  • 4474
    P12-201-4392 NA Klamath Project, OR-CA. Center Canal Flume--View of flume repairs. 24" CMP for supplying irrig. water to ranchers while allowing work inside flume. Nine 1-inch temporary flume tie rods ...
    Citation
  • 4571
    P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
    Citation
  • 4572
    P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4573
    P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4574
    P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4575
    P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4576
    P12-201-4494 NA Klamath Project, OR-CA. Preparation of 84" RCP pipe bedding. Total depth 2' consisting of 1 to 1.5 foot of 3" minus rock and 1' to 6" of 3/4 minus material with a large percentage of fines. ...
    Citation
  • 4582
    P12-201-4500 NA Klamath Project, OR-CA. Ady Canal -- Siphon forming going up for round to square transition on outlet of 84" CMP. Bulkhead in background is for shoring tunnel exit from under SP RR tracks; ...
    Citation
  • 4583
    P12-201-4501 NA Klamath Project, OR-CA. Center Canal Flume -- Photo shows crack on floor joint of flume after cleanup. These were dried using propane heaters overnight prior to repairs. These joint openings ...
    Citation
  • 4584
    P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
    Citation