Search
You searched for:
Start Over
History
Remove constraint History
Author
Stein, D.W.
Remove constraint Author: Stein, D.W.
« Previous | 1 - 100 of 551 | Next »
Search Results
-
1. [Image] Tule Lake Division - A portion of the Clear Lake Spillway looking west, taken near Sta. 1+00
P12-200-2748A Tule Lake Division - Klamath Project -- Oregon-California; May 13, 1964; Bureau of Reclamation photo by D. W. SteinCitation -
2. [Image] Bank Failure - Klamath Straits Drain
P12-200-2888A Klamath Project - Oregon-California. View looking north after repair; August 1970; Bureau of Reclamation photo by D. W. SteinCitation -
3. [Image] Bank Failure - Klamath Straits Drain
P12-200-2889A Klamath Project - Oregon-California. View of washout at Sta. 591+50, looking west; August 1970; Bureau of Reclamation photo by D. W. SteinCitation -
P-12-200-4188NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4189NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4190NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
Citation -
7. [Image] View of pipe laying operation
CN-12-201-196NA Klamath Project - Oregon-California; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
8. [Image] Lower Klamath Lake, California
CN-12-201-381NA Klamath Project - Oregon-California. View of muskrat trapper, Joe Fabianek, a former FWS employee; February 1973; Bureau of Reclamation photo by D. W.SteinCitation -
9. [Image] Shasta View Irrigation District R&B System
CN-12-201-526NA Klamath Project. View of inlet structure to main pumps; May 15, 1975; USBR photo by D. W. SteinCitation -
10. [Image] Tule Lake Sump 2 - Q-1 Lateral, Station 13
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...Citation -
P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
Citation -
12. [Image] TULE LAKE SUMP 3 - Spec. No. 200C-519
P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. SteinCitation -
P12-200-2727 - Klamath Project - KLAMATH STRAITS DRAIN - Middle Canal Flume repair, Specs. No. 201C-3(SF). View of raised concrete walls just completed by contract. Note "slough in" caused by overflow ...
Citation -
14. [Image] KLAMATH STRAITS DRAIN
P12-200-2741A- Klamath Project - KLAMATH STRAITS DRAIN - View of Fish and Wildlife Service dragline cleaning left side and bottom section, Sta. 489, working upstream. Note right side previously cleaned ...Citation -
15. [Image] Tule Lake Division - View of the 101-C-1 Drain looking north near Sta. 47, prior to relocation operations
P12-200-2742A Tule Lake Division - Klamath Project -- Oregon-California. Contractors equipment in foreground consists of a 22-B Bucyrus Erie dragline and a TD-6 dozer. George R. Stacy Contractor, Specifications ...Citation -
P12-200-2743A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; George R. Stacy Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation ...
Citation -
P12-200-2744A Tule Lake Division - Klamath Project -- Oregon-California. Excavation is completed in this area; leveling of berm is in progress. George R. Stacy, Contractor Specifications No. 200C-541; ...
Citation -
18. [Image] Tule Lake Division - View showing installation of 24" Flume extension at Sta. 47+ on the N-1 Lateral
P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...Citation -
19. [Image] Tule Lake Division - View showing the installation of Flume section which spans the 101-C-1 Drain at Sta. 47
P12-200-2746A Tule Lake Division - Klamath Project -- Oregon-California. George R. Stacy, Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation photo by D. W. SteinCitation -
P12-200-2747A Tule Lake Division - Klamath Project -- Oregon-California. C. D. Lawrence, Klamath Falls, Oregon, looking at the foundation of the spillway; May 13, 1964; Bureau of Reclamation photo by ...
Citation -
21. [Image] Tule Lake Division - View of the Clear Lake Spillway and tailrace taken near Sta. 0+00 looking east
P12-200-2749A Tule Lake Division - Klamath Project -- Oregon-California. Clear Lake Dam can be seen in the background; May 13, 1964; Bureau of Reclamation photo by D. W. SteinCitation -
P12-200-2795A Tule Lake Sumps - Klamath Project--Oregon California. View of opening cut in Q-Canal Bank just below headworks discharging controlled release of flood water from Sump 1-A to Sump 2. Water ...
Citation -
P12-200-2796A Tule Lake Sumps - Klamath Project--Oregon-California. View of opening cut in R-Canal bank about 100 feet downstream from headgate to permit controlled release of flood water from Sump ...
Citation -
P12-200-2800A Tule Lake Dike Repair - Klamath Project--Oregon-California. Fill about 2 1/2 feet. Lake W.S. El. 4035.20. Flooded lands in Sump 2 at right. Sierra Pacific Const. Co., Contractor - Specs. ...
Citation -
P12-200-2801A Tule Lake Dike Repair - Klamath Project--Oregon-California. Truck, 10 c.y. (owned and operated by Ray Hon) dumping load. Sierra Pacific Const. Co., Contractor - Specs. No. DC-6246; March ...
