Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J.

Search Results

  • 4713
    P12-201-4631NA Klamath Project, OR-CA. Same as Nos. 4629 and 4630 above. Work being done by T.I.D.; March 16, 1979; USBR photo by D.J. Kline
    Citation
  • 4559
    P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
    Citation
  • 4560
    P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
    Citation
  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
    Citation
  • 4562
    P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
    Citation
  • 4563
    P12-201-4481 NA Klamath Project, OR-CA. Picture shows area where PP 'E' bridge will be constructed over outlet transition. View taken from west side of KSD, looking east; November 15, 1977; USBR photo ...
    Citation
  • 4564
    P12-201-4482 NA Klamath Project, OR-CA. View of inlet transition interior. Note: Walls were partially formed. Contractor covering up to prevent further amounts of snow from getting into formed walls; ...
    Citation
  • 4565
    P12-201-4483 NA Klamath Project, OR-CA. A 7" inch snow cover envelops PP 'FF'. View from front of pumping plant looking west; November 21, 1977; USBR photo by D.J. Kline
    Citation
  • 4566
    P12-201-4484 NA Klamath Project, OR-CA. Overall view downstream of PP 'FF'. Note concrete placement operation; Nov. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4567
    P12-201-4485 NA Klamath Project, OR-CA. View of PP 'FF' inlet to siphon transition looking from outlet structure west; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4568
    P12-201-4486 NA Klamath Project, OR-CA. Placement of PP 'FF' inlet transition to siphon; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4569
    P12-201-4487 NA Klamath Project, OR-CA. Same as photo 4486NA above; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4570
    P12-201-4488 NA Klamath Project, OR-CA. Picture taken of RHC 1/4" steel plate to be used as a bulkhead in CMP "84" hydrostatic test. This one to be inserted in round CMP to concrete transition west of ...
    Citation
  • 4571
    P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
    Citation
  • 4572
    P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4573
    P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4574
    P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4575
    P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4576
    P12-201-4494 NA Klamath Project, OR-CA. Preparation of 84" RCP pipe bedding. Total depth 2' consisting of 1 to 1.5 foot of 3" minus rock and 1' to 6" of 3/4 minus material with a large percentage of fines. ...
    Citation
  • 4577
    P12-201-4495 NA Klamath Project, OR-CA. Concrete placement of PP FF inlet to siphon structure. Looking from west at oulet end; November 30, 1977; USBR photo by D.J. Kline
    Citation
  • 4578
    P12-201-4496 NA Klamath Project, OR-CA. Crossing completed and 3500 on its way to PP FF; Nov. 28, 1977; USBR photo by D.J. Kline
    Citation
  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4580
    P12-201-4498 NA Klamath Project, OR-CA. Pumping Plant FF -- Cat 225 backhoe finishing up access road into trench for 84" RCP; Dec. 1, 1977; USBR photo by D.J. Kline
    Citation
  • 4581
    P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
    Citation
  • 4582
    P12-201-4500 NA Klamath Project, OR-CA. Ady Canal -- Siphon forming going up for round to square transition on outlet of 84" CMP. Bulkhead in background is for shoring tunnel exit from under SP RR tracks; ...
    Citation
  • 4583
    P12-201-4501 NA Klamath Project, OR-CA. Center Canal Flume -- Photo shows crack on floor joint of flume after cleanup. These were dried using propane heaters overnight prior to repairs. These joint openings ...
    Citation
  • 4584
    P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
    Citation
  • 4585
    P12-201-4503 NA Klamath Project, OR-CA. Center Canal Flume -- Curing tent used in repair of joint (photos 4501NA & 4502NA of flume repairs). Also shows location of this joint in relation to flume wooden ...
    Citation
  • 4586
    P12-201-4504 NA Klamath Project, OR-CA. Center Canal Flume -- Repaired joint shown in previous photos. Used a 6" neoprene waterstop and a 3 part PRC sealer. Also drilled 3/4" anchors on 6" alternating ...
