  • 4567
    P12-201-4485 NA Klamath Project, OR-CA. View of PP 'FF' inlet to siphon transition looking from outlet structure west; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4568
    P12-201-4486 NA Klamath Project, OR-CA. Placement of PP 'FF' inlet transition to siphon; November 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4577
    P12-201-4495 NA Klamath Project, OR-CA. Concrete placement of PP FF inlet to siphon structure. Looking from west at oulet end; November 30, 1977; USBR photo by D.J. Kline
    Citation
  • 4592
    P12-201-4510 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows north wall of siphon inlet transition after compacted backfill operations were approximately 50% completed. Note plastic covering ...
    Citation
  • 4593
    P12-201-4511 NA Klamath Project, OR-CA. Pumping Plant FF -- View of inlet to siphon at Plant FF; January 27, 1978; USBR photo by D.J. Kline
    Citation
  • 4648
    P12-201-4566NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as shown to fill 84" RCP prior to testing 84" CMP; April 6, 1978; USBR photo ...
    Citation
  • 4649
    P12-201-4567NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon outlet transition wa also flooded prior to CMP test as shown; April 6, 1978; USBR photo by D.J. Kline
    Citation
  • 4650
    P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
    Citation
  • 4651
    P12-201-4569NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Shown is standpipe with fill hose attached. Note plastic tube with colored water used for water level indicator. ...