Search

Search Results

  • 5175
    CN-12-200-19A. Stock pond rehabilitated by the Bureau of Land Management during summer of 1968. This stock pond is located in the SE1/4SE14 of Sec. 26, T. 38 S., R. 13 E., W.M. The overall dimensions ...
    Citation
  • 5176
    CN-12-200-20A. Gerber Watershed - Klamath Project, Oregon. Small reservoir excavated by BLM, during 1968, in a wet weather seep near Wagon Wheel Springs. This reservoir is located in the SW1/4NE1/4 of ...
    Citation
  • 5178
    CN-12-200-22A. Gerber Watershed - Klamath Project, Oregon. Earthfill dam and reservoir constructed by BLM across a draw in the NE1/4 of Sec. 10, T. 39 S., R. 14 E, W.M. Earth spillway is located at left ...
    Citation