attending school, majr credit such part- time experience as equal to 50 percent of full- time experience. A l l fam experience must have been obtained since October 1, 1932. No advantage w i l l accrue from farming ex-perienae on irrigated land. ( 2) Applicants must furnish three separate statements each signed either by a Vocational Agricultural teacher, County Agent, Farmers Home Administration County Supervisor, A. A. A. County Chairman, an officer of any local farm organization, or by some other responsible person who has personal knowled~ e of the applicant's farm experience or has verified it to h i s satisfaction certifying t o the farm experience claimed i n paragraph 7 of the farm application blank. Forms to be used by these references accompany each farm application blank. ( 3) Women applicants must describe fully the farm a c t i v i t i e s i n which they have participated and the relation of any agricultural courses they have taken to farm operation and management. d. Capital.-- Each applicant must possess at least $ 2,000, consisting of cash or assets readily convertible into cash, such as United jtates Savings Bonds, or assets useful i n the operation of a fann, such as livestock, farm machinery and equipent. In addition, each applicant shall furnish, i n the space pmvided i n paragraph 11 of the farm application blank, a financial statement l i s t i n g all of h i s assets and all of h i s l i a b i l i t i e s , showing a net worth of a t l e a s t 92,000. " Possession of the minimum net Worth rewrement of at least $ 2,000 must be corroborated hy a statement of an o f f i c i a l of a bank, or other responsible and reputable private or public credit agency. This corroborative statement may be a separate attachment, or may be inserted at the bottom of page 3 of the farm application blank. e. liestilction re~ ardinp: l andsopresently owned on any Federal reclamation projects.- In addition, i n order to qualify for entry on project lands, applicants must not hold or own, within any Federal reclamation project, irrigable land for h i c h construction charges payable t o the United States have not been fully paid. Proofs of conformity with t h i s renuirement need not he furnished, but a check of proj-ect lands w i l l be made to determine e l i g i b i l i t y of applicants before, awards of farm units are nade. 5. Principal qualifications required by homestead laws.- Tne homestead laws reouire that an entrynan or entxyvmman: a. Must be a citizen of the United States or have declared an intention to become a citizen of the United Stntes. , . + b. Must not have exhausted the ri& t to make hoxestead entry on plblic land. c. Must not own more than 160 acres of land i n the TJnited States. d. Entrywomen who are married must be heads of families; t h i s requirement of the homestead law was not affected by the Act of September 27, 19WI. ( 58 Stat. 747), as amended. Nntrgmen and unmarried entrywomen must be 21 years of age or the head of a family, except that such minimum age reauirement is not applicable t o entrymen or unmarried entrywomen who have served in the Army, Navy, Marine Corps or Coast Guard of the United States for a period of a t l e a s t 90 days a t any time on or a f t e r September 16, 1940, and prior to the termination of the present war and are honorably discharged. Any applicant who i s renuired t o be the head of a family must submit proof of such status with his or her application. Complete information concerning qualifications for homesteading may be obtained from District Land. Offices or from the Bureau of Land Management, Washington 25, D. C. I 6. .& en. where. and how to amly for a farm unit. a. Application blanks.- Pay person desiring to acauire one of the p b l i c land units described i n t h i s notice must f i l l out the attached farm application blank. Additional application blanks may be obtained from the D i s t r i c t Manager, Bureau of Reclamation, P. 0. Box 312 ( quilding 61, Mmicipal Air-port), Klamath Falls, Oregon; Regional Director, Bureau of Reclamation, P. 0. Yox 25ll, Sacramento 10, California, or the Commissioner, Bureau of Reclamation, Washington 25, D. C. Each question on the farm application blank must be answered completely, with the exception that preference choice of farm units need not be listed i n the space provided on page J. b. Filing of applications and proofs.- An application for a, fann unit l i s t e d in paragraph 1 of t h i s notice must be f i l e d with the District Manager. hreau of Reclamation. P. 0. Box 312, ( Building 61, Municipal Airport), Klamath Falls, Oregon, in persoi or by mail. No advantage will accrue to an appli-- cant who presents h i s or her application i n person. Such an application must be accompanied by: ( I ) Proof of veteran's status i f veteranst nreference i s claimed; see above, paragraph 3 c. ( 2) Three statements as to character and industry; see above, pragraph 4 a. ( 3) statement of examining physician, i n case of disability; see above, praeraph 4 b. ( 4) Three statements corroborating the fanu experience cldm; see above, paragraph 4 c ( 2). ( 5 ) Corroboration of c a p i t a l assets; see above, paragraph 4 d. ( 6) Proof of status a s head of a family I f applicant i s a narried wman veteran, or a non-veteran under the age of 21; see above paragraph 5 d. c. Priority of applications.