Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Stein, D.W. Remove constraint Author: Stein, D.W. Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California)

Search Results

  • 3427
    P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. Stein
    Citation
  • 3425
    P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...
    Citation
  • 3802
    P12-200-2795A Tule Lake Sumps - Klamath Project--Oregon California. View of opening cut in Q-Canal Bank just below headworks discharging controlled release of flood water from Sump 1-A to Sump 2. Water ...
    Citation
  • 3803
    P12-200-2796A Tule Lake Sumps - Klamath Project--Oregon-California. View of opening cut in R-Canal bank about 100 feet downstream from headgate to permit controlled release of flood water from Sump ...
    Citation
  • 3426
    P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
    Citation
  • 3848
    P12-200-2838NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. Invitation No. 200-B-3106, Contractor - Francis D. Brown & Son, Inc. View of 102-C-1 ...
    Citation
  • 3849
    P12-200-2839NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. 102-C-1 Drain looking south, taken from intersection of 102-D Drain. 22-B dragline with ...
    Citation
  • 3850
    P12-200-2840NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc., Invitation No. 200-B-3106. ...
    Citation
  • 3851
    P12-200-2841NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc. 22-B dragline excavating ...
    Citation
  • 3852
    P12-200-2842NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Excavating silt and straw from the 102-Drain adjacent to unit No. ...
    Citation