    P12-201-4631NA Klamath Project, OR-CA. Same as Nos. 4629 and 4630 above. Work being done by T.I.D.; March 16, 1979; USBR photo by D.J. Kline
    Citation
  • 4559
    P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
    Citation
  • 4560
    P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
    Citation
  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
    Citation
  • 4562
    P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
    Citation
  • 4563
    P12-201-4481 NA Klamath Project, OR-CA. Picture shows area where PP 'E' bridge will be constructed over outlet transition. View taken from west side of KSD, looking east; November 15, 1977; USBR photo ...
    Citation
  • 4564
    P12-201-4482 NA Klamath Project, OR-CA. View of inlet transition interior. Note: Walls were partially formed. Contractor covering up to prevent further amounts of snow from getting into formed walls; ...
    Citation
  • 4565
    P12-201-4483 NA Klamath Project, OR-CA. A 7" inch snow cover envelops PP 'FF'. View from front of pumping plant looking west; November 21, 1977; USBR photo by D.J. Kline
    Citation
  • 4566
    P12-201-4484 NA Klamath Project, OR-CA. Overall view downstream of PP 'FF'. Note concrete placement operation; Nov. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4567
    P12-201-4485 NA Klamath Project, OR-CA. View of PP 'FF' inlet to siphon transition looking from outlet structure west; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4568
    P12-201-4486 NA Klamath Project, OR-CA. Placement of PP 'FF' inlet transition to siphon; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4569
    P12-201-4487 NA Klamath Project, OR-CA. Same as photo 4486NA above; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4570
    P12-201-4488 NA Klamath Project, OR-CA. Picture taken of RHC 1/4" steel plate to be used as a bulkhead in CMP "84" hydrostatic test. This one to be inserted in round CMP to concrete transition west of ...
    Citation
  • 4571
    P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
    Citation
  • 4572
    P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4573
    P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4574
    P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4575
    P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4576
    P12-201-4494 NA Klamath Project, OR-CA. Preparation of 84" RCP pipe bedding. Total depth 2' consisting of 1 to 1.5 foot of 3" minus rock and 1' to 6" of 3/4 minus material with a large percentage of fines. ...
    Citation
  • 4577
    P12-201-4495 NA Klamath Project, OR-CA. Concrete placement of PP FF inlet to siphon structure. Looking from west at oulet end; November 30, 1977; USBR photo by D.J. Kline
    Citation
  • 4578
    P12-201-4496 NA Klamath Project, OR-CA. Crossing completed and 3500 on its way to PP FF; Nov. 28, 1977; USBR photo by D.J. Kline
    Citation
  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4580
    P12-201-4498 NA Klamath Project, OR-CA. Pumping Plant FF -- Cat 225 backhoe finishing up access road into trench for 84" RCP; Dec. 1, 1977; USBR photo by D.J. Kline
    Citation
  • 4581
    P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
    Citation
  • 4582
    P12-201-4500 NA Klamath Project, OR-CA. Ady Canal -- Siphon forming going up for round to square transition on outlet of 84" CMP. Bulkhead in background is for shoring tunnel exit from under SP RR tracks; ...
    Citation
  • 4583
    P12-201-4501 NA Klamath Project, OR-CA. Center Canal Flume -- Photo shows crack on floor joint of flume after cleanup. These were dried using propane heaters overnight prior to repairs. These joint openings ...
    Citation
  • 4584
    P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
    Citation
  • 4585
    P12-201-4503 NA Klamath Project, OR-CA. Center Canal Flume -- Curing tent used in repair of joint (photos 4501NA & 4502NA of flume repairs). Also shows location of this joint in relation to flume wooden ...
    Citation
  • 4586
    P12-201-4504 NA Klamath Project, OR-CA. Center Canal Flume -- Repaired joint shown in previous photos. Used a 6" neoprene waterstop and a 3 part PRC sealer. Also drilled 3/4" anchors on 6" alternating ...
    Citation
  • 4587
    P12-201-4505 NA Klamath Project, OR-CA. Center Canal Flume -- View of second repaired joint where slope walls join vertical walls. This was repaired the same as the first joint; January 12, 1978; USBR ...
    Citation
  • 4588
    P12-201-4506 NA Klamath Project, OR-CA. Center Canal Flume -- View of floor and south wall looking down at the joint between the new and old portions of the flume. This joint was repaired using a rubber ...
    Citation
  • 4589
    P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
    Citation
  • 4590
    P12-201-4508 NA Klamath Project, OR-CA. Center Canal Flume -- View looking SE at outlet area of Center Canal Flume after second dewatering was removed and after flume repairs were completed; January 13, ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4592
    P12-201-4510 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows north wall of siphon inlet transition after compacted backfill operations were approximately 50% completed. Note plastic covering ...
    Citation
  • 4593
    P12-201-4511 NA Klamath Project, OR-CA. Pumping Plant FF -- View of inlet to siphon at Plant FF; January 27, 1978; USBR photo by D.J. Kline
    Citation
  • 4594
    P12-201-4512 NA Klamath Project, OR-CA. Ady Canal -- View of siphon round to square transition at the outlet west of the SP RR embankment. Photo shows cribbing and reinforcement prior to removal before ...
