Search

You searched for: Start Over Water flow Remove constraint Water flow Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation

Search Results

  • 890
    August 3, 1908
    Citation
  • 3075
    KP-2215-R2 - Klamath Project, Gerber Dam. Downstream face of spillway showing leaks from construction joints and water flowing along downstream face of dam. California Projects; July 14, 1953; Photo by ...
    Citation
  • 3671
    KP-2599-R2-Klamath Project, LANGELL VALLEY DIVISION - North Canal. Looking northwest at Station 451. Emulsion and water flowing in empty canal; April 27, 1961; Photo by K.J. Greene
    Citation
  • 4. [Image] Gerber Dam
    5082
    CN-12-201-542NA Klamath Project. View of water flowing over Gerber spillway at 60 cfs from area below left abutment; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 4622
    P12-201-4540NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water flowing from base of the left retaining wall at Plant E. Flow was a by-product of jetting operations for Plant E west ...
    Citation
  • 4523
    P12-201-4441 NA Klamath Project, OR-CA. Center Canal Flume--View of outlet transition south wall after corntractor forces stopped source of water flow. Visquene was laid next to the outlet transition ...
    Citation
  • 3515
    KP-2502-R2- Klamath Project- CLEAR LAKE- Ground Fracture - Southwest Shore, Section 16, T. 46 N., R. 7 E., M.D.M. - D. E. Close-up of the water inlet to the fracture showing how the water flows to the ...
    Citation
  • 4650
    P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
    Citation
  • 4520
    P12-201-4438 NA Klamath Project, OR-CA. Center Canal Flume--View of flume south wall near pile cap where water exited after piping along fllume wall. This water flowed into the void adjacent to the outlet ...
    Citation
  • 3657
    KP-2585-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5307, R-Canal. Looking downstream from Station 37+07 of the R-Canal. Water flowing at the check at Station 37+36; January 18, ...
    Citation
  • 11. [Image] Gerber Dam
    5072
    CN-12-201-533NA Klamath Project. View from right abutment of Gerber Dam, showing water flowing over spillway into plunge pool at base of Dam, 60 cfs.; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 12. [Image] Gerber Dam
    5073
    CN-12-201-534NA Klamath Project. View of water flowing over spillway into plunge pool at base of Gerber Dam, from right side of plunge pool; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 13. [Image] Gerber Dam
    5074
    CN-12-201-535NA Klamath Project. View of water flowing over spillway into plunge pool at base of Gerber Dam, from right side of plunge pool; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 14. [Image] Gerber Dam
    5075
    CN-12-201-536NA Klamath Project. View of water flowing over spillway into plunge pool at base of Dam, from area below left abutment; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 15. [Image] Gerber Dam
    5077
    CN-12-201-537NA Klamath Project. View of water flowing over spillway into plunge pool at base of Dam, from area below left abutment; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 16. [Image] Gerber Dam
    5083
    CN-12-201-543NA Klamath Project. View from Dam crest of water flow over Gerber spillway from left side. Spill was 60 cfs.; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 5117
    CN-12-201-578NA Klamath Project - Oregon-California. View of downstream face of Gerber Dam. Note new foot­bridge in foreground. Note water flowing over rock weir which was constructed under this specification ...
    Citation
  • 1441
    KP-1099-R2 - Klamath Project. Vertical cracks, varying in width up to 3" form subterranean channels for flow of water. Approximately 1/4 sec. ft. of water is shown flowing from the crack. The top surface ...
    Citation
  • 3519
    KP-2506-R2-Klamath Project - CLEAR LAKE - Ground Fracture - Southwest Shore, Section 16, T. 46 N., R. 7 E., M.D.M. This shows the two enlargements in the fracture channel. The water actually flows into ...
    Citation
  • 3298
    KP-2411-R2 - ENTERPRISE POWER PLANT - Klamath Project. Hole in lining on east side of forebay eroded during 1957 irrigation season. Upper part of hole was repaired during flow of water; October 1957; ...
    Citation