Search

You searched for: Start Over History Remove constraint History Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Pumping Plant EE (Oregon) Remove constraint Subject: Pumping Plant EE (Oregon)

Search Results

  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4611
    P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high ...
    Citation
  • 4612
    P12-201-4530 NA Klamath Project, OR-CA. Same view as Photo P-12-201-4529, except looking east; February 1978; USBR photo by D.J. Kline
    Citation
  • 4616
    P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
    Citation
  • 4652
    P12-201-4570NA Klamath Project, OR-CA. Pumping Plant EE. Bucyrus Erie 22-B dragline excavating drain inlet to Plant EE. Note inlet was flooded prior to connecting drain to pumping plant; April 11, ...
    Citation
  • 4653
    P12-201-4571NA Klamath Project, OR-CA. Plant EE. Muck from inlet excavation was double and triple hauled from inlet to just south of flume bridge, then over flume to spoils pile south of flume. It was ...
    Citation
  • 4655
    P12-201-4573NA Klamath Project, OR-CA. Pumping Plant EE. View of combined inlet to Pumping Plants E and EE. More work remains to be done on rounded point between the two transitions; April 17, 1978; ...
    Citation
  • 4656
    P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
    Citation
  • 4662
    P12-201-4580NA Klamath Project, OR-CA. Pumping Plant EE. Unit #1 is activated with Unit #3 and #2 running; June 1978; USBR photo by D.J. Kline
    Citation