Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Drainage Remove constraint Subject: Drainage Subject Irrigation canals and flumes -- Maintenance and repair Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair

Search Results

  • 4683
    P12-201-4601NA Same as #4600 above P12-201-4602NA Same as #4600 above
    Citation
  • 2. [Image] P12-201-4602NA
    4684
    P12-201-4602NA
    Citation
  • 3448
    P12-200-2743A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; George R. Stacy Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation ...
    Citation
  • 3449
    P12-200-2744A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; leveling of berm is in progress. George R. Stacy, Contractor Specifications No. 200C-541; ...
    Citation
  • 3294
    KP-2407-R2 - LANGELL VALLEY - Klamath Project. Drainage inlet culvert on northeast side of channel. Looking southwest, showing fill over inlet which was washed away during flood of January 1956; October ...
    Citation
  • 4239
    P-12-200-4157NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised coulters for this view. Photo shows 4-inch pipe with drain guard about 5' below natural ground; ...
    Citation
  • 4240
    P-12-200-4158NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised the coulters for this view. Photo shows 8-inch pipe about 6.5 ft. below natural ground surface. ...
    Citation
  • 4241
    P-12-200-4159NA Klamath Project - Oregon-California. View of marmots at headworks of drain on left bank. Note large holes that extend very deep below ground surface; May 1976; USBR photo by D. W. S...
    Citation
  • 4242
    P-12-200-4160NA Klamath Project - Oregon-California. View of walkway installation at 36" CMP input, Sta. 51+90, left. Laborer using an earth wacker to drive sheet piling. Method seems to work but driver ...
    Citation
  • 4243
    P-12-200-4161NA Klamath Project - Oregon-California. Front view of piling for walkway at Sta. 51+90. The three front panels are in place; May 1976; USBR photo by D. W. Stein
    Citation