Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
« Previous | 1 - 10 of 558 | Next »
Search Results
-
1. [Image] Tule Lake Sump 2 - Q-1 Lateral, Station 13
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...Citation -
P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
Citation -
3. [Image] TULE LAKE SUMP 3 - Spec. No. 200C-519
P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. SteinCitation -
P12-200-2727 - Klamath Project - KLAMATH STRAITS DRAIN - Middle Canal Flume repair, Specs. No. 201C-3(SF). View of raised concrete walls just completed by contract. Note "slough in" caused by overflow ...
Citation -
5. [Image] TULE LAKE SUMP 1-A - Canadian geese
P12-200-2732 - Klamath Project - TULE LAKE SUMP 1-A - Canadian geese - note large number of goslings in this typical group; May 28, 1963; Photo by D. W. SteinCitation -
6. [Image] KLAMATH STRAITS DRAIN
P12-200-2741A- Klamath Project - KLAMATH STRAITS DRAIN - View of Fish and Wildlife Service dragline cleaning left side and bottom section, Sta. 489, working upstream. Note right side previously cleaned ...Citation -
P12-200-2742A Tule Lake Division - Klamath Project -- Oregon-California. Contractors equipment in foreground consists of a 22-B Bucyrus Erie dragline and a TD-6 dozer. George R. Stacy Contractor, Specifications ...
Citation -
P12-200-2743A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; George R. Stacy Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation ...
Citation -
P12-200-2744A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; leveling of berm is in progress. George R. Stacy, Contractor Specifications No. 200C-541; ...
Citation -
10. [Image] Tule Lake Division - View showing installation of 24" Flume extension at Sta. 47+ on the N-1 Lateral
P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...Citation