Search

You searched for: Start Over Dams Remove constraint Dams Author Lawrence, C.D. Remove constraint Author: Lawrence, C.D.

Search Results

  • 5206
    CN-12-200-53A Klamath Project, Oregon-California. View of core drilling platform being lowered into desired position above gate house. Platform was moving when the picture was taken; October 1969; Bureau ...
    Citation
  • 3494
    P12-200-2779A Klamath River - Klamath Project--Oregon. View of Klamath River Channel immediately downstream from Keno Regulating Dam, showing relatively flat grade between upper and lower rock reef sections. ...
    Citation
  • 3495
    P12-200-2780A Klamath River - Klamath Project--Oregon. View of Klamath River upstream from Keno Regulating Dam, showing noticeable riffle in water surface at narrow section near boom anchor cribs which ...
    Citation
  • 4974
    CN 12-201-428NA Klamath Project - Oregon-California. Link River Dam appears at the right of the photo and the Fremont Bridge in the center of the photo; October 1973; USBR photo by C. D. Lawrence
    Citation
  • 5211
    CN-12-200-57A Klamath Project, Oregon-California. View showing connection of knee brace to butt plate. (Bolts supporting butt plate were grouted into place); October 1969; Bureau of Reclamation photo ...
    Citation
  • 5213
    CN-12-200-60A Klamath Project, Oregon-California. The driller and his helper are adding an extension to drill bit. Pictured from left to right are: Angelo Doveri, owner-operator of hydraulic crane (at ...
    Citation
  • 5214
    CN-12-200-61A Klamath Project, Oregon-California. View showing John Fisher, Klamath Project, (left), and helper attaching butt plates to grouted anchor bolts. The platform when lowered will be connected ...
    Citation
  • 3434
    P12-200-2729 - Klamath Project - GERBER RESERVOIR - View looking northeast across nearly completed campsite one mile north of Gerber Dam. Work being done by BLM; June 20, 1963; Photo by C. D. Lawrence
    Citation
  • 3436
    P12-200-2731 - Klamath Project - GERBER RESERVOIR - View southeast across present temporary boat dock about 500 feet upstream from Gerber Dam; June 20, 1963; Photo by C. D. Lawrence
    Citation
  • 3801
    P12-200-2794A Klamath River - Klamath Project--Oregon. Trench is to drain overburden to facilitate excavation; March 3, 1965; Bureau of Reclamation photo by C. D. Lawrence
    Citation