-- All applications f i l e d f o r the public land fam units l i s t e d i n t h i s notice w i l l be classified for priority purposeseas follows and considered i n the following order: ( 1) First Prioritg- G-.-- All applications fj led prior to 2: 00 p. m., Januarg 20, 1948, 4. which are accompanied by proof sufficient i n the opinion of the board t o establish e l i g i b i l i t y f o r veterans' preference, A l l such applications will be treated as simultaneously filed. ( 2) Second Przorit Grou .-. A11 applications f i l e d prior t o 2: 00 p. m., ~ anuary' 20, 1948, from applicants without veterans: prefzrence o r which are nvt accompanied hy proof sufficient in the ' A opinjon of the board. to establish e l i g i b i l i t y for veterans' preference. A l l such applications w i l l be t ~ e a t e da s simultaneously filed. . ( 3) Final Priority Grou..- All applications f i l e d after 2: 00 p. m., January 20, 1948, whether or not accompanied by proof relative t o veterans' preference. Such applications w i l l be con-sidered in the order i n which they are filed, i f any farm units become available for assignment to appli-cants within t h i s group. d. h l i c a t i o n s cannot be returned.--% ch application subnitted, including substantiating and supporting data, becomes a pert of the pemnent records of the Burem of Reclamation and cannot be returned to the applicant. \ 7. Selection of 2 G f i e d apulicants. a. 7?,, 7minin~ h- o~.-. b examining board of three nemhers has heen approved hy the Commissioner of Reclamation t o consider the fitness of each applicant t o undertake the development and operation of a farm on the Klamath Project. Careful investigations will he made t o verify the statercents and representntions made by .% pplicants in order t o determine t h e i r nualifications as prescribed in t h i s notice. b. Wsis of exami. n& t> s.-- The examinin& hoard will determine the eligibility for the award of a reclamation farm unit under subsection 4C of the Act of December 5, 1924. As stated ahove i n para-graph 4, applicants w i l l be judged on the basis of character, industry, fanning experience, and capital. No applicant w i l l be considered eligible who does not malify i n all respects, or who doe3 not, in the opinion of the board, possess the health and vigor to engage in farm work. Any f a l s i f i c a t i o n or fraudu-lent misrepresentation shall constitute ground for the dismalification of the applicant, the rejection of his application, the cancellation of his award, and/ or the cancellation of his entry. c. Procedure. ( 1) Pre1ivina~~ amination.-- If ah applicant f a i l s to make a prima facie case, that is, i f an ex- mLnation of h i s application discloses that he is not qualified i n respect to the requirements prescribed herein, the application shall be rejected and the applicant notified by the board of such rejection and the reasons therefor, and of h i s right to'appeal in writing to the Regional Director, Region 11, Bureau of Reclamation. Such written appeals must be filed within ten ( 10) days from the receipt of such notice with the District Kanager, Bureau of Reclamation, P. 0. 90x 312 ( Building 61, Municipal Airport), Klamath Falls, Oregon, who will forward them promptly t o the Regional Erector. If an appeal i s decided by the Regional Xrector i n favor of the applicant, the application will be referred to the examining board for inclusion i n the drawing. A l l decision3 on appeals will he based exclusively on information obtained prior t o rejection of the application by the examining board. The Kegional Director's decision on a l l appeals shall be a n a l . ( 2) Selection of a~ plicants.- After the expiration of the anpeal periods fixed by the ahoveaentioned notices, . wd in the absence of any pending appeals, the examining board shall conduct a public drawing from the names of the remaining applicants i n the First Priority Group, as defined i n parapaph 6 c. Qualified applicants need not be present a t the drawing i n order to participate therein. A t o t a l of 88 names ( twice the numher of puhlic land farm units to be awarded) shell be drawn snd numbered consecutively. The applicants whose names are so drawn may be closely investieated by the board to determine the authenticity and r e l i a b i l i t y of the infcnnation and proofs offered by them. This i n v e s t i ~ a t i o nm ay include a personal appearance before the board, i f the hoard determines that t h i s i s necessnry; should any applicant f a i l to com? ly with the hoard's renuest for a personal appearance, such f a i l u r e shall conatitute ground for