    Citation
  • 4587
    P12-201-4505 NA Klamath Project, OR-CA. Center Canal Flume -- View of second repaired joint where slope walls join vertical walls. This was repaired the same as the first joint; January 12, 1978; USBR ...
    Citation
  • 4588
    P12-201-4506 NA Klamath Project, OR-CA. Center Canal Flume -- View of floor and south wall looking down at the joint between the new and old portions of the flume. This joint was repaired using a rubber ...
    Citation
  • 4589
    P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
    Citation
  • 4590
    P12-201-4508 NA Klamath Project, OR-CA. Center Canal Flume -- View looking SE at outlet area of Center Canal Flume after second dewatering was removed and after flume repairs were completed; January 13, ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4592
    P12-201-4510 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows north wall of siphon inlet transition after compacted backfill operations were approximately 50% completed. Note plastic covering ...
    Citation
  • 4593
    P12-201-4511 NA Klamath Project, OR-CA. Pumping Plant FF -- View of inlet to siphon at Plant FF; January 27, 1978; USBR photo by D.J. Kline
    Citation
  • 4594
    P12-201-4512 NA Klamath Project, OR-CA. Ady Canal -- View of siphon round to square transition at the outlet west of the SP RR embankment. Photo shows cribbing and reinforcement prior to removal before ...
    Citation
  • 4595
    P12-201-4513 NA Klamath Project, OR-CA. Ady Canal -- View of west bank of SP RR after outler (sic) layer of cribbing and reinforcement were removed. It was deemed unsafe to remove anymore of this cribbing. ...
    Citation
  • 4596
    P12-201-4514 NA Klamath Project, OR-CA. Ady Canal -- Note tunnel liner plate extending past tunnel under railroad. Note cemented joint between CMP and round to square transition of siphon. Also note 2 ...
    Citation
  • 4597
    P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
    Citation
  • 4598
    P12-201-4516 NA Klamath Project, OR-CA. Ady Siphon -- This view looking from west to east into siphon outlet. Note SP railroad tracks across top of photo. At this point, concrete placement on slab portion ...
    Citation
  • 4599
    P12-201-4517 NA Klamath Project, OR-CA. Pumping Plant FF -- View of surface damage to 2,500 volt primary controller. This damage apparently took place during shipment from the east coast; February 28, ...
    Citation
  • 4600
    P12-201-4518 NA Klamath Project, OR-CA. Pumping Plant FF -- View of surface damage to 2,500 volt primary controller. This damage apparently took place during shipment from the east coast; February 28, ...
    Citation
  • 4601
    P12-201-4519 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows spoils from excavation for inlet to Plant FF; February 28, 1978; USBR photo by D.J. Kline
    Citation
  • 4602
    P12-201-4520 NA Klamath Project, OR-CA. Ady Siphon -- View of south wall of siphon inlet transition and portion of backfill over 84-inch RCP; February 28, 1978; USBR photo by D.J. Kline
    Citation
  • 4603
    P12-201-4521 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc excavating inlet to plant FF. Note Plant F on right side of photo; March 2, 1978; USBR photo by D.J. Kline
    Citation
  • 4604
    P12-201-4522 NA Klamath Project, OR-CA. Pumping Plant FF - Photo showing inlet to plant FF. Note riprap placement. Trash racks are covered for the dual purpose of heat retention to aid in curing freshly ...
    Citation
  • 4605
    P12-201-4523 NA Klamath Project, OR-CA. Plant FF No. 3 bay, between elev. A and B decks. Note effect of cleanup and also newly painted exterior surfaces of pump bowl and lower column; March 3, 1978; USBR ...
    Citation
  • 4606
    P12-201-4524 NA Klamath Project, OR-CA. Pumping Plant FF -- Same as previous photo, except this view is of Plant FF, Bay # 2; March 3, 1978; USBR photo by D.J. Kline
    Citation
  • 4607
    P12-201-4525 NA Klamath Project, OR-CA. Pumping Plant FF -- Same as previous photos, except this view is of Plant FF, Bay # 1; March 3, 1978; USBR photo by D.J. Kline
    Citation