Citation -
P12-200-2802A Tule Lake Sump 2 - Klamath Project--Oregon-California. View from pumping Plant No. 9 looking south. Water El. 4029.17; maximum was 4029.52; March 5, 1965; Bureau of Reclamation photo by ...
Citation -
P12-200-2803A Tule Lake Dike Repair - Klamath Project--Oregon-California. Dike here about 14 feet wide. Broken "sheet piling" is remnant of original construction by lessees; March 5, 1965; Bureau of ...
Citation -
28. [Image] Tule Lake Sump 2 - Flooded lease lands
P12-200-2804A Tule Lake Sump 2 - Klamath Project--Oregon-California. View northeast from point 1/2 mile south of Q-Canal headworks showing flooded lease lands. Water on lands at El. 4029.17; March 5, ...Citation -
29. [Image] Tule Lake Sump 2 - Flooded lease lands
P12-200-2805A Tule Lake Sump 2 - Klamath Project--Oregon-California. View east from point 1/2 mile south of Q-Canal headworks showing flooded lease lands; March 5, 1965; Bureau of Reclamation photo ...Citation -
P12-200-2811A Tule Lake Reserve Sump 2 - Klamath Project-Oregon-California. View near drainage Pumping Plant No. 9; showing depth of emergency flooding of lease lands. Straw on cross members shows highest ...
Citation -
31. [Image] Tule Lake Dike Repair - View looking west
P12-200-2812A Tule Lake Dike Repair - Klamath Project - Oregon-California. View looking west shows material on Southwest Dike near Station 60 prior to spreading and compacting by Sierra Pacific Construction ...Citation -
P12-200-2813A Tule Lake Dike Repair - Klamath Project - Oregon-California. View looking east shows earth and rock in face of Borrow Area "A" near R-Canal headworks. Sierra Pacific Construction Co., ...
Citation -
P12-200-2814A Tule Lake Dike Repair - Klamath Project - Oregon - California. Shows large size rock. Sierra Pacific Construction Co., Contractor-Specs. DC-6246; March 18, 1965; Bureau of Reclamation photo ...
Citation -
P12-200-2815A Tule Lake Dike Repair - Klamath Project - Oregon - California. Lee Carpenter, Contractor's Foremen (sic), inspects fill material on "A" Dike near Station 281 prior to shaping and compacting. ...
Citation -
P12-200-2818A J-Canal Repair - Klamath Project - Oregon California. Emergency repair of damage to "J" Canal lining Specs. 200C-584, Contractor Patterson Construction Co. View near north Sta. 860+ shows ...
Citation -
P12-200-2819NA J-Canal Repair - Klamath Project - Oregon-California. View shows void under broken lining of "J" Canal about four feet downstream from washed out drain inlet where outside runoff entered ...
Citation -
P12-200-2820A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Replaceing (sic) broken ...
Citation -
P12-200-2821A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Completed section of canal lining on "J" Canal; April 6, 1965; Bureau of Reclamation ...
Citation -
P12-200-2822A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Completed storn drain inlet on "J" Canal; April 6, 1965; Bureau of Reclamation ...
Citation -
P12-200-2817A Tule Lake Dike Repair - Klamath Project - Oregon-California. View of loading operation in borrow area "D" near Fish and Wildlife Service headquarters illustrating grading of material. ...
Citation -
41. [Image] Tule Lake Dike Repair - View of oversize material from Borrow Area "B" near Q-Canal headworks
P12-200-2816A Tule Lake Dike Repair - Klamath Project - Oregon-California. Sierra Pacific Construction Co., Contractor-Specs. DC-6246; March 17, 1965; Bureau of Reclamation photo by D. W. SteinCitation -
P12-200-2823A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Contractor's workmen ...
Citation -
P12-200-2824A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Completed repair of ...
Citation -
P12-200-2825A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Completed repair of ...