rejection of his application. Any applicant, whose application is rejected by the board as a result of such investigation, shall he given notice of such rejection, setting forth the reasons therefor and advising the ap licant of his right t o appeal in writing to the Xegional Director. The provisions of paragraph 7 c ( 17 relative t o appeals shall be applicable to any such appeal, except that where any such appeal i s decided by the Regional Director in favor of the applicant such applicant shall retain the number assigned t o him a t the time of the drawing. After the expiration of all appeal periods fixed by notices given as above- provided, and i n - t h e absence of any pending appeals, those applicants whose applications remain unrejected and who hold the W, lowest numbers assigned a t the drawing, exclusive of those numbers assigned to rejected applications, shall be selected by the e x d n i n g board as the successful applicants. The balance of the 88 appli-cants whose applications remain unrejected shall be selected by the board as alternates. The board shall thereupon notify each successful applicant and each alternate of h i s selection and of his respective standing. The board shall thereupon notify a l l other remaining a l i c a n t s t h a t farm units will not becom available to than, except pursuant to subparagraph 7 c. ( 3)( 3bel ow. ( 3) Awarding of farm units. ( a) Upon the completi. on of any action which may become necessary by reason of any notices given, the examining board shall award farm units i n accordance with order of selection numbers assigned such units to the above- mentioned W, successful applicants i n the order in which t h e i r names are drawn without regard to preferences indicated by applicants for specific farm u n i t s o r otherwise. Each applicant to whom a farm unit has been awarded will be notified of t h a t f a c t by the board. Each such applicant shall have no right of entry for any other farm unit. If any such applicants f a i l to make application for homestead entry in conformity with the provisions of paragraph 9 below or t o comply with the other applicable renuircrrmente set out in said paragraph, the farm units awarded to them shall he awarded to alternates i n the order in which t h e i r names were dram and mbjact to the same condi-tions and reouirements as the 01% nal awards. ' he alternate withthe lowest number as assigned under the p= ovisions of paragraph 7 c. $ 1 hall tak( the place of the loweat numbered applicant m n g the f i r s t W* who f a i l s to make application for homestead entry. or disqualifies by failure to comply with the other rerpirmmts s e t forth i n paragraph 9 below; and the alternate with the second lowest number shall take the place of the second lowest numberad applicant who f a i l s t o make application for homestead entry or comply with the other mruiremmtr. Thm same procedure shall continue to apply u n t i l a l l f a n units have been awarded. ( b) The foregoing procedure h a l l continue u n t i l a l l fam units are finally disposed of to unrejected mpplicantr in the First Priority Group whose names have been drawn and whose applica-tions hnve been closely investigatd as provided herein. If units still remain to be awarded a f t e r a l l applications in the Pirst Priority Group have been procerrod, the foregoing procedure shall be applied i n the proceasing of applications in the Second Priority Group. If d t s . till remain t o b e awarded a f t e r all applications in the Second Priorlty Cmup have been processed, the foreg'oing procedure shall be applied in the'processing of applications i n the Pinal Priority Group, except that the board shall consider such applications in the order i n which they are f i l d i n lieu of conducting a drawing with reference thereto. ( 4) DeUmrg of notices.- All notices given to applicants pursuant to the provisions of paraeraph 7 c. and subparagraphs thereunder shall be i n writing and shall be delivered t o the respective applicants personally or sent to them by registered m a i l with return receipt requested. 8. ! Narn- against unlawful settlement.- No parson shall be permitted t o gain or exorcise any right under any settlement or occupation of any of the public lands covered by t h i s notice except under the terms and conditions prescribed by t h i s notice. 9. Payment of charms and filin,? of homestead applications.