Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
« Previous | 1 - 20 of 551 | Next »
Search Results
-
1. [Image] Shasta View Irrigation District R&B System
CN-12-201-526NA Klamath Project. View of inlet structure to main pumps; May 15, 1975; USBR photo by D. W. SteinCitation -
CN-12-201-279NA Klamath Project - Oregon-California. Motor patrol is placing a dike on either side of the road. This dike is meant to protect the roadway from wave action when the adjacent fields are flood ...
Citation -
3. [Image] KLAMATH STRAITS DRAIN
P12-200-2741A- Klamath Project - KLAMATH STRAITS DRAIN - View of Fish and Wildlife Service dragline cleaning left side and bottom section, Sta. 489, working upstream. Note right side previously cleaned ...Citation -
CN-12-201-520NA Klamath Project. View showing control panel at the booster pump station; May 15, 1975; USBR photo by D. W. Stein
Citation -
CN-12-201-521NA Klamath Project. View of booster pumping station; May 15, 1975; USBR photo by D. W. Stein
Citation -
CN-12-201-523NA Klamath Project. View of reservoir showing outlet control structure. High water line can be seen; May 15, 1975; USBR photo by D. W. Stein
Citation -
CN-12-201-522NA Klamath Project. View showing shore line and section at reservoir; May 15, 1975; USBR photo by D. W. Stein
Citation -
CN-12-201-524NA Klamath Project. Overall view of reservoir taken from regulating tank; May 15, 1975; USBR photo by D. W. Stein
Citation -
9. [Image] Shasta View Irrigation District R&B System
CN-12-201-527NA Klamath Project. View of main pump station with surge tank and District Headquarters in background; May 15, 1975; USBR photo by D. W. SteinCitation -
CN-12-201-528NA Klamath Project. View of regulating tank; May 14, 1975; USBR photo by D. W. Stein
Citation -
11. [Image] TULE LAKE SUMP 3 - Spec. No. 200C-519
P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. SteinCitation -
12. [Image] View looking south at pole line road area
CN-12-201-506NA Klamath Project - Oregon-California. Note water seepage from irrigation. Road area approximately 12" lower than field in this area, Tulelake, California; April 1975; USBR photo by D. ...Citation -
13. [Image] Lower Klamath Lake Division
CN-12-201-554NA Klamath Project. View of irrigation ditch that will be relocated between Sta. 29 and Sta. 92 under Specs. 200C-922. Right bank area, Sta. 41+. Due to high grass and weeds, the ditch ...Citation -
P-12-200-4188NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
Citation -
15. [Image] Tule Lake Sump 2 - Q-1 Lateral, Station 13
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...Citation -
P12-200-2727 - Klamath Project - KLAMATH STRAITS DRAIN - Middle Canal Flume repair, Specs. No. 201C-3(SF). View of raised concrete walls just completed by contract. Note "slough in" caused by overflow ...
Citation -
17. [Image] Tule Lake Division - View of the 101-C-1 Drain looking north near Sta. 47, prior to relocation operations
P12-200-2742A Tule Lake Division - Klamath Project -- Oregon-California. Contractors equipment in foreground consists of a 22-B Bucyrus Erie dragline and a TD-6 dozer. George R. Stacy Contractor, Specifications ...Citation -
P12-200-2743A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; George R. Stacy Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation ...
Citation -
P12-200-2744A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; leveling of berm is in progress. George R. Stacy, Contractor Specifications No. 200C-541; ...
Citation -
20. [Image] Tule Lake Division - View showing installation of 24" Flume extension at Sta. 47+ on the N-1 Lateral
P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...Citation