    Citation
  • 4595
    P12-201-4513 NA Klamath Project, OR-CA. Ady Canal -- View of west bank of SP RR after outler (sic) layer of cribbing and reinforcement were removed. It was deemed unsafe to remove anymore of this cribbing. ...
    Citation
  • 4596
    P12-201-4514 NA Klamath Project, OR-CA. Ady Canal -- Note tunnel liner plate extending past tunnel under railroad. Note cemented joint between CMP and round to square transition of siphon. Also note 2 ...
    Citation
  • 4597
    P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
    Citation
  • 4598
    P12-201-4516 NA Klamath Project, OR-CA. Ady Siphon -- This view looking from west to east into siphon outlet. Note SP railroad tracks across top of photo. At this point, concrete placement on slab portion ...
    Citation
  • 4599
    P12-201-4517 NA Klamath Project, OR-CA. Pumping Plant FF -- View of surface damage to 2,500 volt primary controller. This damage apparently took place during shipment from the east coast; February 28, ...
    Citation
  • 4600
    P12-201-4518 NA Klamath Project, OR-CA. Pumping Plant FF -- View of surface damage to 2,500 volt primary controller. This damage apparently took place during shipment from the east coast; February 28, ...
    Citation
  • 4601
    P12-201-4519 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows spoils from excavation for inlet to Plant FF; February 28, 1978; USBR photo by D.J. Kline
    Citation
  • 4602
    P12-201-4520 NA Klamath Project, OR-CA. Ady Siphon -- View of south wall of siphon inlet transition and portion of backfill over 84-inch RCP; February 28, 1978; USBR photo by D.J. Kline
    Citation
  • 4603
    P12-201-4521 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc excavating inlet to plant FF. Note Plant F on right side of photo; March 2, 1978; USBR photo by D.J. Kline
    Citation
  • 4604
    P12-201-4522 NA Klamath Project, OR-CA. Pumping Plant FF - Photo showing inlet to plant FF. Note riprap placement. Trash racks are covered for the dual purpose of heat retention to aid in curing freshly ...
    Citation
  • 4605
    P12-201-4523 NA Klamath Project, OR-CA. Plant FF No. 3 bay, between elev. A and B decks. Note effect of cleanup and also newly painted exterior surfaces of pump bowl and lower column; March 3, 1978; USBR ...
    Citation
  • 4606
    P12-201-4524 NA Klamath Project, OR-CA. Pumping Plant FF -- Same as previous photo, except this view is of Plant FF, Bay # 2; March 3, 1978; USBR photo by D.J. Kline
    Citation
  • 4607
    P12-201-4525 NA Klamath Project, OR-CA. Pumping Plant FF -- Same as previous photos, except this view is of Plant FF, Bay # 1; March 3, 1978; USBR photo by D.J. Kline
    Citation
  • 4608
    P12-201-4526 NA Klamath Project, OR-CA. View of trashracks at Plant FF. Note color range from dark to light. The lighter color is phenolic aluminum paint added to protect coal tar epoxy from sunlight; ...
    Citation
  • 4609
    P12-201-4527 NA Klamath Project, OR-CA. Photo shows Manitowoc dragline with 80 ft. boom and 2 1/4 cu.yd. bucket excavating drain upstream of plant FF inlet. Inlet transition can be seen, looking east. ...
    Citation
  • 4610
    P12-201-4528 NA Klamath Project, OR-CA. Cold weather protection that was installed for painting Plant FF pump units and also utilized for dressing up face of wall where spillage occurred when placing deck ...
    Citation
  • 4611
    P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high ...
    Citation
  • 4612
    P12-201-4530 NA Klamath Project, OR-CA. Same view as Photo P-12-201-4529, except looking east; February 1978; USBR photo by D.J. Kline
    Citation
  • 4613
    P12-201-4531 NA Klamath Project, OR-CA. View shows open gates on Ady Canal after they had been closed to make 84" RCP crossing under Straits Drain; February 1978; USBR photo by D.J. Kline
    Citation
  • 4615
    P12-201-4533 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc completing the connection of Klamath Straits Drain to Plant FF's inlet; March 13, 1978; USBR photo by D.J. Kline
    Citation
  • 4616
    P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
    Citation
  • 4618
    P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
    Citation
  • 4619
    P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
    Citation
  • 4624
    P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
    Citation
  • 4625
    P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
    Citation
  • 4627
    P12-201-4545NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from south side of flume where the bridge crosses, looking to the NW of flume inlet. Note water surface and disturbance on ...
    Citation
  • 4628
    P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
    Citation
  • 4629
    P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
    Citation
  • 4630
    P12-201-4548NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from north looking south of flume bridge area. An apparent slip fault was noted where shovel is standing between flume north ...
