Search

You searched for: Start Over Land use history Remove constraint Land use history Author Stein, D.W. Remove constraint Author: Stein, D.W. Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 3811
    P12-200-2804A Tule Lake Sump 2 - Klamath Project--Oregon-California. View northeast from point 1/2 mile south of Q-Canal headworks showing flooded lease lands. Water on lands at El. 4029.17; March 5, ...
    Citation
  • 3812
    P12-200-2805A Tule Lake Sump 2 - Klamath Project--Oregon-California. View east from point 1/2 mile south of Q-Canal headworks showing flooded lease lands; March 5, 1965; Bureau of Reclamation photo ...
    Citation
  • 3806
    P12-200-2800A Tule Lake Dike Repair - Klamath Project--Oregon-California. Fill about 2 1/2 feet. Lake W.S. El. 4035.20. Flooded lands in Sump 2 at right. Sierra Pacific Const. Co., Contractor - Specs. ...
    Citation
  • 3817
    P12-200-2811A Tule Lake Reserve Sump 2 - Klamath Project-Oregon-California. View near drainage Pumping Plant No. 9; showing depth of emergency flooding of lease lands. Straw on cross members shows highest ...
    Citation
  • 5048
    CN-12-201-505NA Klamath Project - Oregon-California; April 1975; USBR photo by D. W. Stein
    Citation
  • 4813
    CN-12-201-263NA Klamath Project - Oregon-California. Overall view of borrow pit used by the contractor for road base material. Pit is also used by Modoc County under a USBR license; March 1973; Bureau ...
    Citation
  • 4820
    CN-12-201-271NA Klamath Project - Oregon-California. View of Bridge over “N” Canal, looking east. This bridge was used for hauling road material. Note 6-inch by 24-inch timbers that were used to reinforce ...
    Citation
  • 4841
    CN-12-201-291NA Klamath Project - Oregon-California. Experimental Line in Unit 71. View of fiberglass membrane covered tubing being fed into hopper unit behind trenching machine. Installation methods were ...
    Citation
  • 4918
    CN-12-201-371NA Klamath Project - Oregon-California. (Thompson Construction Company, Roseburg, Oregon, Sub-Contractor) Sub-Contractor Thompson, preparing base for the area that will be used to stockpile ...
    Citation
  • 3837
    P12-200-2828NA Flood Damage Repair in Langell Valley - Klamath Project- Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. Completed repair of wash in area on right bank of ...
    Citation
  • 3921
    P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
    Citation
  • 3928
    P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
    Citation
  • 3938
    P12-200-2927NA Klamath Project - Oregon-California. Conveyor belt used to move cinders from dump truck to the hopper unit; November 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3940
    P12-200-2929NA Klamath Project - Oregon-California. View of small crawler tractor being used to backfill the open trench. Excavated earth, windrowed along the open trench, provides the material needed ...
    Citation
  • 3947
    P12-200-2936NA Klamath Project - Oregon-California. View of a workman using a whacker to obtain the required compaction at the outlet end of the drain line; December 1972; Bureau of Reclamation photo ...
    Citation
  • 4181
    P-12-200-4072NA Klamath Project - Oregon-California. View of backfilling 10 foot cut-off trench at Sta. 50±, looking north. A small John Deere dozer was used to backfill. Note water in trench; September ...
    Citation
  • 4242
    P-12-200-4160NA Klamath Project - Oregon-California. View of walkway installation at 36" CMP input, Sta. 51+90, left. Laborer using an earth wacker to drive sheet piling. Method seems to work but driver ...
    Citation
  • 4291
    P-12-200-4209NA Klamath Project - Oregon-California. D-8 Dozer ripping material to be used for sub-base material in constructing road on west bank of Drain. Material is very tight. Pit is located ...
    Citation
  • 4727
    CN-12-201-180NA Klamath Project - Oregon-California. View showing string line and pointers used to maintain grade; October 11, 1972; Bureau of Reclamation photo by D. W.Stein
    Citation
  • 4732
    CN-12-201-184NA Klamath Project - Oregon-California. Side view of the hopper unit used to feed both pipe and cinders into the trench. The digging chain for the trencher is mounted directly in front of ...
    Citation
  • 4772
    CN-12-201-223NA Klamath Project - Oregon-California. View showing trailer that was used to string pipe ahead of trenching operations. As the truck drove forward, the pipe simply un-reeled itself; November ...
    Citation
  • 4787
    CN-12-201-239NA Klamath Project - Oregon-California. The contractor moved several CMP culverts, which were apparently used by the lessees and stored in the drain, in order to fill the drain. Most drains ...
    Citation
  • 4788
    CN-12-201-240NA Klamath Project - Oregon-California. In filling drains along the north-south road, it was necessary to rip up the surface of the road for material to fill the adjacent open drain. This ...