Citation -
45. [Image] Flood Damage Repair in Langell Valley
P12-200-2826NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. Model LS-85 dragline reshaping overflow drain spillway ...Citation -
46. [Image] Flood Damage Repair in Langell Valley
P12-200-2827NA Flood Damage Repair in Langell Valley - Klamath Project- Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co.. Contractor's employee compacting backfill of wash ...Citation -
47. [Image] Flood Damage Repair in Langell Valley
P12-200-2828NA Flood Damage Repair in Langell Valley - Klamath Project- Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. Completed repair of wash in area on right bank of ...Citation -
48. [Image] Flood Damage Repair in Langell Valley
P12-200-2829NA Flood Damage Repair in Langell Valley - Klamath Project- Oregon - California. Wash in area Sta. 456+ on right bank of Lost River; April 30, 1965; Bureau of Reclamation photo by D. W. ...Citation -
49. [Image] Flood Damage Repair in Langell Valley
P12-200-2830NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. Contractors riprap source is basalt talus, in Sec. ...Citation -
50. [Image] Flood Damage in Langell Valley
P12-200-2831NA Flood Damage in Langell Valley - Klamath Project - Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. LS-85 dragline shaping riprap at Willow Valley Drainage ...Citation -
51. [Image] Lost River Repair
P12-200-2832A Lost River Repair - Klamath Project - Oregon - California. Contractor's men shaping riprap on left abutment of bridge at Sta. 116+50 on Lost River, Specs. 200C-591. Contractor - Patterson ...Citation -
52. [Image] Flood Damage Repair in Langell Valley
P12-200-2833A Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Contractor Patterson Construction Co., Specs. 200C-591. View showing the completed spillway, Sta. 351+. Lost ...Citation -
53. [Image] Flood Damage Repair in Langell Valley
P12-200-2834NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Completed spillway and Dike, Sta. 351+, Lost River; May 11, 1965; Bureau of Reclamation photo by D. W. ...Citation -
54. [Image] Flood Damage Repair in Langell Valley
P12-200-2836NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Linkbelt dragline excavating the bottom section of Miller Creek Channel, Sta. 8+50, looking downstream. Casting ...Citation -
55. [Image] Flood Damage Repair in Langell Valley
P12-200-2837NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. View of left side of Miller Creek Channel, Sta. 9+00, looking downstream. HD-20 dozer building up left embankment ...Citation -
P12-200-2838NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. Invitation No. 200-B-3106, Contractor - Francis D. Brown & Son, Inc. View of 102-C-1 ...
Citation -
P12-200-2839NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. 102-C-1 Drain looking south, taken from intersection of 102-D Drain. 22-B dragline with ...
Citation -
P12-200-2840NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc., Invitation No. 200-B-3106. ...
Citation -
P12-200-2841NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc. 22-B dragline excavating ...
Citation -
P12-200-2842NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Excavating silt and straw from the 102-Drain adjacent to unit No. ...
Citation -
61. [Image] Flood Damage Repair in Langell Valley
P12-200-2843A Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Specifications No. 200C-591, Contractor - Patterson Construction Co. View of completed Miller Creek Channel ...Citation -
62. [Image] Miller Creek Channel Realignment
P12-200-2844A Miller Creek Channel Realignment - Klamath Project - Oregon - California. View showing riprap area on right bank, Sta. 10+00 to 10+60; June 4, 1965; Bureau of Reclamation photo by D. ...Citation -
P12-200-2859A Klamath Project, Region 2 - Oregon-California. Hole is located on center line of tailrace area at Sta. 5+14. (Note good rock at start of hole); September 24, 1965; Bureau of Reclamation ...
Citation -
P12-200-2861A Klamath Project, Region 2 - Oregon-California. Drill set up on the downstream hole, Sta. 6+24+; September 24, 1965; Bureau of Reclamation photo by D. W. Stein
Citation -
65. [Image] Spillway Channel, Clear Lake Dam, view of the Sacramento drill crew and rig, drilling on Hole +102
P12-200-2862A Klamath Project, Region 2 - Oregon-California; September 24, 1965; Bureau of Reclamation photo by D. W. SteinCitation -
66. [Image] Hill Road, Siskiyou County, California
P12-200-2863A Klamath Project, Region 2 - Oregon-California. Contract 14-06-200-2217A. View north from point 2.5 miles south of Refuge Headquarters and showing work on fill area; September 22, 1965; ...Citation -
67. [Image] Hill Road, Siskiyou County, California
P12-200-2864A Klamath Project, Region 2 - Oregon-California. Contract 14-06-200-2217A. Roadway as completed by County at a point 0.2 miles south of Pumping Plant "D" which can be seen in the background; ...Citation -
68. [Image] Hill Road, Siskiyou County, California
P12-200-2865A Klamath Project, Region 2 - Oregon-California. Contract 14-06-200-2217A. Siskiyou County LeTourneau scraper is excavating from borrow area 0.2 miles south of Pumping Plant "D" and east of ...Citation -
69. [Image] Bank Failure - Klamath Straits Drain
P12-200-2890A Klamath Project - Oregon-California. View of draglines excavating silt and sand in drain, looking north; August 1970; Bureau of Reclamation photo by D. W. SteinCitation -
70. [Image] Bank Failure - Klamath Straits Drain
P12-200-2891A Klamath Project - Oregon-California. View showing repair of washout at Sta. 591+50, looking north; August 1970; Bureau of Reclamation photo by D. W. SteinCitation -
71. [Image] Klamath Falls, Oregon - "A" Canal Break
P12-200-2898NA - Klamath Project - Klamath Falls, Oregon - "A" Canal Break. 8:30 a.m. - View showing washout of front dike, looking down on Oak Street; January 18, 1971; Bureau of Reclamation photo by ...Citation -
72. [Image] Klamath Falls, Oregon - "A" Canal Break
P12-200-2899NA - Klamath Project - Klamath Falls, Oregon - "A" Canal Break. 8:30 a.m. - View of backhoe excavating back dike so water can run on down "A" Canal. Oak Street in background; January 18, 1971; ...Citation -
73. [Image] Klamath Falls, Oregon - "A" Canal Break