    Citation
  • 4631
    P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
    Citation
  • 4632
    P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
    Citation
  • 4633
    P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
    Citation
  • 4634
    P12-201-4552NA Klamath Project, OR-CA. Pumping Plant E. Photo shows Bucyrus Erie 22B and TD-20 cat, both of which have been crossing repeatedly on flume bridge east side; April 7, 1978; USBR photo by ...
    Citation
  • 4635
    P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
    Citation
  • 4636
    P12-201-4554NA Klamath Project, OR-CA. Pumping Plant E Bridge. Note that hillman rollers pivot for the turn under full load and with load stationary; April 1978; USBR photo by D.J. Kline
    Citation
  • 4637
    P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR ...
    Citation
  • 4638
    P12-201-4556NA Klamath Project, OR-CA. Pumping Plant E Bridge. Tow line is hooked up to HD-5 cat to provide momentum to bridge section across main traverse; April 1978; USBR photo by D.J. Kline
    Citation
  • 4639
    P12-201-4557NA Klamath Project, OR-CA. Pumping Plant E Bridge. Bridge section is in position over abutments and is jacked down onto bearing pads in stages; April 1978; USBR photo by D.J. Kline
    Citation
  • 4640
    P12-201-4558NA Klamath Project, OR-CA. Pumping Plant E Bridge. Completed and ready for travel; May 1978; USBR photo by D.J. Kline
    Citation
  • 4641
    P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
    Citation
  • 4642
    P12-201-4560NA Klamath Project, OR-CA. Center Canal Flume Bridge. Two holes precut into steel sleeve on one side only, prior to pile fitting; April 4, 1978; USBR photo by D.J. Kline
    Citation
  • 4643
    P12-201-4561NA Klamath Project, OR-CA. Center Canal Flume Bridge. Flume Bridge south abutment. Original driven pile trimmed and ready to receive steel splice sleeve; April 4, 1978; USBR photo by D.J. ...
    Citation
  • 4644
    P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
    Citation
  • 4645
    P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
    Citation
  • 4646
    P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
    Citation
  • 4647
    P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
    Citation
  • 4648
    P12-201-4566NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as shown to fill 84" RCP prior to testing 84" CMP; April 6, 1978; USBR photo ...
    Citation
  • 4649
    P12-201-4567NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon outlet transition wa also flooded prior to CMP test as shown; April 6, 1978; USBR photo by D.J. Kline
    Citation
  • 4650
    P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
    Citation
  • 4651
    P12-201-4569NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Shown is standpipe with fill hose attached. Note plastic tube with colored water used for water level indicator. ...
    Citation
  • 4652
    P12-201-4570NA Klamath Project, OR-CA. Pumping Plant EE. Bucyrus Erie 22-B dragline excavating drain inlet to Plant EE. Note inlet was flooded prior to connecting drain to pumping plant; April 11, ...
    Citation
  • 4653
    P12-201-4571NA Klamath Project, OR-CA. Plant EE. Muck from inlet excavation was double and triple hauled from inlet to just south of flume bridge, then over flume to spoils pile south of flume. It was ...
    Citation
  • 4654
    P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at ...
    Citation
  • 4655
    P12-201-4573NA Klamath Project, OR-CA. Pumping Plant EE. View of combined inlet to Pumping Plants E and EE. More work remains to be done on rounded point between the two transitions; April 17, 1978; ...
    Citation
  • 4656
    P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
    Citation
  • 4657
    P12-201-4575NA Klamath Project, OR-CA. Center Canal Flume Bridge. Assembly of 4 prestressed 11-ton concrete beams. Note dowels and Elasto Meric bearing pads in place (south abutment); April 21, 1978; ...
    Citation
  • 4658
    P12-201-4576NA Klamath Project, OR-CA. Center Canal Flume Bridge. Setting of first section of bridge; April 21, 1978; USBR photo by D.J. Kline
    Citation
  • 4659
    P12-201-4577NA Klamath Project, OR-CA. Center Canal Flume Bridge. 3500 Manitowoc handled the 11-ton bridge deck load with no problems; April 21, 1978; USBR photo by D.J. Kline
    Citation
  • 4660
    P12-201-4578NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note hairline cracks in top surface of bridge. View is along west side of bridge; April 24, 1978; USBR photo by D.J. Kline
    Citation
  • 4661
    P12-201-4579NA Klamath Project, OR-CA. Center Canal Flume Bridge. All 4 beams in position prior to grouting. View looking north; April 24, 1978; USBR photo by D.J. Kline
    Citation
  • 4662
    P12-201-4580NA Klamath Project, OR-CA. Pumping Plant EE. Unit #1 is activated with Unit #3 and #2 running; June 1978; USBR photo by D.J. Kline
    Citation
  • 4663
    P12-201-4581NA Klamath Project, OR-CA. Pumping Plant EE. All 3 pumping units running normally; June 1978; USBR photo by D.J. Kline
    Citation
  • 4664
    P12-201-4582NA Klamath Project, OR-CA. Klamath Str. Unit West -- S-16 drain enlargement taken from atop Klamath Str. Drain West dike looking west; February 1979; USBR photo by D.J. Kline
    Citation