Search

You searched for: Start Over Watersheds Remove constraint Watersheds Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Author Rosten, T.J. Remove constraint Author: Rosten, T.J.

Search Results

  • 5176
    CN-12-200-20A. Gerber Watershed - Klamath Project, Oregon. Small reservoir excavated by BLM, during 1968, in a wet weather seep near Wagon Wheel Springs. This reservoir is located in the SW1/4NE1/4 of ...
    Citation
  • 5177
    CN-12-200-21A. Gerber Watershed - Klamath Project, Oregon. Stock-pond - pit-type - constructed by BLM during the summer of 1968. This pond is located in a dry lake bed in the NE1/4 of Sec. 5, T. 39 S., ...
    Citation
  • 5178
    CN-12-200-22A. Gerber Watershed - Klamath Project, Oregon. Earthfill dam and reservoir constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. Earth spillway is located at left ...
    Citation
  • 5179
    CN-12-200-23A Gerber Watershed - Klamath Project, Oregon. Earthfill dam and spillway constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. This is another view of the reservoir ...
    Citation
  • 5180
    CN-12-200-24A Gerber Watershed - Klamath Project, Oregon. Stock-pond - pit-type - constructed by BLM in the summer of 1968. This pond was constructed in a large flat in the NE1/4 of Sec. 3, T. 39 S., R. ...
    Citation
  • 5181
    CN-12-200-25A Gerber Watershed - Klamath Project, Oregon. Stock-pond - pit-type - constructed by BLM in the summer of 1968. This pond is located in a large fist in the NE1/4 of Sec. 3, T. 39 S., R. 14 ...
    Citation
  • 5182
    CN-12-200-26A Gerber Watershed - Klamath Project, Oregon. Stock-pond – pit-type – constructed by BLM in the summer of 1968. This pond is located in the NE1/4 of Sec. 14, T. 39 S., R. 14 E, W.M. The overall ...
    Citation
  • 5183
    CN-12-200-28A Gerber Watershed - Klamath Project, Oregon - California. View of Round Valley Reservoir, looking southwest from top of dam. Note -- water has filled the approach channel to the outlet works. ...
    Citation
  • 5184
    CN-12-200-27A Gerber Watershed - Klamath Project, Oregon. Stock-pond – pit-type – constructed by BLM in the summer of 1968. This pond is located in the NE1/4 of Sec. 14, T. 39 S., R. 14 E, W.M. This is ...
    Citation
  • 5185
    CN-12-200-30A Gerber Watershed - Klamath Project, Oregon-California. View showing the beginning of the water spreader system. The turnout on the left serves as the headworks of the most westerly spreader ...
    Citation