    P12-201-4456 NA Klamath Project, OR-CA. Ady Canal--Same as photo 4455NA, but view looking from RR east toward highway; September 1977; USBR photo by D.J. Kline
    Citation
  • 4539
    P12-201-4457 NA Klamath Project, OR-CA. View looking south. Pumping plant FF outlet structure slab 2' extended on foreground and backside. Also 1' extended on left side; September 1977; USBR photo ...
    Citation
  • 4540
    P12-201-4458 NA Klamath Project, OR-CA. Pumping Plant FF--north retaining wall section "B" of slab step section. Concrete placement in progress; September 1977; USBR photo by D.J. Kline
    Citation
  • 4541
    P12-201-4549 NA Klamath Project, OR-CA. View looking east. Pumping Plant FF--north retaining wall. Section "A" placed previously. Section "B" where laborers working and Section "C" freshly placed concrete ...
    Citation
  • 4542
    P12-201-4460 NA Klamath Project, OR-CA. View looking east. Pumping Plant EE--outlet transition material HD-5 Cat and laborer are standing on is imported 3/" minus with fines. This material is 1' deep. ...
    Citation
  • 4543
    P12-201-4461 NA Klamath Project, OR-CA. PP EE--view looking south. Hanging flap gates on PP EE outlet structure, using Pettibone 30 Crane. Note: Curing compound had been sand blasted prior to flap gate ...
    Citation
  • 4544
    P12-201-4462 NA Klamath Project, OR-CA. PP EE PP&L work on new elevated transformer assembly. Note: The bow in center of aluminum frame holding up transformers; October 1977; USBR photo by D.J. Kline. ...
    Citation
  • 4545
    P12-201-4463 NA Klamath Project, OR-CA. Center Canal Flume--view looking east. Placement of rip rap on east bank of drain under flume; October 1977; USBR photo by D.J. Kline
    Citation
  • 4546
    P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
    Citation
  • 4554
    P12-201-4472 NA Klamath Project, OR-CA. Another view of the PP 'E' bridge, west side. Three (3) short piling have been driven to specs.; two center piling are driven to 31' depth; November 22, 1977; USBR ...
    Citation