1. [Image] Sealing, Repair and Modification of Gerber Dam -Specs. 200C-888 - Dante Engineers & Contractors
CN-12-201-578NA Klamath Project - Oregon-California. View of downstream face of Gerber Dam. Note new footbridge in foreground. Note water flowing over rock weir which was constructed under this specification ...Citation -
2. [Image] Sealing, Repair and Modification of Gerber Dam -Specs. 200C-888 - Dante Engineers & Contractors
CN-12-201-579NA Klamath Project - Oregon-California. View of polyurethane coating peeling off of ogee spillway crest of Gerber Dam; June 1974; USBR photo by T. J. RostenCitation -
3. [Image] Sealing, Repair and Modification of Gerber Dam -Specs. 200C-888 - Dante Engineers & Contractors
CN-12-201-580NA Klamath Project - Oregon-California. View of polyurethane coating on ogee spillway crest of Gerber Dam. Note that coating is separating from concrete in center of picture; June 1974; USBR ...Citation -
4. [Image] View of high sealer drilling anchor bolt holes with jack hammer in downstream face of Gerber Dam
CN-12-201-581NA Klamath Project - Oregon-California. Anchor bolts were embedded in holes to secure drilling platform to face of dam as part of core drilling operations; September 1969; USBR photo by T. ...Citation -
5. [Image] View of right abutment of Gerber Dam
CN-12-201-584NA Klamath Project - Oregon-California. Note tripod used by drill crew in obtaining core samples of foundation material. Samples were obtained as part of Safety of Dams review; September ...Citation -
CN-12-201-582NA Klamath Project - Oregon-California; September 1969; USBR photo by T. J. Rosten
Citation -
CN-12-201-583NA Klamath Project - Oregon-California; September 1969; USBR photo by T. J. Rosten
Citation -
8. [Image] Another view of right abutment of Gerber Dam
CN-12-201-586NA Klamath Project - Oregon-California; September 1969; USBR photo by T. J. RostenCitation -
9. [Image] View of right abutment of Gerber Dam
CN-12-201-585NA Klamath. Project - Oregon-California; September 1969; USBR photo by T. J. RostenCitation -
10. [Image] Gerber Watershed - Klamath Project, Oregon
CN-12-200-23A Gerber Watershed - Klamath Project, Oregon. Earthfill dam and spillway constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. This is another view of the reservoir ...Citation -
CN-12-200-32A Gerber Watershed - Klamath Project, Oregon-California. View of one of many check dams in spreader area. This particular check dam is located on the upper ditch that follows the ridge top ...
Citation -
CN-12-200-35A Gerber Watershed - Klamath Project, Oregon-California. Looking northeast of the approach channel to Wildhorse Diversion Dam from the top of the headgate to Wildhorse Diversion Channel. The ...
Citation -
CN-12-201-587NA Klamath Project - Oregon-California. This road was constructed to accommodate core drilling operations; September 1969; USBR photo by T. J. Rosten
Citation -
14. [Image] Gerber Watershed - Klamath Project, Oregon
CN-12-200-22A. Gerber Watershed - Klamath Project, Oregon. Earthfill dam and reservoir constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. Earth spillway is located at left ...Citation -
CN-12-200-28A Gerber Watershed - Klamath Project, Oregon - California. View of Round Valley Reservoir, looking southwest from top of dam. Note -- water has filled the approach channel to the outlet works. ...
Citation -
CN-12-200-37A Gerber Watershed - Klamath Project, Oregon-California. Looking easterly at Gerber Reservoir from top of Gerber Dam. Note that the boat dock located at the far end of the water area in the ...
Citation -
CN-12-201-573NA Klamath Project - Oregon-California. View of spillway during construction. Contractor's men are sack rubbing the rough areas of the concrete wall; June 26, 1974; USBR photo by T. J. Ro...
Citation -
CN-12-201-574NA Klamath Project - Oregon-California. View of spillway under construction; June 26, 1974; USBR photo by T. J. Rosten
Citation -
CN-12-201-575 and 576 - Klamath Project - Oregon-California. View of men and equipment drilling drainage holes in concrete spillway slab; June 26, 1974; USBR photos by T. J. Rosten
Citation -
CN-12-201-575 and 576 - Klamath Project - Oregon-California. View of men and equipment drilling drainage holes in concrete spillway slab; June 26, 1974; USBR photos by T. J. Rosten
Citation -
CN-12-201-572NA Klamath Project - Oregon-California. View of spillway under construction. The reinforcing steel is part of the concrete wall which will be constructed at right end of spillway; June 1974; ...
Citation -
CN-12-201-577NA Klamath Project - Oregon-California. View of newly constructed Clear Lake dike. Dike was constructed under Specifications No. 200C-889. Note road ramp over dike; June 1974; USBR photo ...
Citation -
23. [Image] Gerber Watershed - Klamath Project, Oregon
CN-12-200-27A Gerber Watershed - Klamath Project, Oregon. Stock-pond – pit-type – constructed by BLM in the summer of 1968. This pond is located in the NE1/4 of Sec. 14, T. 39 S., R. 14 E, W.M. This is ...Citation -
CN-12-200-34A Gerber Watershed - Klamath Project, Oregon-California. Upstream view of Wild Horse Diversion Channel headgate. Note -- stoplogs must be placed in stoplog slots to prevent water from entering ...
Citation -
25. [Image] Gerber Watershed - Klamath Project, Oregon
CN-12-200-19A. Stock pond rehabilitated by the Bureau of Land Management during summer of 1968. This stock pond is located in the SE1/4SE14 of Sec. 26, T. 38 S., R. 13 E., W.M. The overall dimensions ...Citation