Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J.

Search Results

  • 4578
    P12-201-4496 NA Klamath Project, OR-CA. Crossing completed and 3500 on its way to PP FF; Nov. 28, 1977; USBR photo by D.J. Kline
    Citation
  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4580
    P12-201-4498 NA Klamath Project, OR-CA. Pumping Plant FF -- Cat 225 backhoe finishing up access road into trench for 84" RCP; Dec. 1, 1977; USBR photo by D.J. Kline
    Citation
  • 4581
    P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
    Citation
  • 4582
    P12-201-4500 NA Klamath Project, OR-CA. Ady Canal -- Siphon forming going up for round to square transition on outlet of 84" CMP. Bulkhead in background is for shoring tunnel exit from under SP RR tracks; ...
    Citation
  • 4583
    P12-201-4501 NA Klamath Project, OR-CA. Center Canal Flume -- Photo shows crack on floor joint of flume after cleanup. These were dried using propane heaters overnight prior to repairs. These joint openings ...
    Citation
  • 4584
    P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
    Citation
  • 4585
    P12-201-4503 NA Klamath Project, OR-CA. Center Canal Flume -- Curing tent used in repair of joint (photos 4501NA & 4502NA of flume repairs). Also shows location of this joint in relation to flume wooden ...
    Citation
  • 4586
    P12-201-4504 NA Klamath Project, OR-CA. Center Canal Flume -- Repaired joint shown in previous photos. Used a 6" neoprene waterstop and a 3 part PRC sealer. Also drilled 3/4" anchors on 6" alternating ...
    Citation
  • 4587
    P12-201-4505 NA Klamath Project, OR-CA. Center Canal Flume -- View of second repaired joint where slope walls join vertical walls. This was repaired the same as the first joint; January 12, 1978; USBR ...
    Citation