    Citation
  • 4797
    CN-12-201-249NA Klamath Project - Oregon-California. Close-up view of Laser Beam command post showing adjustment screws. The head is leveled in the same manner that a theodolite is leveled. The crank ...
    Citation
  • 4799
    CN-12-201-251NA Klamath Project - Oregon-California. View of Laser Beam command post controls. Note the two bubbles used for leveling the apparatus. The dial is to set the beam on the desired slope; December ...
    Citation
  • 4814
    CN-12-201-264NA Klamath Project - Oregon-California. View of DW-20 scraper hauling road base material from the USBR pit at the south end of Sump 1-A. Owing to their large capacity (25 c.y.) and resultant ...
    Citation
  • 4846
    CN-12-201-296NA Klamath Project - Oregon-California. Experimental Line in Unit 71. Connection to the steel outlet pipe was made in the same manner as with the unsheathed tubing. Plastic tape is used to ...
    Citation
  • 4897
    CN-12-201-350NA Klamath Project - Oregon-California. View of driller using #CP-55 drill to drill for grouting crest area of spillway; December 1973; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4899
    CN-12-201-353NA Klamath Project - Oregon-California. Grouting spillway area. Hookup shows a 7 foot packer being used; December 1973; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4904
    CN-12-201-358NA Klamath Project - Oregon-California. View of spillway, looking west. 4-Ton wrecking ball being used to break off concrete which has previously been drilled on 8-inch centers. View also ...
    Citation
  • 4906
    CN-12-201-359NA Klamath Project - Oregon-California. View of spillway, looking west. 4-Ton wrecking ball being used to break off concrete which has previously been drilled on 8-inch centers. View also ...
    Citation
  • 4920
    CN-12-201-372NA Klamath Project - Oregon-California. View showing stockpiled sand and aggregate to be used for the manufacture of the concrete of spillway; February 1974; Bureau of Reclamation photo by ...
    Citation
  • 4921
    CN-12-201-374NA Klamath Project - Oregon-California. View of spillway area, looking west. Note ramp that was used to haul broken rock out of channel area; February 1974; Bureau of Reclamation photo by ...
    Citation
  • 4924
    CN-12-201-376NA Klamath Project -Oregon-California. (Thompson Construction Company, Roseburg, Oregon - Sub-Contractor). Completed forms to be used for spillway crest; February 1974; Bureau of Reclamation ...
    Citation
  • 3993
    P-12-200-2981NA Klamath Project - Oregon-California. View showing contractor dozing up surface rock along edge of water to be used as riprap on small dike; May 1974; Bureau of Reclamation photo by D. ...
    Citation
  • 3994
    P-12-200-2982NA Klamath Project - Oregon-California. View shoing [sic] tractor dozing up surface rock along edge of water to be used as riprap on dike; May 1974; Bureau of Reclamation photo by D. W. ...
    Citation
  • 4004
    P-12-200-2992NA Klamath Project - Oregon-California. D-8 Dozer is shown stripping borrow area. Material from this source was used to construct the dike; May 1974; Bureau of Reclamation photo by D. W. ...
    Citation
  • 4015
    P-12-200-3003NA Klamath Project - Oregon-California. View of spillway looking west. The dragline shown was utilized to place the concrete used in the spillway slabs; May 1974; Bureau of Reclamation photo ...
    Citation
  • 4031
    P-12-200-3023NA Klamath Project - Oregon-California. View of equipment used to drill the drainage holes. A Chicago Pneumatic #55 drill was mounted on the side of a 977-K Loader bucket; July 1974; USBR ...
    Citation
  • 4033
    P-12-200-3025NA Klamath Project - Oregon-California. View of contractor's men and equipment drilling a drainage hole in spillway crest area. A #55 Chicago pneumatic drill was used for this work; July ...
    Citation
  • 4046
    P-12-200-3033NA Klamath Project - Oregon-California. View of borrow area before borrowing operations were begun. The borrow was used as rock backfill. Bill Long, Contractor's foreman, is in background; ...
    Citation
  • 4047
    P-12-200-3034NA Klamath Project - Oregon-California. View of borrow area before borrowing operations were begun. The borrow area was used as rock backfill. Bill Long, foreman, is in background; July ...
    Citation
  • 4052
    P-12-200-3039NA Klamath Project - Oregon-California. View of equipment used to place concrete in right protective slab under bridge; July 1974; USBR photo by D. W. Stein
    Citation
  • 4076
    P-12-200-3063NA Klamath Project - Oregon-California. View of cinder borrow pit area. Homemade shaker with 3" screen, screening out oversized material from material to be used as envelope around closed ...
    Citation
  • 4096
    P-12-200-3083NA Klamath Project - Oregon-California. View of small screening plant and loader, at Turkey Hill borrow pit, screening out the 3" oversize from the cinder material to be used as envelope ...
    Citation
  • 4547
    P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
    Citation