- After the 44 successful applicants have been selected, they & all be so notified hy the examininl~ board, and with such notice the examining hoard shall enclose a water rental application for the farm unit awarded which must be executed by the applicant and returned to the District Manager, Bureau of Reclamation, P. 0. Box 312 ( Buildiq 61, hnicipal Airport), Klamath Falls, Oregon, within ten ( 10) days from receipt thereof, to& her with the pdyment of the minimum water rental charge as specified i n uaragraph 10 a. hereof. Upon r e c e i ~ to f water rental application and payment of the amount due thereon, the examining board shall furnish each appli-cant a c e r t i f i c a t e statine that his qualifications to enter public lands as renuired by subsection C of Section 4 of the Act of December 5, 1924 ( W Stat. 702) have been uassed upon and approved by the examining board. Such c e r t i f i c a t e mast be attached by the applicant t o h i s homestead application which application must he f i l e d at the District Land Office of the Bureau of Land Management, Sacramento, California. Such homestead application must be f i l e d within t h i r t y ( 30) days from the date of the receipt by the applicant of said certificate. Failure to pay the water rental charge or to make appli-cation for homestead entry within the periods specified herein w l l l render the application subject to rejection, i n which event the examining board w i l l select the next listed alternate. 10. Charges payable by a l l water users,- The Reclamation Law provides that except during a ' ldeveloument ~ eriodl' fixed by the Secretary of the Interior water m y not be delivered for the irrina-tion of- lands- until an org& zation, satisfactory i n form and powers- to the Secretary, has entered into a contract with the United States prodding for the repayment of the project construction costs & ich are allocated to such irrigated lands. Pursuant to Section 2 ( 5 ) and 7 ( b) of the Rsclnmation Project Act, of 1939, ( 53 5tat. 1187), lands described i n paragraph 1 of t h i s plblic notice are hereby designated a developnent unit. The maximu developnent period for the lands so designsted i s fixed a t a period of four gears from and including the f i r s t year in which water i s delivered; provided, that such period may be reduced by supplemental mtice should the Secretary determine that the f u l l four- year period i s not reasonably necessarg. Before the end of tha developent period, a l l lands described i n said para-graph 1, must, therefore, be included within an organization of the type described and such organization must execute a contract cwering the repaynent of the construction costs allocated to such lands. a. Char~ es payable before execution of the r e p s p n t contract. ( 1) The minimum water rental charge f o r the irrigation season of 1948 and thereafter u n t i l further notice shall be three dollars ($ 3.00) per acre for each irrigable acre of land in the f a n unit, whether water i s used or not, which will entitle the entryman to two and one half ( a) acre- feet . of water per irrigable acre. Payment of this charge for the irrigation season of 1948 s h a l l be made at the time of filing water rental applications. ( 2) Additional water dl1 be firnished during the 1948 i r r i ~ a t i o n season and thereafter u n t i l further notice up to a limit of three and one half ( 33) acre- feet per irrieable acre at the rate of f i f t y cents ( 80.50) per acre- foot and a11 further nuantities a t seventy- five cents ( w. 75) per acre-foot. Charges for the additional water are to be paid on or before hcember 1 of the year in which used. No water shall be delivered to the water uemr in mbsequent years u n t i l a l l such charges have been paid in full. ( 3) In the event any applicant does not receive notice of the award of a farm unit u n t i l a f t e r June 15, 1948, payment shall be a minimum charge of three dollars ($ 3.00) per acre, which payment shall apply as a credit on the minimum charge for the following irrieation season. ( h) The foregoing charges are subject t o a l l provisions of the Federal Reclamation Law relative to collections and penalties for delinquencies. The charges w i l l be paid a t the office of the Bureau of Reclamation, Klamath Falls, Oregon. Future charges dll be announced by future order o r public notice. 6. b. Charges payable a f t e r execution of the repayment contract.- Subsequent to the execution of the repayment contract, and i n accordance with the terms thereof, water users will pay an annual charge per acre t o meet operation and maintenance costs and t o repay t o the government that portion of the constmction costs allocated to Part 2, Tule Lake Division. On the date of issue of t h i s puhlic notice, it i s impracticablr to determine ( 1) the t o t a l construction cost of Part 2, Tule Iake Divlsion distributary system; ( 2) the allocation of costs to Part 2, ' We Lake Division of tho Klamath Federal Reclamation Pmject, and ( 3) the ultimate water- service area of the Division. Accorrlingly, no exact statmnent as t o the t o t a l and per acre construction charge t o be made against the lands opened in t h i s puhlic notice i s practicable, When the t o t a l construction charge has been detedned and allocated by the Secretary of the Interior, and a repapent c o n t r q ~ tn egotiated with the irrigation d i s t r i c t , a supplementary notice announcing the t o t a l and per acre charges will be issued. 11. A l l land to be i ~ c l u d e di ~- i- r1ii~ t~ qnn( 1- i= t_~ i~.