You searched for: Start Over Floods Remove constraint Floods Author Kline, D.J. Remove constraint Author: Kline, D.J.

Search Results

  • 4501
    P12-201-4419 NA Klamath Project, OR-CA. Flooding of Horsley land northwest of Plants E and EE. Dike built by rancher west of Plant EE. High water due to rancher flooding his field for quackgrass control. ...
    Citation
  • 4378
    P-12-201-4297 NA Klamath Project, OR-CA. Work begins on dike to pretect (sic) jobsite from flooding in event pumping plants should shut off, causing Kl. Straits Drain to rise. Overall view of excavation ...
    Citation
  • 4392
    P12-201-4311 NA Klamath Project, OR-CA. Center Canal - backflooding against 48" slide gate, causing gate to unseat and allowed flooding of flume inlet transition; January 17, 1977; USBR photo by D. J. ...
    Citation
  • 4393
    P12-201-4312 NA Klamath Project, OR-CA. Center Canal - existing flume outlet, where flooding exited after flowing down entire length of existing flume and flowing into flume pier excavation; January 17, ...
    Citation
  • 4395
    P12-201-4314 NA Klamath Project, OR-CA. Center Canal - Contractor placed electric pump to remove flood water from flume inlet transition; January 17, 1977; USBR photo by D. J. Kline
    Citation
  • 4396
    P12-201-4315 NA Klamath Project, OR-CA. Dewatering well discharge PVC pipe broke at top of the well causing overnight flooding, with this result to Pumping Plant EE excavation; January 17, 1977; USBR photo ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4648
    P12-201-4566NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as shown to fill 84" RCP prior to testing 84" CMP; April 6, 1978; USBR photo ...
    Citation
  • 4649
    P12-201-4567NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon outlet transition wa also flooded prior to CMP test as shown; April 6, 1978; USBR photo by D.J. Kline
    Citation
  • 4652
    P12-201-4570NA Klamath Project, OR-CA. Pumping Plant EE. Bucyrus Erie 22-B dragline excavating drain inlet to Plant EE. Note inlet was flooded prior to connecting drain to pumping plant; April 11, ...
    Citation