C12-200-2706 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. Recently-discovered crack in bottom of N-1 Lateral. View looking upstream near Sta. 102. Lateral was in use during ...
Citation -
P12-200-2714 - Klamath Project - TULE LAKE SUMP 2 - View east across Q canal showing dust storm; March 28, 1963; Photo by C. D. Lawrence
Citation -
3. [Image] DAMAGED OLENE FLUME
P12-200-2723 - Klamath Project - DAMAGED OLENE FLUME - Looking up at north side of flume where dynamite blast of May 11 has torn large holes; May 11, 1963; Photo by C. D. LawrenceCitation -
4. [Image] DAMAGED OLENE FLUME
P12-200-2724 - Klamath Project - DAMAGED OLENE FLUME - Looking up at bottom of flume. Note torn metal folded back by terrific force of blast; May 11, 1963; Photo by C. D. LawrenceCitation -
P12-200-2703 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-12-a Lateral. View of new lateral looking upstream (north) from Sta. 104+50; January 8, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2704 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-a Lateral. View of N-15-a Lateral in final stage of construction. Looking upstream (east) near check at Sta. 40; January 8, ...
Citation -
P12-200-2705 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-b Lateral. Final stage of construction looking downstream (west) near Sta. 38; January 8, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2707 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. View of berm and drain adjacent to cracked section of lateral. Note no significant evidence of movement or uplift ...
Citation -
P12-200-2708 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. North face of trench at Station 102+70; February 7, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2709 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. South face of trench at Station 105+00; February 7, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2710 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. View of water standing on lining directly over crack four days after storm of February 1-3, 1963. Note ...
Citation -
P12-200-2711 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 82. View looking east showing trimmed side slopes and bottom section; March 12, 1963; Photo by C. D. Lawr...
Citation -
P12-200-2712 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 55. View looking east showing fill machine placed. Gradall machine in background trimming side slopes and ...
Citation -
P12-200-2713 - Klamath Project - TULE LAKE SUMP 2 - Specifications. No. 200C-519 - Q-2 Lateral. View looking east showing lateral being filled for first time after raising banks; March 28, 1963; Photo ...
Citation -
15. [Image] DAMAGED OLENE FLUME
P12-200-2725 - Klamath Project - DAMAGED OLENE FLUME - View inside 10' diameter semi-circular section looking east in direction of flow. Note several sheet metal sections and the joins were displaced by ...Citation -
16. [Image] DAMAGED OLENE FLUME
P12-200-2726 - Klamath Project - DAMAGED OLENE FLUME - View from deck looking down, about 35° from vertical, upon hole torn in 14 gage galvanized steel flume section. Opening torn by dynamite blast is ...Citation -
17. [Image] Klamath River - View of Klamath River Channel immediately downstream from Keno Regulating Dam
P12-200-2779A Klamath River - Klamath Project--Oregon. View of Klamath River Channel immediately downstream from Keno Regulating Dam, showing relatively flat grade between upper and lower rock reef sections. ...Citation -
P12-200-2780A Klamath River - Klamath Project--Oregon. View of Klamath River upstream from Keno Regulating Dam, showing noticeable riffle in water surface at narrow section near boom anchor cribs which ...
Citation -
P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
Citation -
20. [Image] Klamath River - Employees of M-K Co. placing explosive in middle reach of by-pass channel
P12-200-2792A Klamath River - Klamath Project--Oregon. Channel is to be 12 feet deep, about two thirds in rock. River channel is at right of picture. Note dewatering pump in far background; March 3, ...Citation