- 5acwh ater rental appliciltion for land covered by t h i s plblic notice shall be made on Form 7- 39 and the followine clause shall be inserted a5 the bottom of wid form: " 1 agree to the inclusion of my land i n an irrigation d i s t r i c t and I agree'also to p r t i c i p a t e in the organization of ? n i r r i ~ a t i o nd i s t r i c t at the earliest practicable date." 12. Reservation of riphts- of- way for county. state. and Federal highwzys and access roads.- Rights- of- way are reserved for county, s t a t e and Federal highways and access roads to the f ~ r mu nits shown on said plats along section lines and other lines shown in red on the farm plats. 13. Reservation of ri& ts- of- wau for publicdwned utilities.- Kightsdf- way are reserved for covernment- owned telephone, electric transmission, water and sewer lines, and water treating and pump ing plants, as now constructed, a d the secretary of the Interior reserves the r i g h t t o locate such other gwenwent- owned f a c i l i t i e s over and across the farm units above descri! md as hereafter, i n his opinion, may be necessary f o r the proper construction, operation, and maintenance of the said project. 14. Effect of relinquishment.-- In tho event that any entry of public land made hereunder shall be' relinauished ot any time prior to actual residence upon the land by the entrynan for not less than one year, the land so relinquished shall not be subject to entry for a period of 60 days a f t e r the f i l i n g and nctation of the relinnuishment i n " he Cistrict Land Office. Applicfltions conforming to the reqhire-ments of t h i s public notice may be f i l e d for a period of 15 days a f t e r the expiration of said 60- day period. Ach applications w i l l be considered ard processed anrl awards made pursuant to the provisions of paragraphs 7 and 9 of this public notice. 15. Waiver of mineral rights.-- All homestead entries f o r the ahove- described farm units will he subject to the laws of the United States governing mineral land, and all homestead applicarts under this notice must waive the rij< ht t o the mineral content of the land, i f required to do so by tke hrea. 1 of Lwd Ifanagement; otherwise the homestead applications will he rnjected o r the homestead entry or entries canceled. 16. Flood hazard.-- The lands to he entered are reclaimed lands lyiw in the former bed of Tnle Lake and m y be subject t o flooding and invndation during extremely wet nesrs. The Sureau of 2ecla1rstion i s now engaged i n the constmction of additionel works which, when completed, w i l l nrov5. de reasonnble flood protection. Settlers are warned, however, that i n case- of extreme mnoff result in^ in the fl. ood-iny of any of the lands, the government assumes no responsitdlity for dmare to persons or property caused by such flooding. Assistant Secretary of the Interior
-
BIOLOGICAL ASSESSMENT OF KLAMATH PROJECT'S CONTINUING OPERATIONS ON THE ENDANGERED LOST RIVER SUCKER AND SHORTNOSE SUCKER U.S. Bureau of Reclamation Mid-Pacific Region Klamath Basin Area Office Klamath ...
Citation Citation
- Title:
- Biological assessment of Klamath Project's continuing operations on the endangered Lost River sucker and shortnose sucker
- Author:
- United States. Bureau of Reclamation
- Year:
- 2001, 2005
BIOLOGICAL ASSESSMENT OF KLAMATH PROJECT'S CONTINUING OPERATIONS ON THE ENDANGERED LOST RIVER SUCKER AND SHORTNOSE SUCKER U.S. Bureau of Reclamation Mid-Pacific Region Klamath Basin Area Office Klamath Falls, Oregon February 13,2001 TABLE OF CONTENTS 1.0 INTRODUCTION 2 2.0 DESCRIPTION OF THE ACTION 3 3.0 DESCRIPTION OF HISTORIC OPERATIONS 6 4.0 ENDANGERED SPECIES POTENTIALLY AFFECTED BY THE KLAMATH PROJECT 16 5.0 ENVIRONMENTAL BASELINE 60 6.0 EFFECTS OF KLAMATH PROJECT ON BALD EAGLES 60 7.0 EFFECTS OF KLAMATH PROJECT ENDANGERED SUCKERS 63 8.0 PROPOSED CRITICAL HABITAT FOR ENDANGERED SUCKERS 82 9.0 CUMULATIVE EFFECTS 84 10.0 DETERMINATION OF EFFECTS 89 11.0 LITERATURE CITED 90 12.0 PERSONAL COMMUNICATIONS 100 13.0 APPENDIX 1 - ESA CONSULTATION REVIEW 101
-
9. [Image] Settler's guide
This brochure was probably published by the United States Bureau of Reclamation. It was compiled to provide information on the requirements and recommendations regarding homesteading on Tule Lake.Citation Citation
- Title:
- Settler's guide
- Author:
- United States. Bureau of Reclamation
- Year:
- 1948, 2004, 2005
This brochure was probably published by the United States Bureau of Reclamation. It was compiled to provide information on the requirements and recommendations regarding homesteading on Tule Lake.
-
10. [Image] Tule Lake Sump 2 - Q-1 Lateral, Station 13
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...Citation Citation
- Title:
- Tule Lake Sump 2 - Q-1 Lateral, Station 13
- Author:
- United States. Bureau of Reclamation, Stein, D.W.
- Year:
- 1963, 2008, 2006
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of construction had been set flush with the bank surface; April 23, 1963; Photo by D. W. Stein