P12-200-2900NA - Klamath Project - Klamath Falls, Oregon - "A" Canal Break. 8:30 a.m. - Oak Street in background. View shows break in front dike; January 18, 1971; Bureau of Reclamation photo by D. ...Citation -
74. [Image] Klamath Falls, Oregon - "A" Canal Break
P12-200-2901NA - Klamath Project - Klamath Falls, Oregon - "A" Canal Break. 8:30 a.m. - View showing the excavation area where pipe was placed. Taken from Oak Street; January 18, 1971; Bureau of Reclamation ...Citation -
75. [Image] Klamath Falls, Oregon - "A" Canal Break
P12-200-2902NA - Klamath Project - Klamath Falls, Oregon - "A" Canal Break. 8:30 a.m. - Taken from Division Street, showing water coming down Oak Street; January 18, 1971; Bureau of Reclamation photo ...Citation -
76. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2904NA Klamath Project - Oregon-California. Overall view of pipe laying operation. Dump truck is almost empty. Fields are covered with snow; December 1972; Bureau of Reclamation photo by D. ...Citation -
77. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2905NA Klamath Project - Oregon-California. View of pipe laying operation; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
78. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2906NA Klamath Project - Oregon-California. View of Hoes trencher with dump truck behind it; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
79. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2907NA Klamath Project - Oregon-California. View of pipe laying operation. Note relationship of trenching machine to dump truck; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
80. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2908NA Klamath Project - Oregon-California. View of Hoes Gigant trencher operating in cold weather; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
81. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...Citation -
82. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...Citation -
83. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2911NA Klamath Project - Oregon-California. It bacame [sic] necessary to scrape the snow away from the front of the trenching machine because of its high flotation. The maching was unable to ...Citation -
84. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2912NA Klamath Project - Oregon-California. View of trenching machine and hopper unit being moved from a completed drain line to another field; December 1972; Bureau of Reclamation photo by ...Citation -
85. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2913NA Klamath Project - Oregon-California. Close-up view of digging chain prior to starting a new drain line. The hopper unit and trencher were backed up to an open collector drain, lowered ...Citation -
86. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2914NA Klamath Project - Oregon-California. View of trencher unit beginning a new drain line. Note plastic pipe in hopper unit. It was left there to keep chute from filling up with dirt and cinders ...Citation -
87. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2915NA Klamath Project - Oregon-California. View of operator's control panel mounted on Hoes Gigant trenching machine; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
88. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2916NA Klamath Project - Oregon-California. View of trenching equipment in operation; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
89. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...Citation -
90. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2918NA Klamath Project - Oregon-California. View of digging and hopper unit being raised out of the open trench at the end of a completed drain line; November 1972; Bureau of Reclamation photo ...Citation -
91. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2919NA Klamath Project - Oregon-California. View of pipe trenching equipment in operation; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
92. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2921NA Klamath Project - Oregon-California. Side view of trenching equipment in operation. Note how the plastic drainage tubing is stretched out in advance of the trenching machine; November ...Citation -
93. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2922NA Klamath Project - Oregon-California. View of trenching machine. Hopper unit and digging chain have been lifted out of ground; November 1972; Bureau of Reclamation photo by D. W. Stein...Citation -
94. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2923NA Klamath Project - Oregon-California. View of trenching machine starting to excavate a cutoff trench at the outlet end of a closed drain line; November 1972; Bureau of Reclamation photo ...Citation -
95. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2924NA Klamath Project - Oregon-California. View of trenching machine digging a cutoff wall; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
96. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2925NA Klamath Project - Oregon-California. Hopper and digging chain are being lowered to grade at right angles to an open collector drain prior to the start of a new closed drain line; November ...Citation -
97. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2926NA Klamath Project - Oregon-California. View of hopper unit and digging chain in position to start excavating a new closed drain line; November 1972; Bureau of Reclamation photo by D. W. ...Citation -
98. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2927NA Klamath Project - Oregon-California. Conveyor belt used to move cinders from dump truck to the hopper unit; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
99. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2928NA Klamath Project - Oregon-California. View of contractor's workers threading plastic drainage tubing into hopper unit; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
100. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2929NA Klamath Project - Oregon-California. View of small crawler tractor being used to backfill the open trench. Excavated earth, windrowed along the open trench, provides the material needed ...Citation