Search

You searched for: Start Over Development Remove constraint Development Author Portland State University. Population Research Center Remove constraint Author: Portland State University. Population Research Center Database PDX Scholar Remove constraint Database: PDX Scholar

Search Results

  • This document is to accompany the coordinated population forecasts and their corresponding reports prepared by the Population Research Center (PRC). Developing long-term coordinated population forecasts ...
    Citation
  • The Hillsboro School District (HSD) has experienced enrollment growth throughout the 1990s and 2000s. This report presents the results of a forecast conducted by the Portland State University Population ...
    Citation
  • The Tigard-Tualatin School District (TTSD) enrolled 12,460 students in Fall 2007, an increase of 153 students (1.2 percent) from Fall 2006. Growth was concentrated in the secondary grades, with increases ...
    Citation
  • This report presents the results of a study conducted by the Population Research Center (PRC) to address the long-range planning needs of the Gresham-Barlow School District (“District”). It provides annual ...
    Citation
  • The Tigard-Tualatin School District (TTSD) enrolled 12,300 students in Fall 2006, an increase of 167 students (1.4 percent) from Fall 2005. Growth was concentrated in the elementary grades (K-5), which ...
    Citation
  • The Forest Grove School District (FGSD) enrolled 6,102 students in Fall 2006, an increase of 175 students (3.0 percent) from Fall 2005. Growth was concentrated in the high school grades (9-12), which grew ...
    Citation
  • The Tri-City Service District (TCSD) and Clackamas County Service District #1 (CCSD #1), both of Clackamas County, requested that the Population Research Center (PRC) at Portland State University produce ...
    Citation
  • This report presents the results of a study conducted by the Portland State University Population Research Center (PRC) concluding that the District should expect enrollment growth in the long run, although ...
    Citation
  • The Tigard-Tualatin School District (TTSD) enrolled 12,595 students in Fall 2008, an increase of 135 students (1.1 percent) from Fall 2007. Growth was concentrated in elementary and middle grades, with ...
    Citation
  • The Amity School District (ASD) experienced enrollment growth during the late 1980s and early 1990s, but reached a peak of 945 K-12 students in Fall 1994. In the 12 years that followed, enrollment fell ...
    Citation