    KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
    Citation
  • 3586
    KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
    Citation
  • 3587
    KP-2571-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Hancock Elevating Scraper, 8 cu. yd. capacity with sideboards, placing canal lining at Station 29+50, R-Canal; ...
    Citation
  • 3588
    KP-2572-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. John Deere tractor, Model A, pulling a 10-ton pneumatic roller to compact canal lining, Station 29+50, R-Canal; ...
    Citation
  • 3665
    KP-2593-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "W". View looking southwest into inlet channel of Pumping Plant "W". Plant is irrigating the southwest corner ...
    Citation
  • 3656
    KP-2584-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5307, R-Canal. R-Canal headworks showing gate lifts and inlet channel; January 18, 1961; Photo by John A. Renning
    Citation
  • 3571
    KP-2555-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. 10 cubic yard scraper and TD-14 tractor placing lining in left bank lateral, Station 1+00; July 29, 1960; ...
    Citation
  • 3580
    KP-2564-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking downstream from Station 5+00. Bottom width 10 feet, height of canal banks, ...
    Citation
  • 3581
    KP-2565-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking upstream from Station 48+00. Bottom width, 10 feet; height of canal banks, ...
    Citation
  • 3582
    KP-2566-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Q-Canal - Specifications DC-5248. Prefabricated metal farm turnout inlet with well for flow measurement; September 21, 1960; Photo by John A. Re...