P12-201-4419 NA Klamath Project, OR-CA. Flooding of Horsley land northwest of Plants E and EE. Dike built by rancher west of Plant EE. High water due to rancher flooding his field for quackgrass control. ...
Citation -
P12-201-4422 NA Klamath Project, OR-CA. Ady Canal--1'x1' steel H beam was used between kickers and tunnel cribbing; August 25, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4426 NA Klamath Project, OR-CA. Ady Canal--To get carrier pipe through the tunnel liner ice (crushed) was spread over sand bedding in tunnel liner plate. A car hood was used as a sled on leading ...
Citation -
P12-201-4432 NA Klamath Project, OR-CA. Ady Canal--the cribbing was cut with a chainsaw and tunnel shield pushed through the hole using hydraulics. View looking west as the shield exits through the shoring; ...
Citation -
P12-201-4452 NA Klamath Project, OR-CA. Completing shoring for tunnel exit under SP rr tracks. Shoring used 1.7' to 0.9' Douglas fir timber piling cut at required lengths; August 23, 1977; USBR photo ...
Citation -
P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
Citation -
P12-201-4461 NA Klamath Project, OR-CA. PP EE--view looking south. Hanging flap gates on PP EE outlet structure, using Pettibone 30 Crane. Note: Curing compound had been sand blasted prior to flap gate ...
Citation -
P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
Citation -
P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
Citation -
P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
Citation